Drain material 731.02
Resetting curbs, manhole, etc. 2,422.67
Asphalt 2,450.16
$29,874.26
County Street
Newell Contract
$22 035.25
Resetting manhole, curbs, etc. 1,168 85
Asphalt 3,627.36
$26,831.46
Pike Ave and Peckham St.
307.61
Bishop St ..
43.56
North Main St.
3,117.82
Union St ..
518.99
General Construction
4,988.23
$110,662 02
Cliff St. Construction
5,020.65
North Main St. Curbing
2,837.24
Oak St. Construction.
1,946.08
Thirteenth St. Construction
1,735.78
Resurfacing
Bridge St. 51.42
Brown St.
58.70
Cambridge St.
8.62
Dennis St.
1,146.25
Elizabeth St.
45.04
Fisher Ave.
237.03
Fourth St.
366.22
Handy St. .
549.60
Hebron Ave.
83.89
Highland Ave
2,733 94
James St. .
38.24
Knight Ave.
344.91
Lexington Ave
65.64
Lindsey
829 88
Locust St ..
36.54
Mann & Turner Sts.
351.10
Maple St.
681.96
May St ..
51 20
Mechanic St.
287.51
Mendon Ave
80.00
Newport Ave
301.30
North Av
366.97
Olive St.
274.00
Orange S:
98.24
Parker St.
96.51
Peckham St
36.55
Pike Ave.
413.80
Pleasant St.
172 80
Read St.
1,207.58
Richardson Ave.
55.14
South Ave. & West St.
64.40
Robinson Ave.
793.80
Summer St.
227.55
Thacher St.
35.16
West St ..
465.61
Miscellaneous and general
1,192.65
84
ANNUAL REPORT
Labor
$730.43
Material
.. 462.22
$13,849.75
Bridges
Thurber Ave. Bridge.
$477.20
General Repair-Material and
Labor
130.84
$608 04
Farmers Bridge
1,519.79
Drains
Cleaning Catch Basins
884.36
West St. Drain.
54.50
Mendon Ave. Drain
171.00
Pond St. Drain.
55 60
Lamb St. new catch basin
47.97
Miscellaneous repairs Labor
$27.60
Material
315.50
$1,556.53
Ten Mile River
711.26
South Main St. Drain.
14,893.34
Crosswalks
222.11
Street Cleaning
Gutters
$3,442.90
Outside Roads
4,555.56
$7,998.46
Street Sweeping
Labor
$2,611.32
Street Patching
Brown St. .
$260.76
Cumberland Ave
46.80
Highland Ave.
357.15
Horton St.
97.60
Locust St.
36.55
May St ..
50.80
Mendon Ave.
189.40
Newport Ave.
378.70
Oak Hill Ave
904 67
Reynolds Ave
162.45
Robinson Ave
950.70
South Ave.
330.86
South Main St. & Hebron Ave .. .
1,336.20
Thacher St.
65.02
Thurber Ave
34.55
Turner
33.40
Washington St.
19.43
Webber St.
34.82
West St.
95.87
Miscellaneous
4,187.81
Labor
$2,684.53
Material
1,503.28
$9,573.54
343.10
85
ANNUAL REPORT
Sidewalks, Maintenance and Repair
Dennis St.
$120.80
Emory St.
19.97
Hebronville
630.50
Holman, Parker & School Sts ..
310.00
John
302.75
Lexington Ave.
150.34
Maple St.
100.65
Newport Ave
819.40
North Main St.
67 50
Read St ..
25.60
South Main St.
468.94
Starkey Ave. & Morey St.
142.71
Summer St.
94.73
Twelfth St.
38.06
Union St.
193.62
West St.
291.03
Miscellaneous
1,366 13
Labor
$438.82
Material
927.31
$5,142.73
Care of Common
335.85
Snow and Ice
Last Season
$10,306.81
This Season
330.46
Sand and Hauling
435.96
$11,073.23
Machinery and Tools
Keeping tools in repair
687.69
New Equipment
1,669.19
Tools
356.52
Small Equipment
896 54
Miscellaneous Maintenance
..
$3,665.80
Crushers
Portable
176.78
Stationary
8 64
$185.42
Rollers
Labor-Maintenance
224.66
Miscellaneous Maintenance
1,225 37
Portable Boiler
281.88
Sand Loader
26.04
$1,757.95
Automobiles
Repairs
296.38
Operating Expense
430.32
Insurance, Freight and Incidentals
Insurance
2,062.41
Rent, Maynard St. Land.
69.60
Vacations
393.28
Clean-up Day
65.35
$726.70
55.86
86
ANNUAL REPORT
Cutting brush-Benefit St
15.76
Telephone
49.32
Oil for Lighting.
11.40
Freight and Express
77.55
Rifle Range-taxes
11.89
Miscellaneous
118 38
$2,874.94
$221,489.66
Sidewalks and Curbing
Pine and Park Sts
470.09
Union St.
93.80
Bank St.
1,615.67
Miscellaneous
3.15
$2,182.71
Dust Layer and Tar
Street Sprinkling
1,201.71
Oil and Tar.
19,881.74
Sand for Oiling
1.104 92
$22,188.37
Lighting
Contract
20,034.00
New Lights
104.57
$20,138 57
Signs, Clock and Numbering
Clock
Lighting
$34.30
New Lamps
9.00
Care
52.00
$95.30
Signs
248.70
Deferred Gravel charges
955.95
HIGHWAY DEPARTMENT Comparison of Itemized Expenditures
1918
1919
1920
Construction and Resurfacing.
.$16,001.68
$23,049.79
$156,032.65
Bridges, Construction and Repair.
5,049 01
1,914.62
2,127.83
Drains, Maintenance
1,537.32
1,261.47
17,161.13
Crosswalks
160.86
None
222.11
Street Cleaning
5,130.30
5,480.85
7,998.46
Street Sweeping
2,005.11
2,309.58
2,611.32
Street Patching (Tar and gravel) ...
4,121.02
6,722.07
9,573.54
Sidewalks, Maintenance and repair
2,234.11
2,789.80
5,142.73
Common, Care of.
335.95
323.37
335.85
Snow and Ice.
1,124.31
460.87
11,073.23
Machinery and Tools
3,122.98
2,700.69
5,609.17
Automobiles
713.21
2,023.60
726.70
Insurance, Freight, Water, etc.
*3,658.56
** 4,518.98
2,874 94
Totals
$45,194.42 $53,555.69
$221,489.66
*Dust Layer and Tar account, $1,410.36-1918
** Dust Layer and Tar account, 2,252.37-1919
$344.00
87
ANNUAL REPORT
WATER DEPARTMENT
A small force has been employed in this department this year due to the small amount of main line extension being laid. Extensions have been made on two streets totaling eight hundred seventy-four (874) feet of 6" pipe, twenty-five (25) services have been laid and two (2) hydrants added.
A large amount of work has been done in maintenance leaks re- paired, curb boxes have been raised, examined, and locations checked, main line gates examined and repaired, hydrants examined and re- paired in the spring and fall and a start made in repainting them.
One man has been employed flushing dead ends from spring to fall and in the winter he watches the hydrants which are most in danger of freezing. Alcohol is used in those set in ground water.
PUMPING STATION
The conditions at the Pumping Station have been fairly satisfac- tory this year. Minor repairs have been made on the pumps and boil- ers, the Station painted on the outside and the Engineer's cottage painted and repaired on the inside and the outside painted one coat.
A special fitting on the supply line from the Barr pump which cracked last year and which was repaired by welding gave away again this year. This has been taken out and a new one is being made to replace it.
STAND PIPE
The results obtained in the repair of the standpipe in 1914 have been excellent as no leaks have developed up to the present time.
HOPPIN HILL RESERVOIR
This reservoir is in good condition and continues to be an im- portant part of our water system as during the dry season it is necessary to depend on this reserve supply of water for the wells at the Pumping Station. 96,330,000 gallons of water was pumped from Orr's pond on to the filter beds. The valve at the reservoir was first opened July 31, 1920 and closed Nov. 11, 1920.
There is one needed repair which will have to be made in the near future and that is on the gate on the discharge pipe. When this dam was built the valve on this line was placed on the down stream side of the dam and in some manner the pipe leading through the dam became cracked. It was, therefore, necessary to place a gate on the up-stream side of the pipe and the control stem was laid parallel with the slope of the bank. The continued action of the ice has broken this stem from its fastenings so that there is danger of not being able to operate this gate when necessary. What will have to be done is to build a gate house and have a vertical stem rising from the gate and protected from the ice.
MAIN LINE
Eight hundred and seventy-four (874) feet of main line have been laid this year and two additional hydrants set.
SERVICES
Twenty-five (25) services totaling thirteen hundred and ninety- five (1395) feet have been laid this year.
88
ANNUAL REPORT
PUMPING RECORDS Totals per month
Month
Hours Pumping
Coal Consumed Pounds
Gallons Pumped Venturi Meter
January
402 hr .- 30 min.
137.800
37,615,000
February
364 hr .- 0 min.
139,000
36,582,000
March
406 hr .- 10 min.
120,885
38,634,000
April
368 hr .- 30 min.
101,050
33,492,000
May
377 hr .- 0 min.
100,500
32,357,000
June
353 hr .- 10 min.
90,950
31,399,000
July
393 hr .- 50 min.
97,950
33,482,000
August
385 hr .- 0 min.
93 150
34,771,000
September
362 hr .- 20 min.
88,700
31,903,000
October
370 hr .- 20 min.
94,500
31,831,000
November
355 hr .- 20 min.
96,500
26.960,000
December
382 hr .- 0 min.
97,850
30,202,000
Totals
4,520 hr .- 10 min.
1.258,835
399,228,000
PUMPING RECORDS Daily Averages per Month
Coal Consumed
Gallons Pumped Venturi Meter
January
12 hrs .- 59 min.
4.445
1,213,387
February
12 hrs .- 33 min.
4.793
1,261,448
March
13 hrs .- 6 min.
3,899
1,246,258
April
12 hrs .- 17 min.
3 368
1,116,400
May
hrs .- 10 min.
3,242
1,043,774
June
11 hrs .- 45 min.
3.032
1,046,633
July
12 hrs .- 42 min.
3,160
1,080,064
August
12 hrs -25 min.
3.005
1,121,645
September
12 hrs .- 5 min.
2,957
1,063,433
October
11 hrs .- 57 min.
3,048
1,026,806
November
11 hrs .- 50 min.
3,216
998,518
December
12 hrs .- 19 min.
3,156
974,258
Totals
12 hrs .- 20 min.
3,443
1,099,385
MAIN PIPE EXTENSION
Street
Length
Size
Total Cost
Curtis Ave. .
280'
6"
$474.92
Cost per Foot $1.696
Newport
Ave
594'
6"
1,033.61
1.74
SERVICES LAID
Size
Number
Length in Feet
Cost
Cost
Total Cost
Cost per Foot
1"
14
673.7
$275.78
$248.65
$524.43
$.7784
11/4"
8
551
267.99
166.82
434.81
.789
11%"
3
169.7
69.56
82.15
151.71
.8933
REPORT OF RAINFALL Year 1920
Month
Amount
January
2.63 inches
February
4.89 inches
March
4.31 inches
April
5.13 inches
May
4.31 inches
June
5.72 inches
Month
Hours Pumping
Pounds
Main to St. Line St. Line to House
89
ANNUAL REPORT
July 2 00 inches
August 2.73 inches
September 1.61 inches
October
1.21 inches
November 4.67 inches
December
4.01 inches
Total
43.22 inches
SUMMARY OF STATISTICS FOR THE YEAR ENDING DEC. 31, 1920
In Form Recommended By The New England Water Works Association
Population by census of 1920. 19,700
Date of construction (by Fire District) 1873
Date taken over by Town.
1894
Owned by City of Attleboro.
Source of supply-Two wells near Seven Mile River, Orr's Pond, Hoppin Hill Reservoir.
Mode of supply-Pumped direct overflow to standpipe.
PUMPING STATISTICS
1. Builders of pumping machinery-Deane, Barr and Snow.
2. Description of fuel used-a. Kind-soft. b. Brand of coal used- New River .. c. Average price of coal per net ton delivered-$14.84. d. Percentage of ash-10.42. e. Wood, price per cord-None pur- chased.
3. Coal consumed for the year in pounds 1,258,835
4. (Pounds of wood consumed) divided by
3 equa s equivalent amount of coal, pounds. 300
5. Total equivalent coal consumed for the year equals (3) plus (4), in pounds 1,259,135
6. Total pumpage for the year
in gallons, .Venturi meter 399,228,000
7. Average static head against which
pumps work, in feet 246
8. Average dynamic head against which pumps work, in feet 260
9. Number of gallons pumped per pound of equivalent coal (5) 318
10. Duty
= gallons pumped (6) x 8.34 (lbs.) x 100 x dynamic head (8) =
68,800,000
Total fuel consumed (5)
11. Cost of pumping, figured in Pumping Station ex- penses, viz. $19,991 38
12. Per million gallons pumped. $50.75
13. Per million gallons raised one foot (dynamic). $0.195
FINANCIAL STATISTICS
Total receipts per City Auditors' statement.
$82,526.69
Expenditures per City Auditor's statement,
Maintenance $41,001.97
Paid Sinking Fund . 10,000.00
Paid interest on bonds. 20,335.00
Paid serial bonds. 7,000.00
$78,336.97
Excess of receipts over expenditures.
$4,189.72
90
ANNUAL REPORT
STATISTICS OF CONSUMPTION OF WATER
1. Population, 1920 census. 19,700
2. Estimated population on lines of pipe. 19,200
3. Estimated population supplied. 19,200
4. Total consumption for the year (gallons) 399,228,000
5. Passed through meters (gallons). 224,593,162
6. Percentage of consumption metered. 56%
7. Average daily consumption in gallons 1,099,385
S. Gallons per day to each inhabitant. 55.8
9. Gallons per day to each consumer. 56.
10. Gallons per day to each tap. 355
11. Cost of supplying water, per million gallons, figured on total maintenance (item CC) $102.70
12. Total cost of supplying water, per million gallons, figured on total maintenance plus interest on bonds, Sinking Fund, and bonds. $196.47
STATISTICS RELATING TO DISTRIBUTION SYSTEM
1. Kind of pipe. Wrought and cast iron
2. Sizes 11/2 in. to 24 in.
3. Number of hydrants now in use .. 496
4. Range of pressure on mains (pounds) ... 85 to 135
SERVICES
5. Kind of pipe Cost iron, Wrought iron, cement-lined
6. Sizes 1 in. to 6 in.
7. Number of services added during year ... 25
8. Number now in use. 3097
9. Average cost of service for the year (per foot)
$0.702
10. Numbers of meters in use. 2989
11. Percentage of services metered. 100%
WATER ANALYSIS-CITY OF ATTLEBORO MADE BY THE COMMONWEALTH OF MASSACHUSETTS-STATE DEPARTMENT OF HEALTH (PARTS IN 100,000)
Date
Appearance
Ammonia
Nitrogen as
1920
Turbidity
Sediment
Color
Residue on Evaporation Total
Free
Albuminoid Chlorine Nitrates
Nitrites
Hard- ness
Iron
Jan.
9
V. slight
V. slight
.15
*6.30
.0012
.0100
.74
2 6
.050 7 Mile River
Jan.
9
None
None
.01
4.30
.0006
.0052
.62
.0100
.0000
2.6
.012 Tap
Mar.
17
V. slight
V. slight
.30
4.10
.0094
.0142
.30
1.8
.050 Storage reservoir
Mar. 17
Slight
Slight
.30
*4.80
.0066
0148
.30
1.3
.035 7 Mile River
Mar. 17
None
None
.05
3.90
.0002
.0044
.44
.0060
.0000
2.3
.015 Tap
May
5
Slight
Slight
.16
4.25
0010
.0196
.22
1.0
.035 Storage reservoir
May
5
V. slight
V. slight
.22
*4.80
.0006
.0146
.40
1.7
.029 7 Mile River
May
5
None
None
.00
5.80
.0000
.0052
.42
0050
.0000
1.8
.010 Tap
July
6
V. slight
V. slight
.10
3.65
.0026
.0214
.24
0.8
.025 Storage
reservoir
July
6
V. slight
V. slight
.35
5.30
.0012
.0238
.49
.030 7 Mile River
July
6
None
None
00
5.10
.0000
.0042
.46
.0120
.0001
2.0
.010 Tap
Sept.
7
Slight
Slight
11
3.50
0060
.0184
23
1.4
.050 Storage reservoir
Sept.
7
V. slight
V. slight
.15
*4.40
.0034
.0158
.38
2.0
.020 7 Mile River
Sept. 7
None
None
.00
4.10
.0012
.0064
.44
.0160
.0001
1.8
.005 Tap
Average
17
4 59
.0028
.0127
.41
.0098
.0000
1.8
.026
ANNUAL REPORT
* Unfiltered.
91
92
ANNUAL REPORT
SEWER DEPARTMENT
The same care has been taken of the sewer system this year as in the past.
The dead ends have been flushed and the system is in general good condition. The Filter beds were cleaned in the spring and fall and kept clean of weeds during the summer. One caretaker is em- ployed all the year and one additional man eight months.
The sludge is hauled away by the farmers to be used as fer- tilizer.
This year we have used twelve (12) of the beds for six months, four each day, allowing these to rest while the other twelve are in use for the rest of the year. The results have been very good and have reduced the cleaning cost.
During March and April the flow in the sewer was so large that sewer records could not be kept. The average daily flow for the other months was 587,000 gallons. The largest average daily flow being in May, 880,000 gallons, and the lowest in October, 404,000 gal- lons. Based on the average flow per day each acre takes care of 82,500 gallons of sewage daily.
We have continued the work started in 1918 in cleaning the un- dergrowth and hard woods from among the white pines, and as a re- sult are developing some very fine groves of trees. This work adds no expense to the department as it is done by the caretaker during his spare time.
SEWER CONNECTIONS
Total connections Jan. 1, 1920. 1,082 Buildings served 1,269
Connections added during 1920 70 Buildings served 71
Total connections Jan. 1, 1921. 1,152 Total 1,340
STREET LIGHTING
In previous years we have improved our lighting system by substi- tuting five incandescent 60 c.p. lights for one arc light, but this we were unable to do this year due to the inability of the electric light company to obtain these fixtures. This change adds no expense to the city and gives much better service. There are still some arc lights that can be replaced with incandescent lights to a good advantage and this we hope to do the coming year.
The following is a list of the number and kinds of lights in use Jan. 1, 1921:
Forty-five (45) new lights were voted this year but only thirty (30) were installed due to lack of fixtures.
Kind Arc
Number
Cost
13 $70 each Sunset to 1:30 A. M.
Arc
5 $36 each
1:30 A. M. to daylight
250 C. P. Incandescent
46 $30 each
Sunset to 1:30 A. M.
100 C. P. Incandescent 100 $23 each Sunset to 1:30 A. M.
60 C. P. Incandescent
959 $16 each Sunset to 1:30 A. M.
32 C. P. Incandescent 20
$20 each
All night lights under railroad arches.
A. B. C. STREET RAILWAY
From the beginning of the year until Oct. 1, 1920 the city con- tinued the operation of a two-man car. On the latter date, the city having purchased an Osgood-Bradley One-Man car, this new car was put in to use under a new agreement with the Interstate Consolidated Street Railway. This car has given very good satisfaction up to the present time as only minor repairs have been necessary.
Only the necessary repairs on the track and overhead have been made this year.
93
ANNUAL REPORT
A. B. C. STREET RAILWAY
Profit and Loss Statement for Period of Operation Sept. 1, 1918 to Oct. 1, 1920
Operating Receipts
Fares . $28,038.14
School Tickets 1,364.65
Total Operating Receipts $29,402.79
Add Other Income
F. L. Torrey, moving building. . .
3.69
Total Income for period
$29,406.48
Deduct Operating Expenses
Interstate Operating Expenses ... $27,510.03
Maintenance Labor
4,437.01
Maintenance Material
688.22
Total Operating Expenses
$32,635.26
Operating Loss for Period
$3,228.78
Deduct
a. Interest on bonds
Oct. 1, 1918 to Oct. 1, 1919 ... $1,012.50
Oct. 1, 1919 to Oct. 1, 1920. ... 911 25
$1,923.75
b. Reserve for Taxes
2% of 1918-1919 Revenue. 366.70
c. Reserve Fund for Accidents 2% of Revenue
588.06
$2,878.51
Total Deficit for Period.
$6,107.29
Proportion of Maintenance Appropria-
tions of $500.00 and $1,000.00 applicable to above period.
1,250.00
Net Deficit for Period
$4,857.29
A. B. C. STREET RAILWAY
Profit and Loss Statement for Period of Operation, October 1, 1920 to December 31, 1920
Operating Receipts
Fares
$3,691.03
School Tickets
420.00
Total Operating Receipts
$4,111.03
Deduct Operating Expenses
Interstate Operating Expenses ... $3,353.47
Maintenance Labor 446.18
Maintenance Material
271.25
Total Operating Expenses
$4,070.90
Operating Gain for period. $40.13
Deduct
a. Interest accrued on Bonds Oct. 1, 1920 to Dec. 31, 1920. $202.50
b. Reserve Fund for Accidents
94
ANNUAL REPORT
2% cf Revenue 82.22
$284 72
Total Deficit for Period.
$244.50
Proportion of Maintenance Appropria- tion of $1.000 applicable to above three months 250.00
Net Gain for Period. $5.41
A. B. C. STREET RAILWAY
Profit and Loss Statement for the Total Period of Operation, Sept. 1 1918 to Dec. 31, 1920
Operating Receipts
Fares $31,729.17
School Tickets 1,784.65
Total Operating Receipts
$33,513.82
Deduct-per ordinance passed at meeting of City Council Oct. 16, 1919.
a, Interest on Bonds
Oct. 1, 1918 to Oct. 1, 1919 ... $1,012.50 Oct. 1, 1919 to Oct. 1, 1920 ... 911.25
Accrued Oct. 1. 1920 to Dec. 31, 1920. 202.50
$2,126.25
b. Reserve for Taxes
2% of 1918-1919 Revenue. 366.70
c. Sinking Fund for Accidents 2% of Revenue 670.28
3 163.23
$30,350.59
Add Other Income F. L. Torrey, moving building ... Appropriation by Council.
3 60
1,500.00
$31,854.23
Deduct Operating Expenses
Interstate Operating Expenses ... $30,863.50
Maintenance Labor 4,883.19
Maintenance Material 959.47
$36,706.16
Loss for Period $4,851.88
A. B. C. STREET RAILWAY INVESTMENT ACCOUNT
To Purchase of Railway.
$18,000.00 Cash from Sale of Bonds ..
.$29,800.00
To Equipment charges .
7,081.65
Cash from Surplus Revenue
2,507.52
To Purchase of one-man car.
7,260.00
Cash from Revenue Reserve
750.00
To Purchase of parts for one-man car 345.47
Balance to 1921 ..
370.40
$33,057.52
$33,057.52
MAINTENANCE
ACCOUNT
To Interest paid on bonds 1919 1920
$1,923 75
Received from Interstate, 1919, 1920 $3,016.20
To Interest accrued on Bonds.
202.50
Received from School Tickets 1,784.65
To Reserve for Taxes ..
366.70
Received from F. L. Torrey. 3.69
To Reserve for Sinking Fund
670.28
Received from Appropriations .. 1,500.00
To Labor paid 1918, 1919, 1920
4,883.19
Received from Reserve for Taxes. 135.51
Received from Reserve for Sinking Fund. 238.50
Balance to 1921 .. 4,851.88
$11,530.43
$11 530 43
SURVEY
ACCOUNT
To Expenses making survey-1919
$1,606.49
Received from appropriation.
$2,000.00
To Expenses making survey-1920. 574 72
By amount carried to 1921.
181.12
$2,181.12
$2,181.12
95
ANNUAL REPORT
To Miscellaneous maintenance charges, 1918, 1919, 1920. 1,333.48
To Interstate charges paid in 1920 2,150 53
RESERVE FOR TAXES
To Maintenance account.
$135.51 By Maintenance account. $366.70
To Balance unexpended to 1921.
231.19
$366.70
$366.70
SINKING FUND FOR ACCIDENTS
2% of Receipts
To Maintenance Account
$238.50
By Maintenance Account.
$670.18
To Balance unexpended to 1921.
431.68
$670.18
$670.18
BOND ACCOUNT
Oct. 1, 1919 to Cash
$2,250.00
Oct. 1, 1918 by Cash.
.$22,500.00
Oct. 1, 1920 to Cash.
2,250.00
Oct. 1, 1920 by Cash.
7,300.00
December 31, 1920 Balance to 1921.
25,300.00
$29,800.00
$29,800.00
SUMMARY OF ACCOUNTS
Receipts
Payments
Investment account
$33,057 52
$32,687.12
$370.40 Balance unexpended
Maintenance account
6 678 55
11,530.43
4,851.88 Balance over expended
Survey account .
2,000.00
2,181.12
181.12 Balance over expended
Reserve for Taxes account.
366.70
135.51
231.19 Balance unexpended
Reserve for Sinking Fund Acct
670.18
238.50
431.68 Ba ance unexpended
Bond Account
29,800.00
4,500 00
25,300 00 Balance unpaid
96
ANNUAL REPORT
COMPARATIVE A. B. C. STREET RAILWAY SCHEDULE Number of Passengers
Month
Number of Fares 1919
Number of Fares 1920
School Tickets 1919 1,958
School Tickets 1920
Total 1919 17,273
Total 1920
January
15,315
20,691
2,161
22,852
February
13,951
5,773
2,107
348
16,058
6,121
March
15,446
17,555
2,396
1,703
17,842
19,258
April
15,118
19,213
1,990
1,609
17.108
20,822
May
15,869
19,194
2,357
1,713
18,226
20,907
June
15,537
17,850
1,497
1,250
17,034
19,100
July
15,977
17,981
15,977
17,981
August
16,568
17,974
16,568
17,974
September
16,329
17,880
2 009
1,927
18,338
19,807
October
17,133
17.660
2 276
2,690
19,409
20,350
November
17,454
16,727
1,940
3,107
19,394
19,834
December
19,821
18,342
1,878
2,657
21,699
20,999
Totals
194,518
206 840
20,408
19,165
214,926
226,005
.
ANNUAL REPORT
-
-
97
98
ANNUAL REPORT
EXPENDITURES 1920-PUBLIC WORKS DEPARTMENT
Charges to Dec. 31, 1920.
General Administration
Superintendent's Salary
$3,500.00
Engineer's Salary
2,322.19
Asst. Engineer & Rodman
2,816.85
Clerical Labor
2,340 81
Engineering Supplies
509.70
Office Supplies
253.65
Autos, Insurance, Repairs, etc.
1,015.43
Rent, Light and Phone.
841.04
$13 599.67
Highway Department
Construction 1920-Tax Levy or Bond Issue. .
110,662.02
North Main St. Curbing
2,837.24
Oak St. Construction.
1,946.08
Thirteenth St. Construction.
1,735.78
Cliff St. Construction.
5,020.65
Unexpended Balance of 1919 Appropriation .. 19,981.13
Deferred Barn & Stone & Gravel charges
955 95
Resurfacing
13,850 45
Bridges
608.04
Drains
1,556.53
Ten Mile River
711.26
Crosswalks
222.11
Street Sweeping-3 Patrolmen.
2,611.32
Street Cleaning
7,998.46
Street Patching
9,572.84
Sidewalks, Repair
and Maintenance.
5,142.73
Care of Common
335.85
Snow and Ice.
11,073.23
Machinery and Tools.
3,665.80
Crushers
185.42
Rollers, Coal and Maintenance.
1,757.95
Automobiles, Maintenance
726.70
Insurance
2,062.41
Rent, Maynard St. Land.
69.60
Vacations
393 28
Express, Freight, etc.
349.65
$83,830.71
Farmers Bridge
$1,519 79
South Main St. Drain.
14,893.34
Sidewalks and Curbing.
2,182.71
Dust Layer and Tar
22,188 37
Lighting
Contract
$20,034.00
New Lights
104.57
Signs, Clock, Numbers and Clock Repair
344.00
A. B. C. St. Ry. Maintenance
Receipts-Interstate fares and school tickets
to date
17,748.78
11.89
$20,138.57
Rifle Range
99
ANNUAL REPORT
Sewer Maintenance
Filter Beds
$2,726.02
Repairs and care of sewers
488.60
$3,214.62
Shaw St. Sewer
589.10
Water Maintenance
New Meters
Services
1,554.16
Main Line
1.585.49
Shop and Barn
327.71
Pumping Station
Payroll-Engineers
$7,138.40
Coal
9,982 84
Oil
223.61
Snow Pump, Valves and packing
23.06
Barr Pump, Valves and repair
440.18
Light and phone.
176.51
Repair of Boilers.
125.95
Cleaning Filter Beds.
522.53
Care of Grounds and Beds.
444.99
Incidentals
466.64
Painting Buildings
446.67
$19,991.38
Maintenance Pay Roll.
12,567.04
Teams and Autos
1,988.85
Insurance
853.08
Maintenance Materials
1,502.68
Incidentals
631.58
$343,465.29
In conclusion, I desire to express my appreciation to His Honor, the Mayor, the members of the Municipal Council, and other City Officials, for courtesies and assistance extended to me during the past year.
To the foremen of the various departments, the engineers at the pumping station, and all the other employees who have given me their loyal support during the past year I wish to express my deep appre- ciation.
Respectfully submitted,
H. J. GOODALE,
Superintendent Public Works.
ANNUAL REPORT
OF THE
School Committee
ATTLEBORO, MASSACHUSETTS
For the Year Ending December 31
1920
103
ANNUAL REPORT
SCHOOL COMMITTEE, 1920-1921
Term Expires January 1921
Dr. Reginald P. Dakin
32 John St. Telephone : Residence 713-W.
Telephone: Office 279-J
28 Peck St. 1921
439 No. Main St. 1921
Telephone 258-X
Edwin F. Thayer
Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.