Reports of town officers of the town of Attleborough 1925, Part 12

Author: Attleboro (Mass.)
Publication date: 1925
Publisher: The City
Number of Pages: 288


USA > Massachusetts > Bristol County > Attleboro > Reports of town officers of the town of Attleborough 1925 > Part 12


Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).


Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 | Part 18 | Part 19 | Part 20


139


ANNUAL REPORT


time that the most pressing need for changing the plant for the city will be determined in my opinion by the need for action on these beds.


The grounds were not maintained at all in an expensive manner. Our lighting bill of $122.82, in conjunction with our telephone bill of $72.25 covering the Station equipment is not exorbitant for the service rendered. Under incidentals, the towel supplies, lamps and shades, screen door fixtures, repairing smoke flue, and such like is included. An item for oil may also be noted under Pumping Station expenses.


I believe, in summarizing the activities on our highways, it is well to bear in mind the potential points, as listed below, owing to the defi- nite and positive increase of their use both commercially and for pleas- ure :


First : To continually extend and improve our highway drainage conditions is essentially an investment of the soundest kind.


Second: To maintain the policy of efficiently operating and ade- quately caring for replacement of our machinery and equipment in order to combat our highway problems is a direct necessity in order that our present successful operation may continue.


Third : Concerted effort toward establishing aid from sources other than real estate in the financing of our highway improvements and ex- tensions should be attempted.


The A. B. C. Street Railway apparently will have its future taken care of when intrastate and interstate bus lines have been adequately protected so that responsible capital will seek them as an investment.


Too much stress cannot be laid upon the potential demand for sewer extension with the proper increase in filtration area to handle the limits of the extensions as designed.


Of necessity the primary importance of constantly improving the cash register of the Water Division, meter control, cannot be too strongly stressed. I feel that immediate steps should be taken to con- trol not only the present domestic and commercial outlets, but a record of ever- potential flow should be maintained and the regulations under which this division operates should be amended to aid in the recording mentioned.


One hundred fifty ($150.00) dollars was allowed the Superintendent to make a trip in September with the New England Water Works As- sociation, and as a matter of record to the gentlemen of the Council who accorded this privilege, and to His Honor, the Mayor, who recom- mended the trip, I wish to state that in our daily work benefits too numerous to detail in this report are apparent. It is conceded that the Water Works men of New England are leaders in their work; there- fore it seems only reasonable to believe that close personal contact with such men was the means of developing through discussion and comparison a fund of interesting information which, in its practical ap- plication, has become valuable to the city.


As the percentage of our people using motor vehicles rapidly in- creases, so I feel does their knowledge of the problems which confront this department. The personal contact allowed most of our folks by the use of motors with public work, including highways, drains, sewers, and water works, is coming to be, in my opinion, valuable when future improvements come up for consideration.


The year has been an extraordinarily busy one and by comparison extremely successful. This success has been due entirely to the un- stinted efforts of His Honor, the Mayor; the Municipal Council; and the employees who have so loyally stood up under the strain.


Respectfully submitted, J. O. TABER, JR., Supt. of Public Works.


140


ANNUAL REPORT


EXPENDITURES 1925-PUBLIC WORKS DEPARTMENT


Charges to December 31, 1925.


General Administration


Superintendent's salary


$4,000.00


Engineer's salary, Asst. Eng., Rodman


5,967.82


Clerical labor


2,460.54


Office supplies


176.63


Engineering supplies


260.14


Insurance, repairs, etc.


258.60


Rent, light and telephone


978.02


City survey


1,192.44


Highway Department


Resurfacing


$13,705.04


Bridges


2,891.65


Drains


1,529.07


Ten Mile river


216.00


Traffic painting


102.77


Street Sweeping


1,727.17


Street Cleaning


4,517.64


Street patching


6,657.65


Sidewalks, repair and maintenance


3,660.18


Snow and ice


2,719.87


Machinery and tools


1,856.54


Crushers


844 65


Rollers, coal and maintenance


1,000.00


Maintenance of autos


1,333.49


Insurance


554.42


Rent, Maynard Street Land


69.60


Vacations


533.72


Express, freight, etc.


56.48


$43,975.94


Pearson balance for granolithic by vote of Jan. 19, 1926


(This amount is to cover withholding


clause of 1925 contract made up by transfer as noted below :)


Crosswalks


$51.31


Thacher Brook and Ten Mile river


184.00


Drains


470 93


Bridges


108.35


$814.59


1925 Highway Improvement - Bond


Issue.


South Main Street, No. 1


$23,851.14


South Main Street, No. 2


11,175.78


Dunham Street


14,864.55


Morey Street


10,437.23


Park Street widening


3,002.04


$63,330.74


Sidewalks and curbing


10,538 75


Dust layer and tar


12,515.71


Incidentals


21.34


Construction of Mendon Road


250.00


1924 sewers and drains


19,798.68


Bank and Water Street Bridges


2.34


Cambridge Street drain


139.82


$15,294.19


141


ANNUAL REPORT


Emory Street drain


99.27


Upland Road sewer


1,798.53


Barrows Street


5.96


Lighting : Contract


33,798.37


New lights


251.89


34,050.26


Signs, clock, etc.


351.91


Rifle range


12.09


Sewer Department


Filter beds


$2,675.71


Repair and care of sewers


405.50


$3,081.21


Water Department


New meters


$2,346.55


Services


6,040.15


Main line


13,240.42


Shop and barn


883.08


Maintenance payroll


9,270.92


Teams and autos


2,150 00


Insurance


1,053.54


Maintenance material


1,725.50


Incidentals


293.57


Buildings, repair and paint


567.59


$37,571.32


Pumping Station


Coal


$4,327.19


Payroll, Engineers


7,541.90


Oil


178.04


Snow pump


94.59


Barr Pump


Light and telephone


197.07


Repair of boilers


263.32


Cleaning filter beds


350 29


Care of grounds and beds


37.99


Incidentals


234.04


$13,224.43


A. B. C. St. Ry. maintenance


1,882.31


Expenses in re. N. E. Water Work's Assn.


150.00


$258.909.39


Resurfacing


Bacon


$80.59


Bishop


230.63


Brown


376.41


Clifton


236.54


County


114.59


Dunham


239.06


Emory


54.57


Highland Avenue


38.06


James


14.12


Jefferson


23.35


Lindsey


232.57


May


77.88


142


ANNUAL REPORT


Newport Avenue


384.77


North Main


20.00


Olive


119.10


Payson


41.04


Phillip


311.26


Pike Avenue


433.19


Pond


7.56


Railroad Avenue


627.47


Read


387.31


Richardson Avenue,


359.42


Robinson Avenue


489.79


Short


85.84


Slater and Smith


462.21


South Main


167.53


Speedway


223.71


Steere


47.32


Thacher


83.06


Union Road


44.47


Union and East


51.45


Wall


116.67


Water


34.50


Wilmarth


146.22


Hodges, labor and material


2,501.17


Mendon Road, excavation contract. labor and material


2,084.96


West, labor and material


1,076.77


Miscellaneous


1,011.57


$13,036.73


Emergency : Miscellaneous, washouts,


caused by heavy rains & frost heaves


Labor


$581.23


Material


87.08


668.31


$13.705.04


Bridges, Culverts and Fences


Deantown-Repairing bridge


Labor


$17.45


Thacher Street River Bridge-Slopes


Labor


13.76


Thacher Street Bridge


Labor


$73.66


Material


127.33


200.99


Holden Street River Bridge


Labor


$150.00


Material


32.56


182.56


Olive Street Bridge


Labor


$193.25


Material


1,321.58


Pearl Street Bridge


Labor


$96.46


Material


92.04


$1,514.83


188.50


143


ANNUAL REPORT


Dexter Street Bridge Labor


29.59


Fences-General maintenance


Labor


$176.02


Material


172.53


Labor-Culverts


Removing stump on Newport Ave-


nue, adjacent to double barrel


culvert


$12.85


Union Road culvert


8.86


Brown Street culvert


21.48


Bridges-General maintenance


Labor


$106.39


Material


245.84


$352.23


$2,891.65


DRAIN MAINTENANCE


Park Street and Railroad Avenue


Labor


$48.30


Material


7.92


South Main Street-Dodgeville


Labor


55.85


Material


61.80


117.65


Pearl Street (near bridge)


Labor


62.64


Material


64.81


127.45


Olive Street (Bridge Grating)


Labor


4.95


Material


23.67


Garden Street


Labor


15.85


South Avenue


Labor


24.98


Material


43.31


68.29


Drain and basin repair-labor Miscellaneous material


15.55


Cleaning Catch Basins, etc.


Labor


$632.46


Material


27.81


$660.27


Ten Mile River


$216.00


$216.00


CROSSWALKS


Traffic Painting


Labor


$69.80


Material


32.97


$102.77


$56.22


28.62


439.17


$1.529.07


348.55


144


ANNUAL REPORT


STREET CLEANING


Gutters and Scraping


Labor


Material


$2,313.43 1,628.91


$3,942.34


Outside Roads-Labor


$575.30


$4,517.64


STREET SWEEPING


Labor


$1,727.17


STREET PATCHING (Bituminous and Gravel)


Material and Labor Account,


165 T. pea stone @ $2.50


155 (plus or minus) T. No. 2 stone @ $2.00


$726.37


11,114 Gals K. P. @ $ 141


1,046 Gals. K. P. @ .195


300 Gals. Binder "B" @ $.143


250 Gals. Binder "C" @ $.125 51 Gals. Cold Repair Cement @ $.21


(Credit for 18 barrels returned @ $1.00 $18.00) 1,837.90


Truck and horse operating charges 445.16


Miscellaneous-sand, gravel, and small items 79.18


$3,088.61


Labor


Mixing, placing, handling material, etc. $3,569.04


$6,657.65


(260 tons of pea stone, 140 tons of No. 2 stone) Used in this work and not written off-corresponding to profit from stone charge if crusher charges are not taken note of.


STREET PATCHING (Bituminous and Gravel)


List of streets worked on:


Adamsdale Road


Jackson


Pond


Alder


James


Prospect


Bacon


Lamb


Read


Bank


Leedham


Reynolds Ave.


Benefit


Leroy


Richardson Ave.


Bishop


Lexington Ave.


Robinson Ave.


Brook


Linden


Sanford


Brown


Lindsey


School


Carpenter


Locust


Second


Claflin


Lord


Smith


Cliff


Manchester


South Ave.


Clifton


Mann


South Main


Colvin


Maple


Speedway


Commonwealth Ave.


Mechanic


Starkey Ave.


County


Mendon Road


St. Jean Plat


Deantown Road


Newport Ave.


Sturdy Summer


Dennis


North Ave.


Dunham


North Main


Thacher


East


Oak Hill Ave.


Thurber Ave.


Eldridge


Olive


Tiffany


Emory


Orange


Turner


145


ANNUAL REPORT


Falmouth


Park


Union


Fourth


Park Ave.


Union Road


Garden


Parker


Wall


Gardner


Pearl


Water


George


Perrin


Webber Ave.


Highland Ave.


Phillips


West


Holden


Pike Ave.


West Carpenter


Hope


Pine


Howard Ave.


Pleasant


SIDEWALK MAINTENANCE


Material and Labor


Brook Street sidewalk cover-Emory St. northerly to Brook bend.


Material


$591.43


Labor


526.58


$1,118.01


Repairing cement walks, Olof Pearson


185.20


Sand and gravel


3.95


Cement


16.00


Miscellaneous material


739.90


Labor


1,597.12


$3,660.18


List of Streets worked on :


Angell


Hodges


Pine


Bacon


Holman


Pleasant


Bank


John


Railroad Avenue


Bicknell


Lafayette


Robert


Brook


Lamb


Sanford


County


Leedham


South Main


Crandall Court


Linden


Thacher


Dunham


Maple


Union


Elizabeth


North Avenue


Wall


Emory


North Main


Washington


Falmouth


Park


Water


Forest


Payson


West


Fourth


Pearl


George


Peck


Automobiles


Operating expenses-General mainte-


$1,333.49


Dust Layer and Tar


Oil and Tar


Labor


$2,770.52


Material


8,290.57


$11,061.09


Sand for Oiling


Labor


$579.58


Material


169.13


748.71


Miscellaneous


705.91


$12,515.71


nance


146


ANNUAL REPORT


Insurance, Freight and Incidentals


Vacations


$533.72


Rent, Maynard Street Land


69.60


Insurance


554.42


Telephone


56.48


$1,214.22


Highway Incidentals


Recording layouts, etc.


$21.34


Lighting


Contract


$33,798.37


New lights and setting trolley poles ..


251.89


$34,050.26


Signs


New signs, erection, etc.


$244.32


Clock


Care


$53.25


Lighting


39.40


New lamps


13.32


$105.97


Numbering


Numbers


1.62


$351.91


Rifle Range


Taxes


$12.09


Snow and Ice


Jan. 1 to April-Snow removal and


sanding (labor and material)


2,417.54


December. Snow removal and sanding Repairs, etc.


131.94


$2,719.87


Machinery and Tools


Keeping tools in repair-Labor


$305.45


Keeping tools in repair-Material


240.59


New equipment


1,253.40


Small tools and equipment


57.10


$1,856.54


Crushers


Repairs, maintenance, material, etc .....


$667.56


Labor, dismantling, repairing, etc ...


177.09


$844.65


Rollers


Labor - maintenance


$208.08


Miscellaneous maintenance material, retubing, etc.


791.92


1,000.00


South Main Street No. 1 Improvement


Land damages paid Morris Rudnick .


$21,500.00


Recording plans, etc. (including photo prints)


31.22


Clearing Murray Lot-Labor


99.38


Changing curbing, paving, and water locations, C. B. & Con.


$383.21


Labor


Material


113.38


496.59


170.39


147


ANNUAL REPORT


Fire Alarm manhole work (A. S. & E. Co.)


44.54


2861/2 sq. yds. granolithic sidewalk at $2.40 (O. Pearson)


687.60


Removing large trees and stumps


177.80


Roadway


Stone, binder and sprinkling


$282.62


Labor


210.89


493.51


General (Truck and barn charges)


Labor


$14.77


Material


297.80


312.57


Miscellaneous material


7.93


$23,851.14


South Main Street No. 2 Improvement


Road


Labor


$2,902.73 7,680.50


$10,583.23


Fence


Labor


$127.23


Material


203.26


330.49


Miscellaneous


Repairing shed-Labor


$16.90


Material


245.16


262.06


$11,175.78


Morey St. Improvement


Drainage


Labor


$2,160.58


Material


2,274.34


$4,434.92


Sidewalks and Curbing


Labor


$702.86


Material


1,151.10


Granolithic-O. Peason, Estimate 5 ....


62.60


Surfacing


Labor


$1.166.52


Material


2,630.63


Miscellaneous


Labor


$23.09


Plant charge


229.87


Material


35.64


$288.60


$10,437.23


1,853.96


3,797.15


Material


148


ANNUAL REPORT


Dunham Street Improvement


Moving buildings, etc.


$426.85


Fence


280.22


Drain


Labor


$609.24


Material


606.58


1,215.82


Sidewalks and Curbing


Labor


$424.70


Material


194.16


618.86


Granolithic sidewalk-Olof Pearson


784.91


Sewer Change


Labor


$35.10


Incidentals


4.30


39.40


Water Changes


Labor


91.15


Surfacing


Labor


$650.05


Material


1,322.13


1,972.18


Plant Charges


Labor


$10.53


Material


396.50


Miscellaneous-Material ......


28.13


Land damages paid to Max Wunsch,


9,000.00


$14,864.55


Park Street Widening


Land damages-paid Myer Dana $3,000.00


$3,002.04


Sidewalks and Curbing


Material


2403.83 feet straight curbing $3,059.43


190.44 feet circle curbing 357.06


34-2 ft. corners 180.50


200 ft. curb bar


25.87


291/2 sq. yds. sidewalk at $1.20


(Kendall's-Peck Street) 35.40


Olof Pearson-Granolithic contract ..


4,623.40


Sand


7.75


Miscellaneous


263.97


$8,553.38


Labor


1,985.37


$10,538.75 -


Recording plans, etc. 2.04


$407.03


$5,864.55


as per council vote of Nov. 3, 1925.


149


ANNUAL REPORT


Curbing List


Street


Lin. ft.


Angell


133.5


Bicknell


232.75


Dunham


102.4


Lafayette


444.88


Mulberry


8.15


Railroad Avenue


90.58


Summer


1285.33


Tappan Avenue


104.6


Wolfenden


91.1


Total linear ft. set


2493.29


Includes ret.


Note : Finished gutter on Brown job on Elizabeth Street. This work was carried over from 1924.


Union and East Intersection Drainage-(Cambridge St. Drain-Carry


over funds.)


Labor


$4.50


Material


135.32


$139.82


Emory Street Drain-Carry over


Labor-Union and East


$60.62


Peck Street Basin-(Emory Street Drain-Carry over)


Labor


$38.31


Material


.34


99.27


Upland Road Sewer


Labor


$1,447.70


Material


350.83


1,798.53


Sewers-Operation and Maintenance


Inspector


$1,343.33


Cleaning Beds


Labor


$1,058.23


Material


9.60


1,067.83


Flushing sewers, etc.


Labor


$271.05


City of Attleboro-Water charge.


100.00


Miscellaneous


34.45


405.50


Insurance


86.43


Taxes-Town of Seekonk


56.88


Miscellaneous


121.24


$3.081.21


Water Street Bridge


Labor for rip-rip $2.34


150


ANNUAL REPORT


Construction of Mendon Road


Labor


$221.12 28.88


Material


250.00


Barrows Street


Recording plans and prints


5.96


1924 Sewer and Drains (Carried Over)


Lexington Avenue Sewer


Labor


$1,017.02


Material


126.99


$1,144.01


Short Street and Riverside Avenue Sewer


Labor


$523.30


Material


58.15


581.45


South Main Street Sewer


Labor


169.07


Material


15.38


184.45


Water and West Street Sewer


Labor


$52.02


Contract


15,329.61


Material


143.11


15.524.74


1924 Sewers and Drains-General Account


Labor


$190.63


Material


343.76


534.39


West Street Drain


Labor


$405.01


Material


223.91


628.92


Hodges Street Drain


Labor


15.51


Dunham Street Drain No. 2


Labor


$413.70


Material


771.51


1,185.21


$19.798.68


HIGHWAY DEPARTMENT


Comparison of Itemized Expenditures for 1923-1924-1925


Resurfacing


1923 $14,742.87


1924 $19,498.17


1925 $13,705.04 24,358.16


Construction


2,628.26


Bridges, repairs


2,705.24


2,952.11


2,891.65


Bridges, construction


4,915.51


539.17


2.34


151


ANNUAL REPORT


Drains, maintenance


2,181.91


2,131.55


1,745.07


Drains, construction


10,649.97


16,001.23


7,764.01


Crosswalks


128.97


158.43


102.77


Street cleaning


6,160.63


5,108.77


4,517.64


Street Sweeping


1,991.42


2,004.43


1,727.17


Street Patching-Tar and gravel


8,226.48


8,121.55


6,657.65


Sidewalks, maintenance


4,706.27


3,956.74


3,660.18


Snow and Ice


6,335.96


3,769.36


2,719.87


Machinery and tools (including crushers and rollers)


3,953.73


3,874.52


3.701.19


New motor trucks


459.50


Truck maintenance


911.72


1,209.48


1,333.49


Insurance, freight, express, etc.


1,668.86


1,897.44


680 50


Vacations


543.19


585.45


533.72


Dust layer and tar


12,001.06


12,339.57


12,515.71


Totals


$84,911.55 $84,207.97


$88,616.16


(Land damages and recording not included under "Construction" in 1925)


PUMPING RECORDS Totals Per Month


Month


Hours Pumping


Coal Con- Gallons Pumped sumed. Lbs. Venturi Meter


January


372 hrs.


100,695


31,427,000


February


372 hrs.


85,975


26,618,000


March


372 hrs.


91,043


29,084,000


April


358 hrs.


94,815


29,414,000


May


384 hrs. 25 min.


101.665


32,406,150


June


383 hrs. 10 min.


98,775


33,238,000


July


399 hrs.


104,473


33,500,000


August


403 hrs.


100,200


34,449,000


September


374 hrs.


96,755


33,690,000


October


390 hrs. 40 min.


100,787


36,245,000


November


380 hrs. 10 min.


/101,260


34,567,000


December


385 hrs. 30 min.


103,370


34,322,000


Totals


4573 hrs. 55 min.


1,179,813


388,960,150


PUMPING RECORDS Daily Averages Per Month


Month


Hours Pumping


Coal Con- Gallons Pumped sumed, Lbs. Venturi Meter


January


12 hrs.


3,248


1,013,774


February


12 hrs.


3,070


950,642


March


12 hrs.


2,937


938,193


April


11 hrs. 28 min.


3,160


980,466


May


12 hrs. 25 min.


3,279


1,045,359


June


12 hrs. 56 min.


3,292


1,107,933


July


12 hrs. 27 min.


3,370


1,080,645


August


13 hrs.


3,232


1,111,258


September


12 hrs. 14 min.


3,225


1,123,000


October


12 hrs. 40 min.


3,251


1,169,193


November


12 hrs. 50 min.


3,375


1,152,233


December


12 hrs. 30 min.


3,334


1,107,161


Totals


12 hrs. 34 min.


3,231


1,064,988


152


ANNUAL REPORT


MAIN LINE EXTENSIONS AND REPLACEMENTS-1925


Length


Size


Total Cost


Cost Per Foot


Adamsdale Avenue


492 ft.


6 in.


$869.22


$1.77


Brown Street


218 ft.


6 in.


520.48


2.39


Brown Street


231 ft.


6 in.


368.20


1.59


Chartier Street


183 ft.


6 in.


386.46


2.11


Curtis Avenue


391 ft.


6 in.


726.23


1.86


Fifth Street


265 ft. 5 in. 6 in.


420.61


1.58


Hayward Field


491 ft.


6 in.


731.04*


2.62


Hillcrest Avenue


401 ft.


6 in.


679.01


1 69


Jefferson Street (guarantee)


168 ft.


6 in.


391.11


2.33


Jefferson Street


60 ft.


6 in.


113.52


1.89


Jessie Avenue


204 ft.


6 in.


557.59


2.73


Jessie Avenue


192 ft.


6 in.


690.69


3.60


Lawn Street


231 ft.


6 in.


503.67


2.18


Major Street (guarantee)


192 ft.


6 in.


405.93


2.11


Major Street


48 ft.


6 in.


72.76


1.52


Rosewood Avenue


4 ft.


6 in.


241.27


5.48


South Main St. (replacement)


423 ft.


6 in.


818.33


1.93


Summit Street


80 ft.


6 in.


353.08


4.41


Sycamore Ave. (replacement)


48 ft.


6 in.


161.14 (inc'plete)


Upland Road


241 ft.


6 in.


684.54


2 84


Upland Road


60 ft.


6 in.


147.00


2.45


Upland Road


360 ft.


6 in.


746.17


2.07


Totals


5219 ft. 5 in


$11,100.96


Emory Street (replacement)


324 ft.


8 in.


$936.72


$2.89


Emory Street Extension


96 ft.


8 in.


200.63


2.09


Pearl Street


467 ft.


8 in.


1,450.96


3.11


Totals


887 ft.


$2,588.31


*Labor charges paid direct by Recreation Board-not included in this cost figure.


SERVICES LAID


Cost Main to


Cost Street Line


App. Cost Per Foot


Size


1


in.


Length No. 85 in feet 3495 ft. 4 264 ft. 11 ft. 6 in. - 1 in.


Street Line to House $1,469 21 $1,492.29 210.11 105.94


Total Cost $2,961.50 316.05


1.15


2


in.


4 193 ft. 10 in.


177.51


127.79


305.30


1.57


4


in.


1 24 ft. Golf Club


118.78


118.78


4.95


6


in.


7 249 ft. 6 in. Fire services


1,648.21


1,648.21


6.61


Hebron Avenue (replacement)


196 ft.


6 in.


512.91


$.85


11/2 in.


153


ANNUAL REPORT


REPLACEMENTS


Length


in Feet


Cost Main to


Street Line


Cost Street Line


to House


Total Cost


Cost Per Foot Approximate


9-1 in. Carrie M. Wilbar, New-


port Avenue


185 ft.


$28.01


$45.15


$73.16 $.40


Stephen T. Hall, 17


Morey Street


19 ft. 6 in.


8.88


8.91


17.79


.91


George J. Bauer, 258


South Main Street


75 ft. 9 in.


22.47


30.26


52.73


.70


Bridget Mckeon, 8


Morey Street


18 ft. 1 in.


8.82


6.96


15.78


.87


Mary A. McNamee, 21 Starkey Avenue 40 ft.


12.69


31.15


43.84


1.10


Attleborough 199 Park


100 ft.


26.95


62.57


89.52


.90


W. Jesse Gay, 33 School 34 ft. 2 in.


12.10


15.44


27.54


.81


Harriet S. Rowe, 82


Park Street


26 ft. 6 in.


15.19


14.22


29.41


1.11


North Avenue


27 ft.


54.08


54.08


2.00


2-11/2 in. Attleboro Gas Light Co., Dunham Street


104 ft.


47.14


51.29


98.43


.95


Luigi Malandrucolli, 88 Pine Street


32 ft. 4 in.


28.98


20.19


49.17


1.52


1-2 in. J. W. Gifford, Est.,


Bank Street


23 ft. 6 in.


41.28


21.67


62.95


2.68


SUMMARY OF STATISTICS YEAR ENDING DECEMBER 31, 1925 Form recommended by the N. E. Water Works Association


Population (Estimated)


23,519


Date of construction by Fire District


1873


Date taken over by town


1894


Owned by-City of Attleboro.


Source of supply-Two wells near Seven Mile River; Orr's Pond; Hop- pin Hill Reservoir.


Mode of supply-Pumped direct overflow to standpipe.


PUMPING STATISTICS


1. Builders of Pumping machinery-Deane, Barr and Snow.


2. Description of fuel used : (a) Kind-soft. (b) Brand of coal used- New River. (c) Average price of coal per net ton delivered, $7.10, plus or minus. (d) Percentage of ash, 8.31. (e) Wood, price per cord. None purchased.


3. Coal consumed, for year in pounds 1,179,813


Hospital,


Frank M. Payson, 44


154


ANNUAL REPORT


4. (Pounds of wood consumed) divided by 3, equals (3) plus (4) in pounds none used 5. Total equivalent coal consumed for the year, equals (3) plus (4) in pounds 1,179,813


6. Total pumpage for year in gallons-Venturi meter 388,960,150


7. Average static head against which pumps work, in feet 246


8. Average dynamic head against which pumps. work, in feet 274


9. Number of gallons pumped, per pound of equivalent coal (5) 303


10. Duty : Gallons pumped (6) x 8.34 (1bs.) x 100 x dynamic head Total fuel consumed (5) 75,337,038


11. Cost of Pumping, figured in Pumping Station expenses $13,224.43


12. Per million gallons pumped $34.00


13. Per million gallons raised one foot (dynamic) $0.124


STATISTICS ON CONSUMPTION OF WATER


1. Population (estimated-not census record) 23,519


2. Estimated population on lines of pipe 20,043


3. Estimated population supplied 20,043


4. Total consumption for year (gallons) 388,960,150


5. Passed thru meters (gallons) 228,955,015


6. Percentage of consumption metered *58.8%


7. Average daily consumption (gallons) 1,064,988


8. Gallons per day to each inhabitant 45.2


9. Gallons per day to each consumer 46.5


10. Gallons per day to each meter


330.6


11. Total cost of supplying water, per 1,000,000 gallons, fig- ured on total maintenance, including meter depart- ment complete $96.94


12. Cost of supplying water, per 1,000,000 gallons, figured on total maintenance plus interest on bonds, sinking fund, and bonds $174.18


FINANCIAL STATISTICS


Total gross receipts


$92,496.59


Gross expenditures :


Main line $13,240.42


Maintenance 37.705.33


Paid sinking fund 10,000.00


Paid interest on bonds ยท 14,045.00


Paid serial bonds 6,000.00


80,990.75


Excess of receipts over expenditures $11,505.84


STATISTICS RELATING TO DISTRIBUTION SYSTEM


2. Sizes


1. Kind of pipe Wrought and cast iron 11/2 in. to 24 in. 519 3. Number of hydrants now in use : (City Hydrants) (4 private hydrants) (1 Park hydrant) (1 Hayward Field)


4. Range of pressure on mains (pounds) 85-135


155


ANNUAL REPORT


SERVICES


5. Kind of pipe


Wrought and cast iron (cement lined)


'6. Sizes


1 in. to 6 in. 101


7. Number of services added during year


8. Number now in use 3430


9. Average cost of service for year (per foot) ..


Approximately $1.26


10. Number of meters in use


3221


11. Percentage of service metered (not includ- ing fire services) 100% *Actual meter record does not include thirty millions of gallons used in blowing off dead ends, horse troughs, fountains, flushing sewers and drains, fire service testing, and numerous other purposes which we are striving to control.


YEARLY RAINFALL. REPORT Year 1925


Month


Amount Rain 3 72 inches


Amount Snow 16.75- inches 0.25


February


2.08


March


4.97


April


2.67


May


1.77


June


1.59


July


5.23


August


1.59


September


3.94


October


3.90


November


4.70


December


4.35


2.00


Total


40.51 inches


19.00 inches


SEWER CONNECTIONS


Total connections January 1, 1925 1,361 Buildings served 1,566


Connections added during 1925


74


Building served 80


Total connections January 1, 1926


1,435


1,646


STREET LIGHTING


The following is a list of the number and kinds of lights in use January 1,. 1926 : Kind


Number


Cost


600 C. P.


84


$101.88 each


Sunset to 11:30 P. M.


600 C. P.


29


35.04 each


11:30 P. M. to Sunrise


100 C. P.


29


33.89 each


All night lights


60 C. P.


1,089


22.68 each All night lights


32 C. P.


20


20.00 each


All night lights under railroad arches.


A. B. C. STREET RAILWAY Profit and Loss Statement-1925


Credit Balance at beginning of year. $21,735.62


Credit Balance transferred from Income Account. 5,528.35


Balance carried forward to Balance Sheet


$27,263.97


January


156


ANNUAL REPORT


General Balance Sheet-1925


Investments


Cash


$33,095.46 994.45


$34,089.91


Funded debt Unmatured


$6,750.00


Accrued Interest


75.94


Profit and Loss (credit)


27,263.97


$34,089.91


Summary Statement of Unmatured Funded Debt-1925


Total par value outstanding at close of year


$6,750.00


Interest accrued at close of year $75.94


Interest during year accrued $379.69


Paid


$405.00


Income Statement for Year 1925




Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.