City of Melrose annual report 1920, Part 7

Author: Melrose (Mass.)
Publication date: 1920
Publisher:
Number of Pages: 278


USA > Massachusetts > Middlesex County > Melrose > City of Melrose annual report 1920 > Part 7


Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).


Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11


City Maps


$108.90


Use of automobile


125.00


Schoolhouse inspection


33.00


Printing Public Works Dept. Report


45.00


Stamps, stationery and sundries


290.44


Telephone service


35.26


Advertising


25.90


Recording deeds, etc.


31.61


$695.11


Balance


$7.99


WATER DIVISION


Cement mains on Orris Street from Garden Street to Walton Park, Renwick Road from Richardson Road to the Wakefield Line were re- placed by Cast Iron Pipe and at a lower depth, and Upland Road main extended.


Fifty new services were laid and one service abandoned.


Hydrants and Gates


No additional hydrants have been placed. One hydrant was abandoned. Hydrants are maintained by this Department.


Seven gates have been placed and one abandoned.


Water Meters


.


Fifty-three meters have been installed and twenty removed. Twenty-three meters were placed on new services put in the past year. Ten meters were added to existing services already metered and twenty meters added to services previously put in but not metered.


121


REPORT OF PUBLIC WORKS DEPARTMENT


Maintenance and Operation


The entire system of mains, services, hygrants, water meters, etc. has had careful attention, and the necessary repairs and changes have been made. Following are some of the items:


7 services in private premises cleaned.


27 joints in iron pipe repaired.


44 service leaks in street repaired.


33 services in street cleaned.


7 breaks in cement pipe repaired.


29 services in street renewed with lead.


5 services in street renewed with lead lined.


28 services in private premises renewed with lead.


5 services in private premises renewed with lead lined.


28 gates repacked.


Hydrants have been oiled, repaired, painted and kept free from snow and ice. The Table of Relay gives length, size, etc., of cast iron pipe · used to replace defective or small cement pipe. There still re- mains about ten and seventy-three one hundredths (10.73) miles of cement pipe that should be replaced by cast iron pipe as soon as pos- sible.


122


CITY OF MELROSE


Total Pipeage of the City


Length in feet 3/4 inch pipe.


1,363


Length in feet, 1 inch pipe. 2,105


Length in feet, 11/2 inch pipe 373


Length in feet, 2 inch pipe 6,476


Length in feet, 4 inch pipe.


55,209


Length in feet, 6 inch pipe 153,434


Length in feet, 8 inch pipe


25.731


Length in feet, 10 inch pipe


20,334


Length in feet, 12 inch pipe.


23,097


Length in feet, 14 inch pipe


3,024


Length in feet, 16 inch pipe


5,223


Total 296,371


Length of cast iron pipe, 239,702 feet or 45.40 miles.


Length of cement pipe, 56,669 feet or 10.73 miles.


Total miles, 56.13.


Number of services in use


4,271


Number of meters


4,419


Number of fire hydrants 383


Number of gates on mains 688


Number of stand pipes for street sprinkling 33


Number of watering troughs


2


Number of ornamental fountains


3


Number of drinking fountains (bubblers)


9


Number of fire services 20


123


REPORT OF PUBLIC WORKS DEPARTMENT


WATER CONSTRUCTION-1920


Cast Iron Pipe Laid


Gates


LOCATION


Length Feet


Size Inches


No.


Size Inches


Griswold Road at Main St ....


11


6


1


6


Hawley Road at Main St ...


19


6


1


6


Holland Road at Hydrant.


1


6


Orris Street at Warren St ..


1


6


Orris Street at Mendum St.


4


6


1


6


Renwick Road at Hydrant.


1


6


Upland Road Extension, easterly


60


6


Proposed Street off Main St.


12


6


1


6


Totals


106


7


WATER RELAY-1920


Cast Iron Pipe Laid


Pipe Abandoned


LOCATION


Length Feet


Size Inches


Length Feet


Size Inches


Holland Road


8


6


8


6


cast iron cement


Orris Street


333


6


333


4


Orris Street


11


8


11


4


1 cast iron


Renwick Road


376


6


376


4


cement


Richardson Road


190


6


Lowered


cast iron


Sears Avenue


155


6


Lowered


cast iron


Kind


124


CITY OF MELROSE


WATER ASSESSMENTS AND CONSUMPTION


The annual assessments paid by the City of Melrose as its pro- portional part of the cost and operation of the Metropolitan Water Works are given below:


Year


Total


1898


$2,332.94


1899


4,921.63


1900


6,740.49


1901


12,546.32


1902


14,434.93


1903


17,815.34


1904


19,722.73


1905.


20,478.53


1906.


25,230.09


1907.


26,971.19


1908


28,693.90


1909


24,523.38


1910


19,640.91


1911.


21,200.58


1912


20,978.01


1913.


22,684.86


1914.


22,647.92


1915.


19,321.32


1916.


18,936.29


1917


18,835.83


1918


20,222.33


1919.


22,670.68


1920


23,153.10


The average daily per capita consumption (gallons) of water in Melrose, as recorded by the Venturi meter, operated by the Metropoli- tan Water Works is shown for the years 1907-09 and 1917-20.


1907


1908


1909


1917


1918


1919


1920


118


89


63


51


66


58


61


In 1908 general metering of the City was commenced and in 1909 practically all services were metered. All new services are metered when put in use. Tables show saving made by metering.


CONSTRUCTION


Balance Jan. 1, 1920.


$10,789.28


Less Appropriation for Ell Pond Park


1,500.00


$9,289.28


125


REPORT OF PUBLIC WORKS DEPARTMENT


Expended


Services:


Stock and insurance


$897.04


Labor and teams


1,526.81


2.423.85


Meters Installed :


Stock and insurance


$53.38


Labor and teams


85.41


138.79


Main Lines :


Stock and insuran e


$1,090.34


Labor and teams


1,340.51


2.430.85


4,993.49


Balance


$4.295.79


MAINTENANCE


Appropriation


$20,000.00


Expended


Services, maintenance and repairs .


$3,166.88


Relay main lines


2,307.07


Maintenance and operation main lines


1,656.22


Maintenance and operation hydrants


744.84


Meters, reading


2,257.00


Meters, remove and repair


1,539.54


Salaries and general account


3,335.94


Hardware and sundries


431.20


Stamps and stationery


372.41


Telephone services


111.60


Stock, labor and insurance


245.06


Travellers Insurance Co.


188.76


Rent of yard


161.91


$16,518.43


Balance


$3.481.57


INSIDE SERVICES AND CHARGES


Total receipts


$4,219.19 598.85


3.620.34


Less refunds


126


CITY OF MELROSE


Expended


Payrolls, insurance and tools


$1,825.22


Stock and teams


1.752.40


Overdraft 1919


42.72


3,620.34


Stock Account


Stock on hand Jan. 1, 1920.


$7,985.55


Stock purchased 1920


4,435.26


Stock. labor and yard rent


398.70


$12,819.51


Credit


By stock charged other accounts


$4,138.38


By stock maintenance account


1,523.09


5,661.47


Balance


$7.158.04


Cost of System


Construction to Jan. 1, 1920


$509,470.88


Construction 1920


4,993.49


Total cost to Jan. 1, 1921


$514,464.37


Water Rates


Received by Treasurer :


1914


$19.75


1915


2.25


1916


10.00


1917


25.43


1918


94.28


1919


8,118.91


1920


43.483.62


$51,754.24


Summons


105.60


$51,859.84


$53,534.67


1920 rates as billed.


127


REPORT OF PUBLIC WORKS DEPARTMENT


HIGHWAYS


Main Street .- The contract was awarded Simpson Brothers Cor- poration for the construction of the Hassam Compressed Concrete Pavement from the end of the pavement laid in 1913 near Porter Street to the Wakefield Line. Construction was commenced April 29 and completed September 9. This was a much needed improvement and the pavement on Main Street is a credit to the City.


On account of recent legislation relieving Street Railway Companies from paving tracks, new construction, etc., the Railway Company would not reuew the rails and paving, or repave between and in the tracks, or change the grade of the tracks, and only repairs were made where joints or rails were defective.


Edgestone was reset where out of line and grade aud sidewalks repaired. The old material excavated to be replaced by the new pave- ment was used for street construction on Tremont Street at Ell Pond, Albion Street, Day Street, Pratt Street, Cliff Street, Avon Street, Hesseltine Avenue, Pearl Street, Boardman Avenue, Briggs Street, School Street, Mystic Avenue and Rowe Street. This material spread to grade and rolled improved all the above streets at a small expense. The granite blocks from gutters and crossings not required on the work have been used for paving gutters in various parts or the City or stored for future use.


Linwood Avenue from Lynde Street to Park Street was macada- mized and the work should be continued to Sylvan Street.


Sears Avenue .- Edgestones were set on both sides, gutters paved, sidewalks and lawus graded, catch basins built and the roadway near- ly completed. This work was unusually difficult as such a number of very large boulders were encountered and the ledge near Orris Street was very hard and dangerous stone to blast.


Main Street at Essex Street .- The corner of Essex and Main Streets has been rounded, making a very decided improvement.


Main Street and Porter Street .- The northerly corner of Porter and Main Streets has been rounded to correspond with the Hospital corner and the angle at Main and Green Streets rounded. These changes are improvements, making these corners much safer for traffic.


Garden Street construction was completed and Sanford Street and Geneva Road nearly completed.


Marvin Rcad at the junction of Richardson Road and a part of Richardson Road was filled, regraded and rolled.


All highways previously treated with tar or asphalt have been kept in good condition by filling and patching all holes or depressions with a tar mixture manufactured for the purpose, and the streets where necessary were treated with a dust laying coat of tar covered with sand.


128


CITY OF MELROSE


Additional streets have been added to the street sprinkling list. and treated with tar for a dust layer.


While the conditions relative to materials and labor did not im- prove, in fact the cost of labor and materials was higher than in pre- vious years and difficult to obtain, the work of the Department has been carried on successfully.


Surface Drainage


The narrow stone culvert on Swains Pond Avenue, near No. 314, was replaced with 24-inch drain pipe to relieve flooding of land above Swains Pond Avenue.


The wooden covered bridge on Whittier Street at Spot Pond Brook, being in a dangerous condition, was replaced with cement stone sidewalls and reinforced concrete top. The wooden cover was replaced by reinforced concrete and walls rebuilt on Spot Pond Brook at drive- way to Gibbon's stable.


Spot Pond Brook was widened, walled and reinforced concrete cover constructed south of Wyoming Avenue between No. 160 and No. 164. a distance of about a hundred feet.


Surface drains and catch basins have been constructed on Albion Street near Franklin Street and Day Street southerly. Grove Street, Burnett Street westerly, Geneva Road across private land to First Street. Cleveland Street, Sanford Street to Maple Street, and catch basins and man holes in various streets in other parts of the City.


Brooks


The open brooks have had careful attention and these should be widened and improved, as our street drainage systems empty into these open brooks and on their condition depends the success of the entire system.


Sidewalks


There have been 6,330 linear feet of new edgestones set and 2.461 linear feet of edgestones reset, in connection with which it was neces- sary to replace 462 square yards of gutters.


There have been 799 square yards of granolithic and 111 square yards of new tar concrete sidewalks constructed. Under repairs to present walks 1,701 square yards of three coat work, 750 square yards. of two coat work, and 2,148 square yards of top-dressing of tar con- crete sidewalks have been repaired.


129


REPORT OF PUBLIC WORKS DEPARTMENT


Street Trees


Eleven Norway maple trees were set out where requests were made, the applicant paying $2.50, which was about one-half the expense, and two set out to replace dead trees.


All trees set out in recent years by the Department are thriving, but they should have careful attention to protect them from insect pests, and be properly pruned.


The old trees should have all dead wood removed, the low hanging branches cut off and all necessary trimming done. To do this work it will be necessary to have larger appropriations for the care of trees.


GENERAL ADMINISTRATION


Appropriation


$3,000.00


Expended


Bookkeeper, part salary


$838.00


Asst. Supt., part salary


1,570.75


Use of automobile


515.00


Labor


76.25


3,000.00


HIGHWAY REPAIRING


Balance from 1919


$1,577.93


Appropriation


25,000.00


Street Railway Tax


556.92


$37,134.85


Expended


Labor as per pay rolls


$25.295.13


Stock and invoices


$26,351.33


Less sold and transferred to other Accounts


14.993.68


11,357.65


36,652.78


Balance


$482.07


SEARS AVENUE


Appropriation


$11,000.00


130


CITY OF MELROSE


Expended


Street work


$5,555.83


Changing manholes


39.09


Edgestones


3,084.19


Paving


797.03


9,476.14


Balance


$1,523.86


Not finished.


MARVIN ROAD


Balance 1919


$61.46


Expended, labor per pay roll.


61.46


GENEVA ROAD


Balance 1919


$67.86


Expended, labor and teams


14.00


Balance


$53.86


GARDEN STREET


Balance 1919 $490.43


Expended


Labor and teams


$92.01


Stock and rolling


39.00


Insurance and tools


12.06


143.07


Balance


$347.36


LINWOOD AVENUE


Appropriation


$6,500.00


Expended


Labor and teams


$3,195.42


Stock and rolling


3,296.69


6,492.11


Balance $7.89


131


REPORT OF PUBLIC WORKS DEPARTMENT


SANFORD STREET


Appropriation


$1,200.00


Expended


Labor and teams


$755.39


Gravel


1 132.00


Insurance and tools


74.44


961.83


Balance


$238.17


Not finished.


EAST FOSTER STREET


Appropriation


$8,600.00 No expenditures.


WAVERLY PLACE


Appropriation


$11,000.00


No expenditures.


ESSEX AND MAIN STREETS Rounding Corner


Appropriation


$450.00


Expended


Edgestones


$95.70


Labor and teams


225.28


Cement


20.00


Concrete


84.00


Sand


3.10


428.08


Balance


$21.92


PORTER AND MAIN STREETS


Rounding Corner


Appropriation


$325.00


D


132


CITY OF MELROSE


Expended


Labor as per pay rolls


4.68


$320.32


Not finished.


MAIN STREET


Concrete Paving


Appropriation


$55,000.00


Expended


Simpson Brothers, contract


$51,937.15


C. L. Hoffman & Son, concrete repairs


1,238.53


$53,175.68


Balance


$1,824.32


Unexpended Balances


Argyle Street.


$47.64


Folsom Avenue


134.23


Garden Street


347.36


Hopkins Street


83.20


Lynde Avenue


218.48


Malvern Street


340.70


Myrtle Street


16.45


Pleasant Street


1,022.28


Swains Pond Avenue


.34


Warwick Road


272.75


MISCELLANEOUS


Ice for Drinking Fountain:


Appropriation


$100.00


Expended


D. Levy for ice. 33.60


Balance


$66.40


Removal of snow from Ell Pond:


Appropriation


74.91


Expended


61.38


Balance


13.53


74.91


REPORT OF PUBLIC WORKS DEPARTMENT


133


Pensions:


Appropriation


$3.000.00


Expended


Pay rolls


1,727.98


Balance


$1,272.02


Vacations:


Appropriation


$4,000.00


Expended


Pay rolls


3,555.40


Balance $444.60


Removal of snow and sanding:


Appropriation


$10.000.00


Overdraft to 1921 account


4.50


$10.004.50


Expended


Labor as per pay rolls


$10.000.00


Advertising


4.50


$10.004.50


MEMORIAL BUILDING


Salaries and Wages


Appropriation


$3.000.00


Appropriation


72.00


$3.072.00


Less transfer


900.00


$2,172.00


Expended


Salaries and wages as per pay rolls.


$1.982.91


Liability insurance


29.70


2.012.61


Balance


$159.39


1


OTHER EXPENSES


Appropriation


$4,000.00


Transfer


900.00


Collection>


2.72


$4,902.72


134


CITY OF MELROSE


Expended


Electric power


$480.56


Electric lighting


488.51


Gas Lighting


54.15


Supplies and telephone


215.58


Heating


1,407.76


Repairing


749.48


Labor


880.94


Water Rates


49.09


$4.326.07


Balance


$576.65


Amount billed for use of Auditorium and G. A. R. Hall:


Auditorium


$5,524.24


G. A. R. Hall


1,249.67


$6.773.91


CITY HALL


Salaries and Wages


Appropriation


$2,000.00


Appropriation


72.00


Transfer


250.00


$2,322.00


Expended


Labor as per pay rolls


$2.271.76


Liability insurance


29.70


2,301.46


Balance


$20.54


OTHER EXPENSES


Appropriation


$3,000.00


Transfer


500.00


$3,500.00


Expended


Supplies


$398.50


Repairs


301.85


Coal and wood


1,191.25


Electric Lighting


1,214.85


Gas lighting


77.73


Plants for vase.


114.10


135


REPORT OF PUBLIC WORKS DEPARTMENT


Water rates


89.35


Labor


108.58


$3,496.24


Less collections


43.60


$3,452.64


Balance


' $47.36


Amount billed for use of Hall.


$1,125.00


OUTSIDE REPAIRS


Appropriation


$1,000.00


Expended


Mason work


$17.50


Lumber


14.38


Slate and labor


16.00


Labor on weather vane


8.29 ·


Labor, carpenter work


10.00


Tar concrete


222.16


Painting


705.94


Hardware


.59


994.86


$5.14


CROSSWALKS AND PAVING


Balance from 1919


$6,248.62


Expended


Labor and teams


$3,001.75


Insurance and tools


300.17


3,301.92


$2,946.70


INSURANCE


Appropriation


$2,000.00


Return premium


8.03


$2,008.03


Less transfer


400.00 .


$1,608.03


136


CITY OF MELROSE


Expended


Premiums on policies


1,547.87


Balance


$60.16


PLANTING NEW TREES


Appropriation


$500.00


Receipts


27.50


$627.50


Less transfer


396.00


$131.50


Expended


Labor and teams


$96.75


Trees


32.50


Advertising


2.25


$131.50


CARE OF TREES


Appropriation


$800.00


Transfers from other accounts


796.00


$1,596.00


Expended


Labor and teams


$1,126.58


Insurance and tools


109.61


1,236.19


Balance


$359.81


STREET LIGHTING


Appropriation


$22,000.00


Received from Park Dept


270.00


$22,270.00


Expended


Malden Electric Co., as per contract


21,654.42


Balance $615.58


REPORT OF PUBLIC WORKS DEPARTMENT


137


STREET SPRINKLING


Appropriation


$1,000.00 12,128.73 $13,128.73


Assessments


Expended


Labor and teams


$4.350.19


Tarvia


8,778.54


13.128.73


STREET CLEANING


Appropriation


.. $6,000.00


Transfer


410.39


$6.410.39


Expended


Labor and teams


$6,410.39


COLLECTION OF ASHES AND RUBBISH


Appropriation


$11,000.00


Expended


Labor and teams


$10,673.76


Insurance, tools and supplies


283.68


Labor, delivering ash cards


42.56


$11,000.00


STREET GUIDE BOARDS AND NUMBERS


Appropriation


$500.00


Expended


Labor


$62.32


Signs


233.00


Sign irons


10.40


Hardware


2.53


House numbers


7.60


$315.85


Balance $184.15


138


CITY OF MELROSE


CONTINUOUS WALKS


Balance 1919


$7,135.59


Appropriation


10,000.00


Transfer


2,038.22


Collections


9,900.82


$29,074.63


Expended


Pay rolls


$2,439.18


Invoices


10,868.30


Highway Division acct.


455.79


Repair Walks acct.


35.65


Reserve due on edgestones


106.62


$13,905.54


Balance


$15,169.09


INDIVIDUAL WALKS


Appropriation


$1,000.00


Balance 1919


1,246.15


Collections


1,862.55


$4,108.70


Less transfer to repair of walks


800.00


$3,308.70


Expended


Labør per pay rolls


$746.11


Invoices


1,488.81


Highway stock and teams


136.05


Reserve due on edgestones


38.78


2,409.75


Balance


$898.95


REPAIR PRESENT WALKS


Appropriation


$3,000.00


Transfer from Continuous Walks


35.65


Transfer from Individual Walks


800.00


$3.835.65


139


REPORT OF PUBLIC WORKS DEPARTMENT


Expended


Labor per pay rolls


$229.87


Highway Division, teams and stock


64.86


Paving brick Concrete work


224.25


3,278.41


3.797.39


Balance $38.26


CONTINUOUS WALKS-1920 One Half Cost Assessed to Abuttors


STREET


Side


From


To


Concrete Sq. Yds


Sodding Sq. Ft.


Straight


Curved


Drives


Walks


* Ashland St.


West . | Marvin Rd.


Southerly


214.00


16.90


2


* Ashland St.


'East. . Richardson


Rd.


. ¡ Southerly


166.00


5.40


* Ashland St.


JEast. . |No. 123


Northerly


200.40


8


4,485.43


Beech Ave.


Both . Lebanon St.


Meridian St.


775.40


94.20


20


First St. and Parker St. N & W


Geneva Road


West. | Upham St.


|Southerly 180 ft.


200.80


4


109.31


545.00


Holland Road


W & S Emerson St.


Parkway


559.30


124.70


6


405.97


2,339.00


*Lincoln St.


[Both. [Emerson St.


Sawyer Rd.


739.70


12.50


4


Main St.


IN & W


121.00


53.40


Main St.


[East. . Porter St.


IGreen St.


166.00


Rowe St.


West . Emerson St.


ISoutherly


128.00


2


* Sanford St.


South. Florence St.


Cleveland St.


114.00


* Sargent St.


|West. |No. 74


36.50


* Sargent St.


No. 78


86.30


*Sargent St.


No. 86


50.00


*Sargent St.


[No. 90


35.90


133.94


1,625.00


Upham St.


|North. East St.


Westerly


3,593.30


307.10


54


649.22


111.04


9,436.43


* Not Completed.


Edgestone Lin. Ft.


No. of Blocks


Granolithic Sq. Yds.


111.04


442.00


INDIVIDUAL WALKS-1920


Edgestone Lin. Ft.


Granolithic


No. of Blocks


Sq. Yds. Conerete


Sq. Ft. Sodding


Remarks


ABUTTORS


LOCATION


Straight


Curved


Walks


Drives


Borden. F. P.


Cedar Park


294.70


2


Budding, H. B ..


131 W. Wyoming Ave.


1


Benoit, A. W ..


36 Irving St.


2


3.33


Removed


Bruce, K. R .. Baker, C. E ...


Elm St.


Berquist, H. G ..


5 Perkins St.


2


6.77


Colby, .1. H ..


Cedar Park


156.30


2


Congregational Church


Foster St. .


27.00


Chesterton & Co ..


E. Emerson St.


Coleman, Bessie L.


|104 Sargent St. 52 Richardson Rd.


22


3.47


Everson, C. H ..


Green St.


2.20


Flanders. Susan H Fulton, E. C.


19 Nowell Rd.


Grimes. Geo. A.


Main St.


Goss, F. H .. ..


173 Lebanon & First Sts.


123.00


14.80


Hope, Clarence E.


249 W. Emerson St ..


222


4.60


Hall, E. A.


Myrtle St.


Hislop, E. H ..


962 Main St.


Holden, Dr. C. P.


Winthron St.


37.24


20.00


Jenney Mfg. Co.


Main St.


2


16.66


29.90


Jenney


Mfg. Co.


Corey St.


Loring W. H.


Ashland St.


Leighton, E. L.


477 Lebanon St.


60.57


Mosher, Ira


21 Holland Rd.


Merrill, N. P.


41 Holland Rd ..


Mckenzie, Daniel


|182 Linwood Ave.


McAdam, J. A ..


| Wyoming Ave.


O'Brien, W. P.


118 Linwood Ave.


Perkins, F. ...


Essex St.


3.40


Drive moved


McQueeney, Thomas


17 Beverly St.


4.74


Rowell, W. A ..


34 Lincoln St.


Rendle, W. S.


50 Porter St.


Salt, Geo. E ..


Stevens Rd.


2


Scarborough. R. R ..


115 Baxter St.


Sawyer, H. F ..


114 Warwick Rd.


Sutherland. E. and W. J. Davis.


1057-59 Main St.


Stuart. C. L.


127 Perkins St.


6.16


Concrete only


Wuest, F. H ..


153 Beech Ave.


Woodsum. C. H.


Ferdinand St.


2


6.30


2


5.60


Drive moved Change Drive Drop Stone Drop Stone


2221


3.86


Driveway Widened


28 Rowe St.


2.58


Drop Stone


Demain, W. A.


Change Drive Drop Stone


Drop Stone


Drop Stone


Meridian St.


655.00


142


CITY OF MELROSE


SEWER DIVISION


Construction


Balance 1919


$6,051.44


Receipts


230.52


From other divisions, stock and labor


3,923.58


$10,205.54


Expended


Pay rolls


$2,971.17


Stock purchased


5,102.70


Highway stock and teams


1,416.14


Labor and stock transfer


117.10


9,607.11


Balance


$598.43


COST OF SYSTEM


Construction to Jan. 1, 1920


$506,549.96


Construction 1920


5,453.01


Total Cost


$512,002.97


Maintenance


Appropriation


$2,000.00


Collections


208.25


$2,208.25


Expended


Cleaning and repairing, labor and teams


$1,938.01


Stock and invoices


78.20


Liability insurance


192.04


$2,208.25


PRIVATE SEWERS


There have been thirty-five connections made with the main sewers the past year, making a total to January 1, 1921, of 3,409. (Cost of private sewers paid by applicant.)


Balance Jan. 1, 1920


$159.30


Receipts


3,394.81


Transfer


31.53


$3,585.64


143


REPORT OF PUBLIC WORKS DEPARTMENT


Expended


Pay rolls, labor and teams


$2,154.56


Sewer stock


817.88


Insurance and tools


231.92


Highway Teams


46.04


3,250.40


Balance


$335.24


SEWER CONSTRUCTION-1920


Pipe


STREET


LOCATION


Size Inches


Length Feet


Manholes


Argyle St.


Opp. No. 29 southerly


6


130


Eleventh St.


Upham St. southerly


6


325


2


Totals


455


2


SEWERS BUILT TO JANUARY 1, 1921


Number of feet of 6 in pipe


123,469


Number of feet of 8 inch pipe


54,895


Number of feet of 10 inch pipe.


17,529


Number of feet of 12 inch pipe


10,281


Number of feet of 15 inch pipe


3,839


Number of feet of 18 inch pipe


5,150


Number of feet of 20 inch pipe


2,788


Number of feet, of 24 inch pipe


1,213


Number of feet of 18 x 20 inch brick.


3,035


Number of feet of 20 inch brick


111


Number of feet of 24 inch brick.


28


Total


222,338


Note :- Total length of sewers 222,338 feet or 42.11 miles, 2.40 miles of which are owned and controlled by the Commonwealth of Massachusetts, but by Act of Legislature Melrose is permitted to use in the same manner as local sewers.


SURFACE DRAINAGE


Construction


Appropriation


$10,000.00


Balance 1919


4,213.79


Collections


340.66 $14,554.45


144


CITY OF MELROSE


Expended


Construction


$14,201.42


Balance


$353.03.


MAINTENANCE


Appropriation


$5,000.00


Collections


3.33


$5,003.33


Expended


Cleaning and repairing catch basins


$3,523.73


Cleaning drains


1,121.01


Stock invoice


11.36


Insurance and tools


343.80


4,999.90


Balance


$3.43


CLEANING BROOKS


Appropriation


$2,000.00


Expended


Labor and teams


$1,929.53


Lumber


36.68


Sewer construction stock


32.78


$1,998.99


Balance


1.01


SURFACE DRAINAGE CONSTRUCTION


Pipe


STREET


LOCATION


Size Inches


Length Feet


Manholes


Catch Basins


Albion Street


Near Day St.


12


56


1


Albion Street


At Franklin St.


24


76


1


Baxter Street


Beech Avenue


For conductors


8 × 6


162


Cleveland Street


Sanford St. to Maple St ..


12


556


2


3


Essex Street


On old drain


Franklin Street


Opp. Pratt St.


Geneva Road


Across private land


15


334


2


2


Grove Street


Burnett St. to Cumner Ave. At curve


12


400


1


2


Holland Road


Laurel Street


At Common


Rowe Street


Opp. No. 53


Sears Avenue


Short Street


At Main St ..


8 x 5.50


100


Spot Pond Brook


Culvert off Wyoming Ave.


24


44


1


1


Upham Street


[On old drain.


8 x 4.50


43


Whittier Street


Culvert


Total


1771


9


20


1


3


City Hall Yard.


1


1


1


1


3


1


Swains Pond Avenue


Culvert at low point ..


146


CITY OF MELROSE


SUMMARY OF IMPROVED SURFACE DRAINAGE CONSTRUCTED TO JANUARY 1, 1921


8 inch Akron pipe. 808 lin. ft.


10 inch Akron pipe


4,735 lin. ft.


12 inch Akron pipe. 29,922 lin. ft.


15 inch Akron pipe .


16,304 lin. ft. 284 lin. ft.


16 inch Akron pipe


18 inch Akron pipe


5,929 lin. ft.


20 inch Akron pipe


5,322 lin. ft.


20 inch iron pipe.


120 lin. ft.


24 inch Akron pipe.


2,252 lin. ft.


Brick conduit


659 lin. ft.


Concrete conduit


9,037 lin. ft.


Number of manholes


349


Number of concrete culverts


7


Number of catch basins


624


Cost of system to January 1, 1920 $232,082.44


Construction 1920


14,201.42


Cost of system to January 1, 1921. $246,283.86


Total length of improved surface drains ... 13.35 miles


ENGINEERING DIVISION


Salaries and Wages


Appropriation


$6,000.00


Less transfers


550.00


$5,450.00


Expended


Salaries as per pay rolls 1


$5,360.25


Liability insurance


33.56


5,393.81


Balance


$56.19


Other Expenses


Appropriation


$800.00


Transfer from salaries and wages.


50.00


$850.00


147


REPORT OF PUBLIC WORKS DEPARTMENT


Expended


Supplies


$389.84


Automobile supplies and repairs.


447.81


Carfares


8.10


$845.75


Balance


$4.25


SYNOPSIS OF WORK DONE


Highway Division


Street lines and grades given for construction of new streets, in- eluding gutters, crossings, guard rails. etc., and record plans made of same.