Curbing has been set in the following streets:
Granite.
South Main Street, west side, Thacher Street southerly 885 feet
Jefferson Street, east side, Second Street to Third Street 279 feet
Perrin Street, west side, Dean Street to Cemetery. 273 feet
1,437 feet
Cement.
Fifth Street, south side, County Street westerly 452 feet
Total
1,889 feet
Cement Sidewalks.
South Main Street, west side, Thacher Street southerly 885 feet wide
Fifth Street, south side, County Street westerly 454 feet wide
Total 1,339 feet or 815.5 sq. yds.
119
ANNUAL REPORT
WATER DEPARTMENT.
For the first time the receipts of the department for the year have exceeded the expenses. These expenses include construction, maintenance, amount paid into sinking fund, interest charges, and serial bonds. However, this is only temporary, as it will be neces- sary in the immediate future to expend a considerable sum of money to increase the ground water supply at the Pumping Station. Our surface water supply is sufficient for some years to come, but we are fast reaching the daily consumption which our ground water supply was designed to meet. It will also be necessary, in the near future, to relay some of our smaller pipes and lay new main line in order that the domestic and fire supply will be adequate to take care of the growth of the city.
PUMPING STATION.
The Pumping Station pumps, boilers, and grounds are in good condition and only minor repairs have been necessary to keep the Station and equipment in a high state of efficiency. About eight acres of reforestration have been done this year. Seven thousand (7,000) four year old White Pine transplants, and one thousand (1,000) four year old Norway Spruce transplants have been set out. This work we hope to continue each year.
Stand Pipe.
The repairs on the stand pipe, which were completed last year, were evidently well executed, as there are no evidences of any leaks up to the present time.
Work Shop.
The first floor of the work shop has been remodelled in order to make room for the two automobiles which were purchased for the Police Department this year. The expense for the work was appor- tioned between the Water and Police Departments.
A new heater has also been installed in the work shop to re- place the old one, and a new automobile purchased for the Meter Department.
RESERVOIR.
There has been no occasion for making any repair at the reser- voir this year.
The first water drawn from the reservoir this year was on August 21, and finally closed November 22. Between these dates the gates
120
ANNUAL REPORT
were opened or closed according as there was or was not water flow- ing from the Seven Mile River onto the filter beds. Total number of days water was drawn from reservoir, 72.
A total of 6,000,000 gallons was also pumped from Orr's Pond onto the filter beds.
MAIN LINE.
It will be noticed from the following table that all main lines laid this year have been 6-inch pipe. The domestic supply which can be obtained from a 2-inch, or even smaller pipe, is the first con- sideration; but fire protection is essential, and that cannot be given with less than a 6-inch pipe. From our work this year it is evident that much of the small pipe, in the central part of the city especially, will very soon have to be replaced by larger pipe.
SERVICES AND METERS.
On account of a lesser amount of building than in former years, the expense of services and meters has been somewhat reduced; but a great deal of labor has been expended in putting into perfect con- dition many services, service gates, waste valves, and meters that were found defective.
HYDRANTS AND GATES.
Special attention, and an unusual amount of it, has been given to hydrants and gates. Those found in questionable condition have been replaced with new; additional ones have been installed; and all have been carefully tested.
In general the Department is in good condition so far as ser- vice and domestic supply is concerned, and in most portions of the city the fire service is adequate. Another trunk line from the sta- tion and a few larger distributing mains would give nearly the entire city excellent fire protection. This should be the next consideration for increasing the efficiency of the system.
PUMPING RECORDS.
Totais Per Month.
Month
Hours Pumping
Coal Consumed
Gallons Pumped
January
289
68,500
25,630,807
February
230
66,200
25,008,919
March
259
70,981
25,731,559
April
236
75,082
24,795,398
May
268
79,728
27,796,366
June
282
80,054
29,613,122
July
306
87,711
31,939,954
August
326
89,269
32,386,124
September
296
82,945
33,274,180
October
301
92,404
34,656,286
November
285
86,848
32,000,071
December
302
91,254
31,704,133
Totals
3,380
970,976
354,536,919
121
ANNUAL REPORT
PUMPING RECORDS. Daily Averages Per Month.
Month
Hours Pumping
Coal Consumed
Gallons Pumped
January
9-20
2,210
826,800
February
7-55
2,283
862,375
March
8-22
2,290
830,050
April
7-52
2,503
826,513
May
8-40
2,572
896,657
June
9-12
2,668
987,104
July
9-54
2,829
1,030,321
August
10-30
2,880
1,044,714
September
9-52
2,765
1,108,845
October
9-44
2,981
1,117,945
November
9-30
2,895
1,066,609
December
9-46
2,944
1,022,714
Totals
9-13
2,652
968,387
MAIN PIPE EXTENSIONS.
Street
Length
Size
Total Cost
Cost Per Foot
Cumberland Avenue
1,346
6"
$1,652.90
$1.23
Curtis Avenue
460
6"
542.14
1.18
East
158
6"
186.74
1.18
Holden
1,133
1,374.86
1.21
Irving
176
6"
243.44
1.38
Sixth
113
6"
119.42
1.06
3,386
$4,119.50
$1.23
Watson Avenue
49
2"
16.40
.33
Totals
3,435
$4,135.90
SERVICES LAID
Size
No.
Length
Cost Main to Box $594.48
Cost Box to House
Total Cost
Cost Per Foot
1"
51
2,191
$644.44
$1,238.92
$.565
11/2
1
41
17.36
17.36
.423
2"
3
150
36.28
72.50
108.78
.725
6"
1
121
137.29
137.29
1.133
Total.
56
2,503
$630.76
$871.59
$1,502.35
122
WATER ANALYSIS-CITY OF ATTLEBORO Made by the COMMONWEALTH OF MASSACHUSETTS-STATE DEPARTMENT OF HEALTH (PARTS IN 100,000)
Date 1916
Turbidity
Appearance Sediment
Color
Residue on Evaporation Total
Free
- Ammonia Albuminoid Chlorine
- Nitrogen as- Nitrates
Nitrites
Hardness
Iron
January 29
None
None
.06
3.80
.0000
.0048
.58
.0180
.0000
1.7
.005
April 5
None
None
.05
4.90
.0000
.0038
.47
.0180
.0000
1.7
.005
June 7
None
None
.08
4.20
0002
.0032
.42
0100
.0000
1.6
.002
August 11
None
None
.02
5.20
.0000
.0038
.48
.0350
.0000
2.0
003
October 30
None
None
.00
5.70
.0002
.0034
.54
0140
.0000
2.1
.010
Average.
.042
4.76
.0001
.0038
.50
0190
.0000
1.82
.005
ANNUAL REPORT
123
ANNUAL REPORT
REPORT OF RAINFALL
YEAR 1916.
Month
Amount
January
1.41 inches
February
4.71
March
1.40
April
3.28
66
May
5.28
June
4.83
66
July
7.63
66
August
2.19
66
September
1.19
October
2.41
66
November
1.69
December
2.26
Total for year.
38.28 inches
SUMMARY OF STATISTICS FOR THE YEAR ENDING DEC. 31, 1916.
In Form Recommended by the New England Water Works Association.
Population by census of 1915
18,480
Date of construction (by Fire District) .
1873
Date taken over by Town ..
1894
Owned by-City of Attleboro.
Source of supply-Two wells near Seven Mile River, Orr's Pond, Hoppin Hill Reservoir.
Mode of supply-Pumped direct overflow to Standpipe.
PUMPING STATISTICS.
1. Builders of pumping machinery-Deane, Barr and Snow.
2. Description of fuel used-a. Kind-soft. b. Brand of coal used-New River, Carbon Forge. c. Average price of coal per gross ton delivered, $5.75. d. Percentage of ash, 9.86. e. Wood, price per cord-None purchased.
3. Coal consumed for the year in pounds. 960,973
4. (Pounds of wood consumed) divided by 3 equals equivalent amount of coal, pounds. 300
5. Total equivalent coal consumed for the year equals (3) plus (4), in pounds 961,273
6. Total pumpage for the year in gallons, no allowance for slippage 354,528,919
7. Average static head against which pumps work, in feet 242
8. Average dynamic head against which pumps work, in feet 258
9. Number of gallons pumped per pound of equivalent coal (5) 369
10. Duty equals gallons pumped (6) x 8.34 (lbs.) x 100 x dynamic head (8) equals. 79,000,000
66
Total fuel consumed (5)
124
ANNUAL REPORT
11. Cost of pumping, figured in Pumping Station expenses, viz. $7,019.38
12. Per million gallons pumped. $19.77
13. Per million gallons raised one foot (dynamic). $0.077
FINANCIAL STATISTICS.
Total receipts per City Auditor's statement ... $72,815.44
Expenditures per City Auditor's statement :
Maintenance and Construction. $27,716.92
Paid Sinking Fund. 10,000.00
Paid interest on bonds 22,165.00
Paid serial bonds. 11,000.00
70,881.92
Excess of receipts over expenditures $1,933.52
STATISTICS OF CONSUMPTION OF WATER.
1. Estimated population, 1915 census 18,480
2. Estimated population on lines of pipe. 18,100
3. Estimated population supplied 18,100
4. Total consumption for the year (gallons) 354,528,919
5. Passed through meters (gallons) 200,154,000
6. Percentage of consumption metered. 56%
7. Average daily consumption in gallons. 971,312
8. Gallons per day to each inhabitant 52.5
9. Gallons per day to each consumer
53.6
10. Gallons per day to each tap
327
11. Cost of supplying water, per million gallons, figured on total maintenance (item CC) $78.19
12. Total cost of supplying water, per million gallons, fig- ured on total maintenance plus interest on bonds, Sinking Fund, and bonds. $199.95
STATISTICS RELATING TO DISTRIBUTION SYSTEM MAINS.
1. Kind of pipe
Cast iron
2. Sizes 11/2" to 24"
3. Extended during year (feet) 3,435
4. Number of hydrants added.
4
5. Number of hydrants now in use. 490
6. Range of pressure on mains (pounds) 85 to 135
SERVICES.
7. Kind of pipe.
wrought iron, cement-lined
8. Sizes 1" to 6"
9. Number of services added during year 43
10. Number now in use.
2,965
11. Average cost of service for the year (per foot) $0.57
12. Number of meters in use. 2,938
13. Percentage of services metered. 100%
125
ANNUAL REPORT
SEWER DEPARTMENT.
The usual care and attention has been given to this excellent system, for so it has proved to be. A little more flushing than usual has been done this year, and this work will continue to increase, as the system is more generally used, in order to keep the solid matter from collecting along the flat grades.
Sewer Connections.
Total connections to Jan. 1, 1916. 844. Buildings served. 1,004 Connections added during 1916. 89. Buildings served. . 97
Total connections Jan. 1, 1917. 933. Buildings served. 1,101
RIFLE RANGE.
This much discussed subject has now been settled. The city has purchased approximately one hundred fifty (150) acres at Deantown, and have constructed four target butts, one each at 200 yards, 300 yards, 500 yards, and 600 yards. Target frames purchased and set, and the range completed with the exception of telephones and range house.
The design and construction of this work has been under the supervision of the Adjutant General's office, and we have also ob- tained other expert advice so that if the State does decide to take over the rifle ranges, there can be no question as to ours being prop- erly constructed and laid out.
STREET LIGHTING.
This year we removed all the arc lights on County Street, and placed five 60 C. P. lights for each arc removed, the result being very satisfactory. We hope to continue this work the coming year in other sections of the city.
The following is a list of the number and kinds of lights in use Jan. 1, 1917:
Kind
Number
Arc
18
Sunset to 1 A. M.
Arc
5
1 A. M. to daylight
250 C. P. Incandescent.
45
Sunset to A. M.
100 C. P. Incandescent.
101
Sunset to 1 A. M.
60 C. P. Incandescent. 840
Sunset to 1 A. M.
32 C. P. Incandescent.
20
All night lights
Under R. R. arches.
In conclusion, I desire to express my appreciation to His Honor, the Mayor, the members of the Municipal Council, and other City Officials for courtesies and assistance rendered me during the past year. To the employes of this Department, and other departments, I also extend my thanks for their co-operation.
Respectfully submitted,
H. J. GOODALE,
Superintendent of Public Works.
126
ANNUAL REPORT
Estimate of Receipts, 1917 Public Works Department
Water Department.
Supply of Water
$62,000.00
Hydrant Rental (490).
14,700.00
Sprinkling and Fountains
1,000.00
Flushing Sewers
100.00
$77,800.00
Highway Department.
Curbing betterments
$1,070.00
Concrete betterments
1,562.00
General
468.00
$3,100.00
Recommendations for 1917
ADMINISTRATION.
Superintendent's Salary
$2,500.00
Engineer's Salary
1,200.00
Assistant Engineer's Salary 936.00
Clerk's Salary
1,000.00
Assistant Clerk's Salary
624.00
Engineering supplies
250.00
Office supplies
400.00
Auto insurance, repairs, tires, etc.
400.00
$7,310.00
WATER DEPARTMENT. Pipes to be Relaid and New Extensions.
Owing to the advance of 50% in the cost of materials, I do not recommend that any pipes be relaid this year, but I feel that those recommended to be relaid in 1916 are very much needed to improve our distribution system.
New Extensions.
I still think that the extensions recommended for 1916 are fast becoming a necessity, but for the reason stated above I am only recommending three extensions this year, which if these dead ends are connected, will reinforce the supply at the Home Bleach and Dye works and the Crown Mill, both of these concerns having built large additions this year.
Robinson Avenue 6" $1,800.00 Connecting dead ends
Brown Street 6" 1,600.00 Connecting dead ends Mendon Road and Leedham Sts ... 6" 1,900.00 Connecting dead ends
Total $5,300.00
127
ANNUAL REPORT
WATER DEPARTMENT MAINTENANCE.
New meters
$2,700.00
Services
2,500.00
Main Extension
6,600.00
Shop and Barn.
700.00
Pumping Station
7,500.00
Maintenance Pay Roll.
5,000.00
Teams and Auto.
1,500.00
Insurance
850.00
Tools and Equipment.
400.00
Maintenance material
400.00
Repair of Filter Beds
6,000.00
Incidentals
350.00
$34,500.00
SEWER DEPARTMENT.
Filter Beds maintenance.
$2,100.00
Repair and care of sewers. 700.00
$2,800.00
HIGHWAY DEPARTMENT.
BRIDGES.
Water Street Bridge.
This bridge is in a dangerous condition, and I would recommend that a new bridge be constructed the full width of this street. The estimated cost is seven thousand ($7,000) dollars.
Maple Street Bridge.
I would recommend that a new bridge, the full width of the street, over Thacher Brook, be constructed at an estimated cost of one thousand three hundred ($1,300) dollars.
Mechanics Street.
The wooden bridge on this street is in a very dangerous condition and something will have to be done this year either by constructing a new bridge at its present location, or straightening the street, as was suggested in the preliminary report for 1916.
Should it be decided to build a new bridge at its present loca- tion, I would recommend the widening of the street from Hodges Street to Third Street.
The present width of the street from Hodges to Third Street is 40 feet, and from Third Street beyond it is 50 feet wide.
Railroad Bridges.
In 1915, the New York, New Haven and Hartford Railroad Bridge Inspector informed me that it would be necessary to lay new the floor timber in all of the overhead bridges during 1916, and when this is done, it will be necessary for the city to lay new flooring.
128
ANNUAL REPORT
He came to me in September and stated that they were ready to begin work. Lumber was immediately ordered for Olive Street and Holden Street bridges, but it has not arrived as yet, although it is expected in any day.
The estimated cost for repairing these bridges is as follows:
Lindsey Street
$400.00
Starkey Avenue 425.00
Olive Street 1,200.00
Thurber Avenue
400.00
Hebronville Foot Bridge
200.00
Mendon Road
400.00
$3,025.00
SPECIAL STREET IMPROVEMENTS. Union and Park Streets.
I am enclosing a schedule of estimates for four different kinds of pavements for the improvement of Union Street, from Mill Street to Park Street; and Park Street, from Union Street to Pine Street. All these pavements are estimated to be laid on a 5-inch concrete base.
In determining the type of pavement to lay, there are several things to consider. Among these are slipperiness, whether noisy or not, easy to clean, sanitary, and life of the pavement.
Of these, the asphalt block and asphalt penetration have about the same characteristics, except that the asphalt penetration is a little less slippery and shorter lived than the asphalt block. The principal features of these pavements are that they are the most slippery, less noisy, easiest to clean, and are sanitary. Brick is less slippery, a little more noisy, not quite so easy to clean, sanitary, and a little longer lived. Granite block affords the best footing for horses, more noisy, hardest to clean, sanitary, and much longer lived.
If we take the probable life of these pavements to be asphalt penetration, five years; asphalt block, ten years; brick, fifteen years, and granite block, thirty years, and divide the cost per square, elimi- nating $1.00 from each, which is practically the cost of the concrete base, the life of which is indefinite, we have the following results:
Kind
Life
Cost per sq. yd.
Cost per sq. yd.
per year
Asphalt Penetration
5 yrs.
$1.00
20c
Asphalt Block
10 yrs.
1.75
171/2c
Brick
15 yrs.
2.25
15c
Granite Block
30 yrs.
2.75
9 1/6c
From the above data it might seem wise at first thought to lay Granite Block; but when you consider that it is very noisy and hard to keep clean and therefore dusty and annoying to the manufacturers, it in my judgment is not the pavement to lay on these particular streets.
The same objections hold true of brick pavement, but to a less extent.
Of the asphalt block and asphalt penetration, there is not much choice as far as the convenience of the abutting owners and manu- facturers are concerned, except in the final cost; but considering the first cost and my belief that the asphalt penetration with proper maintenance will last more than five years, it is my judgment that this pavement should be laid. I therefore recommend that asphalt penetration be the material used to pave Union and Park Streets.
129
ANNUAL REPORT
GENERAL MAINTENANCE AND REPAIR WORK.
General Street Expenses
$45,000.00
Sidewalks and Curbing 3,500.00
Dust Layer and Tar. 10,000.00
Lighting .
19,000.00
Signs, Guide Boards, numbering and clock repairs. 225.00
Insurance, Property and Liability 900.00
$78,625.00
DRAINAGE.
This department is at work following out the instruction of the Municipal Council regarding a complete system of surface drainage, cost, etc., and for that reason I am not recommending any special drainage systems this year, but our needs are no fewer than last year.
STREET LIGHTING.
The length of time which our streets are lighted does not seem to satisfy all of our citizens, and I would recommend that the streets be lighted every night and until 1:30 o'clock in the morning. The expense would be small and possibly would do away with the present criticism.
RIFLE RANGE.
The construction of the Rifle Range is still incomplete as there is needed a range house, target house, telephones, and some additional work in filling in front of the butts caused by the settlement of the fresh fill through the winter; also the brush has sprung up during the year and will need to be cut, and some small expense on the targets.
COMMON.
The repair and care of the Common has heretofore been in the Highway Department, but it seems to me that this should be under the Park Commission. I would therefore recommend that the Park Commission be given the care of the Common and that the High- way Department be instructed to take care of the snow.
UNION STREET WIDENING (PARK STREET TO SOUTH LINE OF MILL STREET). Estimate of Cost Exclusive of Land Damages. Proposed street, 45' wide-Distance between curbs, 31'. Area paved by street railroad, 8.0 ft. wide-2 sidewalks each 7' wide. December, 1916.
Items
Quantity and Unit Cost
Asphalt Penetration
Asphalt Block
Curbing and Sidewalks
Resetting Curbing
1,700 ft. $.40
$680.00
$680.00
Granolithic Sidewalks
1,325 sq. yds.
1.50
1,987.50
1,987.50
Concrete Gutter
1,700 lin. ft.
40
680.00
680.00
Removing trees
300.00
300.00
Moving fences, buildings, etc.
200.00
200.00
Incidentals, add 10%.
.
Drainage
Mill Street to near Park Street and at Park Street and Union Street intersec- tion 12", 15" and 18" pipe. 4 manholes and 19 catch basins.
3,200.00
3,200.00
Pavement
Asphalt Penetration
1,850 sq. yds. $2.00
3,700.00
Asphalt Block
1,850 sq. yds. 2.75
5,087.50
Granite Block (R. R. tracks only )
730 sq. yds. 3.75
2,737.50
2,737.50
Incidentals, add 10%.
643.00
782.00
Railroad Tracks
Moving street car tracks.
1,500.00
1,500.00
Water Mains
Relaying services, etc ...
300.00
300.00
$16,312.75
$17,839.50
130
ANNUAL REPORT
.
384.75
384.75
$4,232.25
$4,232.25
7.080.50
$8,607.00
.
UNION STREET WIDENING (PARK STREET TO SOUTH LINE OF MILL STREET). Estimate of Cost Exclusive of Land Damages. Proposed street, 45' wide-Distance between curbs, 31'. Area paved by street railroad, 8.0 feet wide-2 sidewalks each 7' wide. December, 1916.
Items
Quantity and Unit Cost
Brick Pavement
Granite Block Pavement
Curbing and Sidewalks
Resetting Curbing
1,700 ft.
$.40
$680.00
$680.00
Granolithic Sidewalks .. .
1,325 sq. yds.
1.50
1,987.50
1,987.50
Concrete Gutter .
1,700 lin. ft.
.40
680.00
680.00
Removing trees
300.00
300.00
Moving fences, buildings, etc.
200.00
200.00
Incidentals, add 10%.
384.75
384.75
Drainage
Mill Street to near Park Street and at Park Street and Union Street intersec- tion 12", 15" and 18" pipe. 4 manholes and 19 catch basins.
3,200.00
3,200.00
Pavement
Brick
8,385.00
Granite Block (including R. R. tracks) ... Incidentals, add 10%
838.00
967.00
Railroad Tracks
9,223.00
10,642.00
Moving street car tracks.
1,500.00
1,500.00
Water Mains
300.00
300.00
$18,455.25
$19,874.25
.
.
.
.
.
#
.
.
.
. .. .
131
ANNUAL REPORT
.
2,580 sq. yds. $3.25 2,580 sq. yds. 3.75
9,675.00
Relaying services, etc.
$4,232.25
$4,232.25
.
PARK STREET-WEST LINE OF UNION TO EAST LINE OF PINE STREET. Estimated Cost of Paving and Other Improvements. December, 1916.
Items
Quantity and Unit Cost
Asphalt Penetration
Asphalt Block
Curbing and Sidewalks
Resetting Curbing
700 ft.
$.40
$280.00
$280.00
Granolithic Sidewalks
450 sq. yds*
1.50
675.00
675.00
Concrete Gutter
350 lin. ft.
.40
140.00
140.00
Cobble Gutter-relaid
320 lin. ft.
.40
128.00
128.00
Incidentals, add 10%
122.30
122.30
Drainage
12" Akron Drain and Catch Basin connec- tions
300 ft.
1.00
300.00
300.00
Catch Basins
3
@
45.00
135.00
135.00
Manholes
1
@
35.00
35.00
35.00
Incidentals, add 10% ..
47.00
47.00
Pavements
Asphalt Penetration
700 sq. yds.
2.00
1,400.00
Asphalt Block
700 sq. yds.
2.75
1,925.00
Granite Block (R. R. tracks only) .
520 sq. yds.
3.75
1,950.00
1,950.00
335.00
387.50
3,685.00
4.262.50
$5,547.30
$6,124.80
.
.
ANNUAL REPORT
132
517.00
517.00
Incidentals, add 10% ..
$1,345.30
$1,345.30
PARK STREET-WEST LINE OF UNION TO EAST LINE OF PINE STREET. Estimate of Cost of Paving and Other Improvements. December, 1916.
Items
Quantity and Unit Cost
Brick Pavement
Granite Block Pavement
Curbing and Sidewalks
Resetting Curbing
700 ft.
$.40
$280.00
$280.00
Granolithic Sidewalks
450 sq. yds.
1.50
675.00
675.00
Concrete Gutter
350 lin. ft.
.40
140.00
140.00
Cobble Gutter-relaid
320 lin. ft.
.40
128.00
128.00
Incidentals, add 10%.
122.30
122.30
$1,345.30
$1,345.30
Drainage
12" Akron Drain and Catch Basin connec- tions
300 ft.
1.00
300.00
300.00
Catch Basins
3 @
45.00
135.00
135.00
Manholes
1 @
35.00
35.00
35.00
Incidentals, add 10%.
47.00
47.00
Pavements
Brick
1,220 sq. yds.
3.25
3,965.00
Granite Block (including R. R. tracks) ...
1,220 sq. yds. 3.75
396.50
457.50
4,361.50
5,032.50
$6,223.80
$6,894.80
. .
. .
ANNUAL REPORT
.
517.00
517.00
4,575.00
Incidentals, add 10% .
133
ANNUAL REPORT
OF THE
School
committee D
ATTLEBORO, MASSACHUSETTS For the Year Ending December 31 1916
137
ANNUAL REPORT
SCHOOL COMMITTEE, 1916-1917
Mrs. Florence B. Theobald,
Thomas G. Sadler,
South Attleboro 1917
Telephone Pawt. 336-W
Walter A. Briggs,
1 Cliff St. 1917
Telephone 619-R
17 First St. 1918
Telephone 764-W
13 Maple St. 1918
Dr. Reginald P. Dakin,
32 John St. 1918
Telephone: Residence 713-W
Telephone: Office 279-J
177 Pine St. 1919
Telephone 710-M
17 Mechanics St. 1919
Telephone 468-M
Tyler St. 1919
Telephone 717-W
ORGANIZATION
Benjamin P. King Chairman
Dr. Reginald P. Dakin . Secretary
Benjamin P. King. Representative before Municipal Council
STANDING COMMITTEES Teachers and Course of Study
Mr. King, Mrs. Richardson, Mrs. Theobald, Dr. Dakin, Mr. Thayer.
Text-Books and Supplies
Dr. Dakin, Mrs. Ford, Mrs. Theobald, Mr. Newman, Mr. Briggs.
Incidentals and Repairs
Mr. King, Mr. Newman, Mr. Sadler, Mr. Thayer, Mr. Briggs.
Visiting Schools
Mrs. Richardson, Mrs. Theobald, Mrs. Ford, Dr. Dakin, Mr. Briggs.
Walter J. Newman,
Edwin F. Thayer,
Mrs. Mary C. Ford,
250 County St. Telephone 172-M.
Term Expires January 1917
Benjamin P. King,
Mrs. Emily L. Richardson,
Telephone 354-W
138
ANNUAL REPORT
INDEPENDENT EVENING INDUSTRIAL SCHOOL
Advisory Committee
S. M. Einstein,
E. L. Gowen, W. L. King, H. D. Lincoln, J. H. Harmstone.
Regular Meetings, first and third Mondays of each month at 7:45 o'clock P. M.
Bills may be approved at each meeting of the Committee. All bills to be acted on must be submitted in duplicate, approved by the chairman of the sub-committee contracting the same, and be in the hands of the Clerk of the Committee, Superintendent's office, on the Saturday preceding the meeting.
Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.