WATER SUPPLY DEVELOPMENT


During the year 1947 investigation and exploration by our consulting en- gineers, the Thomas Worcester, Inc., determined the site of several possible wells and the D. L. Maher Co., of Cambridge, Mass., drove test wells at these chosen spots. Two well locations were selected for immediate development, having been approved by the Dept. of Public Health.


On May 14, 1948, a contract was awarded to the D. L. Maher Co., for the development of these two wells. The contracts for cast iron pipe, pumps, and gate houses were let in due time and upon the arrival of the pipe, it was in- stalled by city forces as noted elsewhere.


Temporary pumping was made possible from the first well developed by the Maher Co. (known as Well "A") by means of a city owned gas pump and the temporary pipe line installed in 1947, thus giving the City much relief during the dry period. Upon the arrival and installation of the new pump designed for this well "A" and the completion of the permanent pipe line pumping was made available.


This Well "A" has proven most efficient with an estimated yield of 1000 gallons per minute.


We look with confidence upon the development of the other well ("B") in the early months of 1949.


66


ANNUAL REPORT


SEWERAGE TREATMENT PLANT


A contract for construction of this plant, the plans for which were pre- pared by Thomas Worcester, Inc., our consulting enginers, was awarded under date of November 17, 1948 to the Consolidated Construction Co. of Paw- tucket, R. I. Work was immediately started and by the end of the year due to the mildness of the weather considerable progress was made in grubbing, ex- cavation, and roughly shaping up the sludge beds.


Previous to this the contracts for the machinery, pump, piping, etc., had been let and, most of which, has been delivered.


We look for the completion of this Plant in July or August, 1949.


The department is much pleased in receiving a new five ton truck this year, also two additional snow plows of a modern design.


It is a pleasure to note for record, the completion of Chapter 90 road work on Pleasant Street, extending from Gustin Avenue for 1.10 miles easterly. This is a 50 ft. layout, with a 48 ft. roadway with curbing and a paved sidewalk on the northerly side.


In conclusion I wish to express to His Honor, the Mayor, the members of the Municipal Council, Department Heads, the Press, and to our own per- sonnel for their fine cooperation, our full appreciation.


Respectfully submitted, R. W. Mawney, Superintendent Public Works


« 2 »


ROAD CONSTRUCTION-STREETS ACCEPTED BEFORE 1948 (COMPLETED)


Name


Description


Length


Verndale Ave.


Bushee St .- 700' southerly


700'


Crossman Ave.


Holden St. to Holden St.


900'


Carpenter St.


Hazel St. to Martin St.


250


Brook St. Extension


Falmouth St. to Maynard St.


252'


Locust St.


Palmers-Oak Hill Ave. gravel fill


2900'


Total


5002'


RECONSTRUCTION OF OILED GRAVEL ROADWAY STREETS


Name


Description


Length


Sq. Yds.


County St.


1000' N. of Read St. northerly


1200


3610


County St.


500' S. of Read St. southerly


1000'


2700


Robert St.


Summer St. to Twelfth St.


822'


2500


Summer St.


125' E. & W. of Robert St.


250'


730


Benefit St. (shoulders)


Bicknell St. to Holden St.


2300'


2260


Oak St.


Benefit St. to Willard St.


200'


580


Total


5772'


12380


67


ANNUAL REPORT


PENETRATION PAVEMENT CONSTRUCTION


Name


Description


Length


Sq. Yds.


Falmouth St.


Pleasant St .- 30' E. of Brook St.


1200'


3500


Peck St.


No. Main St. to Perrin St.


1700'


4911


So. Main St.


Orange St. to Lamb St.


320'


1031


Starkey Ave.


Pleasant St. 100' westerly


100'


180


Total


3320'


9622


SURFACE TREATMENT AND HONING


Name


Description


Length


Sq. Yds.


No. Main St.


Sanford St. to Peck St.


800'


2200


Mechanics St.


No. Main St. 130' westerly


130'


370


Pleasant St.


Falmouth St. 100' W. of Gustin Ave.


1800'


5200


County St.


So. Main to Sixth St. (honed)


2300'


8950


Mechanics St.


Dennis St. to Canal Bridge


900'


2900


No. Main St.


Holden St. to Commonwealth Ave.


5000'


24111


Commonwealth Ave.


No. Main St. to North Attleboro line 2200'


8000


South Ave.


Thacher St. to West St. (Pen. sealed) 7300'


1600'


4630


Dennis St.


Eldridge St. to Jefferson St. (honed)


900'


2600


Fifth St.


Jefferson St. to County St.


575'


1660


Sixth St.


County St. to the end


550'


1640


Turner St.


Crown Mill to Railroad


1950'


5640


Wall St.


So. Main to County St. (Pen. sealed)


720'


2100


Water St.


Bungay River to West St.


300'


1040


Dunham St.


Union St. to Pine St.


350'


1147


Sturdy St.


Emory St. to Holman St.


250'


722


Holman St.


Ashley's Forest St.


350'


1010


So. Main St.


Locust St. to Fairview Ave.


2000'


5800


So. Main St.


Spring St. to Chester St.


200'


580


Ellis St.


Clarence St. to Lamb St.


300'


870


Maple St.


Brook St. to Solomon St.


1100'


3200


Lincoln Ave.


No. Main to Ashton Rd.


1050'


2920


Ashton Road


Payson St. to West St.


750'


2170


Norfolk Row


Berwick Rd. to Westgate Rd.


350'


1010


Westgate Road


West St .- 200' southerly


200'


580


Hazelwood Ave.


No. Main St. to Bank St.


450'


1300


Total


34375


117350


« » »


DRAINAGE PIPE LINE CONSTRUCTION


Pipe


Robert St.


Summer St. to Tweltfh St.


(1265'-12" 3 catch basins and


( 130'-10" 1 manhole


Locust St.


Culvert South Mello's Farm


64'-21"-60'10"


Linden St.


at Palm Street


(66'-10" 3 catch basins


West St.


at Rocklawn Ave.


(40'-10"


(60'-12" 2 catch basins


W. Carpenter St. near Cumberland Line


(320'-12" 2 manholes ( 22'-10"


25000


West St.


Water St. to Clifton St. (honed)


68


ANNUAL REPORT


GRANOLITHIC SIDEWALKS, GRANITE CURB AND COBBLE EDGESTONE


Granolithic Sidewalks and Drives placed by Contractor, Clarence H. and Roy Randall 2571.9 Sq. Yds. Granite Curbing placed by Contractor, Clarence H. and Roy Randall .... 1893 feet Granite Curbing reset by Contractor, Clarence H. and Roy Randall 771 feet Granite Driveway Corners set by Contractor, Clarence H. and Roy Randall 44


BRIDGES, FENCES AND CULVERTS


Deanville Road-River Bridge, New 4" wood deck


SEWERS-NEW CONSTRUCTION


Hope Street-360 feet (8" Vitrified)


SEWER CONNECTIONS


Total Connections, Jan. 1, 1948 2104 Buildings served 2316


Connections added during 1948. 25


25


Totals 2129


2341


Total Miles of Sewer-39.22


STREET LIGHTING


Street Lights placed during 1948: 24-100 C. P.


Number and kind of lights in use December 31, 1948:


Kind


Number


Cost


1000 C.P.


59


$79.00 each


Sunset to 11:30 P.M.


1000 C.P.


34


95.00 each


All night lights


1000 C.P. U/G


1


75.00 each


All night lights


250 C.P.


69


28.00 each


All night lights


100 C.P.


1319


18.00 each


All night lights


4-S. Blinkers


69


ANNUAL REPORT


HIGHWAY DEPARTMENT Comparison of Itemized Expenditures for


1920


1946


1947


1948


Labor


(Total cost including labor) $75,428.89


$86,283.83


Resurfacing


$13,850.45


$7,529.32


7,110.86


12,509.44


Drains Maintenance


1,556.53


2,489.46


1,384.19


1,763.52


Street Sweeping


2,611.32


1,965.96


1,382.15


1,745.50


Street Patching


9,572.84


8,001.24


3,499.60


5,981.96


Street Cleaning


7,998.46


7,657.12


594.46


114.99


Sidewalk Maintenance


5,142.73


575.91


1,000.00


78.99


Road Rollers


1,757.95


115.77


98.95


109.01


Highway Auto Maintenance ..


726.70


Road, Oil and Tar


22,188.37


7,931.31


6,338.21


14,391.43


Bridges, Fences and Culverts


608.04


3,233.93


758.88


1,105.41


Crushers


185.42


Ten Mile River and Thacher Brook


711.26


126.18 1,622.36


2,858.14


3,931.89


Rent-Maynard Street Land


69.60


Vacations


393.28


1,451.15


Signs, Clocks and Numbers


344.00


121.44


641.29


266.91


Phones


205.38


253.06


274.86


Incidentals


51.22


65.85


61.34


Snow and Ice


11,073.23


7,829.76


1,390.32


4,468.07


Unexpended Balance of 1919 Appropriation


19,981.13


Deferred Barn,


Stone and


Gravel Charges


955.95


Crosswalks


222.11


Care of Common


335.85


Express, Freight, etc.


349.65


$102,697.28


$50,907.51


$102,951.70 $133,087.15


New Equipment


3,665.80


17,016.94


31,363.57


12,206.77


(Listed as Machinery,


Tools, etc., 1920)


Repair Division


9,000.00


9,900.00


10,000.00


(Paid by Special Accounts in 1920)


* Totals


$106,363.08


$76,924.45


$144,215.27


$155,293.92


*These totals exclude Sidewalks and Curbing


146.85


Insurance


2,062.41


70


ANNUAL REPORT


NEW SERVICE-1948


Size


Number


Length in Feet


Cost-Main to St. Line


Cost-St. Line to House


Total Cost


3/4 inch


105


7,314' 2"


$4,445.79*


$5,163.38*


$9,609.17


1 inch


7


547'10"


432.17


237.65


669.82


1 1/2 inch


4


240'


279.03


321.59


600.62


2 inch


1


82'


232.41


97.15


329.56


3 inch


2


167'


310.31


359.56


669.87


6 inch


2


109'


Fire Ser.


837.15


837.15


Totals


121


8,460'


$5,699.71


$7,016.48


$12,716.19


* Difference in cost due to owners digging trench from street line to house.


« » « »


SERVICE REPLACEMENTS-1948


Size


Number


Length in Feet


Cost-Main to St. Line


Cost-St. Line to House


Total Cost


3/4 inch


40


* A-37


617'11"


$1,061.64


$43.95


$1,105.59


B- 1


C- 2


1 in.


1


A- 1


8' 6"


30.43


30.43


11/2


1


A- 1


16'


47.87


47.87


2 in.


1


C- 1


29'


109.14


35.30


144.44


Totals


43


A- 1


671' 5"


$1,249.08


$79.25


$1,328.33


*A-Services replaced from main to street line


* B-Services replaced from street line to house.


*C-Services replaced from main to house.


HYDRANTS


Total number of hydrants 12-31-48-748.


71


ANNUAL REPORT


WATER MAIN LINE EXTENSIONS


6"


8"


10"


Pipe


Pipe


Pipe


Bayberry Hill Road


Belair Avenue


1241.'


Brook Street


1057.5'


Curtis Avenue


475.'


Division Street (Note: 500 ft. of 11/2") replaced


726.75'


Gilmore Street


346.'


Hope Street


176.'


Hudson Street


324.5'


Locust Street


2250'


Lockwood Avenue


263.5'


Newton Street


323.6'


Patterson Street


431.'


Reynolds Street


250.'


Ridgewood Road


352.'


Rocky Terrace


287.'


Rocklawn Avenue


271.9'


Roosevelt Street


213.6'


Sheffield Road


364.'


Town House Road


919.4'


Veery Road


97.'


Warren Road


263.'


Totals


7325.25'


1057.5' 2577'


327'


1948 Main Line Extensions-10959.75' (2.08 Miles) Total Mains-86.01 miles


In addition to the work performed by our Water Department forces as listed above a pipe line connecting two new wells to the treatment plant at the Pumping Station was also installed by our own force. The lengths are 1926 feet of 14" cast iron pipe, 606 feet of 12" cast iron pipe with the necessary connections to the wells. The result was considerable saving over contract work.


72


ANNUAL REPORT


PUMPING RECORDS Electric and Snow Pumps, South Attleboro Totals per Month


Month


Hours Pumping


Kilowatt Gallons Pumped Hours Used Venturi Meters


January


495 hrs.


78,400


70,322,000


February


491 hrs. 5 min.


77,820


69,339,000


March


539 hrs. 20 min.


84,731


75,283,000


April


491 hrs.


77,640


69,620,000


May


478 hrs. 25 min.


75,720


68,262,000


June


498 hrs. 25 min.


78,660


70,707,000


July


541 hrs. 50 min.


83,020


72,745,000


August


558 hrs. 50 min.


88,350


80,656,000


September


527 hrs. 40 min.


84,090


77,685,000


October


483 hrs. 5 min.


78,340


73,382,000


November


472 hrs. 20 min.


77,010


72,444,000


December


500. hrs. 50 min.


84,340


75,768,000


Totals


6077 hrs. 50 min.


968,121


876,213,000


Daily average for the year-16 hours., 36 minutes


2,394,000


Maximum amount pumped-Day-August 26, 1948


3,305,000 gals.


Minimum amount pumped-Day-May 31, 1948


1,319,000 gals.


Maximum amount pumped-Week-August 22-28, 1948


19,409,000 gals.


« » « »


PORTABLE GASOLINE PUMP __ 1948 Pumping Water from Orr's Pond back on Filter Beds


Month


Number of Days


Gallons


September


21


13,838,400


October


24


27,325,950


Totals


45


41,164,350


COMPARATIVE YEARLY PRECIPATION REPORT (Recorded at South Attleboro Pumping Station)


Month


1943 Precipi- tation


1944 Precipi- tion


1945 Precipi- tation


1946 Precipi- tation


1947 Precipi- tation


1948 Precipi- tation


Snow


January


3.06"


22.50"


2.06"


1.00


3.12"


18.00"


3.63"


7.75"


2.60"


6.25"


5.13"


35.00'


February


1.50"


3.25"


2.30"


5.50"


4.02"


26.25"


3.47""


11.25"


0.99"


9.00"


1.95"


14.50"


March


3.26"


9.25"


4.38


9.50"


2.47"


0.25"


1.84"


1.00"


2.87"


2.75"


3.87"


10.50"


April


3.68"


4.55"


2.83'


2.71"


4.92"


0.50"


3.68"


May


4.07"


0.85"


4.62"


4.58"


3.83"


9.62"


June


2.16"


4.93"


5.81'


3.43"


5.12"


4.36"


July


3.04"


1.11"


2.86"


1.45"


4.55"


4.74"


August


2.23"


1.68"


3.04"


11.66"


1.75"


3.11"


September


1.26"


10.66"


3.21"


2.19"


3.24"


2.55"


October


5.70"


3.21"


2.70'


0.34"


1.88"


4.94"


November


2.71"


6.41"


.50"


8.21"


5.00"


0.95"


5.12"


0.75"


5.54"


December


0.98"


3.41"


9.50"


6.67"


32.00"


1.52"


1.97"


3.18"


22.25"


1.54"


11.00"


Totals


33.65"


35.00" 45.55"


26.00"


49.56"


81.50" 37.77"


21.97"


40.05"


41.50" 51.03"


71.00


Snow


Snow


Snow


Snow


Snow


ANNUAL REPORT


73


74


ANNUAL REPORT


EXPENDITURES-1948-PUBLIC WORKS DEPARTMENT Charges to December 31, 1948


General Administration:


Superintendent's Salary


$4,000.00


Asst. Engineers' Salary, etc.


11,172.70


Clerical Labor


6,259.90


Engineersing Supplies


153.71


Office Supplies


197.80


Insurance


39.84


Telephone


106.49


Incidentals


30.16


$21,960.60


Highway Division:


Labor


$86,283.83


Resurfacing


12,509.44


Drains


1,763.52


Street Sweeping


1,745.50


Street Patching


5,981.96


Street Cleaning


114.99


Sidewalk Maintenance


78.99


Road Rollers


109.01


Road Oil and Tar


14,391.43


Bridges, Fences and Culverts


1,105.41


Insurance


3,931.89


Signs, Clock and Numbers.


266.91


Incidentals


61.34


Snow and Ice


4,468.07


Sidewalks and Curbing


587.05


Phones


274.86


$133,674.20


Street Lighting


34,575.07


Water Division:


Maintenance Payroll


26,075.83


Maintenance Material


1,206.71


New Meters


3,652.02


Services


10,040.40


Main Line Maintenance


944.66


Shop and Barn


1,183.53


Auto Operation


71.75


Insurance


1,688.94


Taxes


375.54


Incidentals


30.62


45,270.00


Water -- Main Line Extension .....


40,000.00


Carleton St. Main Line Extension


.....


1,054.64


75


ANNUAL REPORT


Pumping Station Division:


Payroll


12,968.20


Overtime


557.76


Fuel


1,353.54


Pumps


374.17


Boilers


78.57


Cleaning Filter Beds


1,433.05


Care of Equipment, Grounds and Beds


542.63


Phone


66.57


Incidentals


21.60


Chemicals


1,762.78


Electric Power and Light


20,817.09


39,975.96


> « »


Sewer Division:


Filter Beds


6,699.33


Repair and Care of Sewers


350.67


7,050.00


« »


Rifle Range


49.34


Bert F. Madden Pension Account.


770.35


Chapter 90 Projects


65,270.09


Sidewalks and Curbing Special Account


16,000.00


Repair Division-Material


10,000.00


Gasoline Dispensary Account


14,471.19


Brook Street Drainage


881.18


Reconstruction of Murray Church Property


1,863.64


Robert Street Drain


60.81


Emergency Labor Account.


6,992.24


Rubbish Collection Account


400.00


Water Supply Development


78,453.10


Linden and Palm Street Drainage


514.83


Metals and Controls Sewer and Drain


2,800.00


Truck Purchase Account


9,956.77


Trailer Purchase Account


2,250.00


Hope Street Sewer Extension


750.00


Sewerage Treatment Plant Construction


7,750.00


Sewerage Treatment Plant Construction (N.R.).


4,636.83


Total of 1948 Expenditures


$547,430.84


76


ANNUAL REPORT


Report of Custodian of Property


1948 Expenditures $425.00


1949 Budget 425.00


May 25, 1949


Honorable Francis J. O'Neil Mayor of City of Attleboro City Hall Attleboro, Massachusetts


Dear Mr. Mayor O'Neil:


The function of this office in selling City property acquired by the fore- closure of Tax Titles has been keeping pace with the desires of people buying land for building purposes and gardens.


I have been successful in making many sales, advantageously for the City, with the consent of the Honorable Members of the Municipal Council with the approval of the Mayor's office.


Each year I sell many parcels of land which have been non-tax producing and which effectively place them back on the rolls of taxable property and in most instances new valuation inures to the benefit of the City by the buildings placed thereon.


I still have many parcels of desirable land for building purposes and my office is open to the public for inquiry regarding same.


I wish to thank the Finance Committee, the Assessors' Office and Treasu- rer's Office for their kind assistance in working closely with me in the perform- ance of my duties.


Respectfully submitted,


Henry Rotenberg,


Custodian of Property Acquired by the


Foreclosure of Tax Titles


77


ANNUAL REPORT


Report of Recreation Commissioners


1948 Expenditures .......


$24,854.20


1949 Budget 17,000.00


HAYWARD FIELD


This field which took a great deal of punishment last year on account of stretches of dry weather was brought back to normal.


DODGEVILLE


The balance of the playing field at Dodgeville was re-seeded and back stop provided for. Most of the excavations beyond home plate were filled for safety sake. After the new road is laid out a more suitable playground for children will be made possible.


FINBERG


The problem of relocating the diamond made it necessary to go much further back than was originally planned so that next year we will have to grade a larger area than anticipated. This will make it necessary to leave the diamond in the original position for another year. A new backstop is on hand to be erected when possible.


HORTON


The playground equipment at Horton Field was put in good condition, the field re-seeded and the tennis court put in playable condition.


BRIGGS


At the Briggs Playground the usual paint jobs were accomplished on pools, seats, etc. This popular playground was a hive of activity all season.


HEBRONVILLE


The entire playing field at Hebronville has been layed out and seeded. A new backstop was installed at the South Main Street side, thus reversing the position of the field.


SOUTH ATTLEBORO


The South Attleboro Playground was handled as planned by the joint committees of the council and South Attleboro. Some difficulties were en- countered but overcome by the laying of a drain at the east end of the field. The field is seeded and a backstop installed.


In the building of these new fields the Recreation Commissioners wish to thank those who have helped, the Mayor and Municipal Council and the employees of the Recreation Department. Especially do we wish to commend the Public Works Department, without whose help and cooperation the build- ing of these fields would have been impossible.


Respectfully submitted,


Recreation Commissioners


William A. Blackburn, Chairman William Liddell John J. Murray Frank Miller John Redding


78


ANNUAL REPORT


Report of Sealer of Weights and Measures


1948 Expenditures $2,180.12


1949 Budget 2,159.00


To His Honor the Mayor and Municipal Council:


I herewith submit my report as Sealer of Weights and Measures for the year ending December 31, 1948.


In accordance with the laws of the State, weighing and measuring devices were tested and marked if found correct. In some cases it was necessary to condemn devices not legal for use in Massachusetts.


Pedlers of various articles were continually checked for licenses and com- plaints that came to the office were checked with the cooperation of Chief Marron and his officers and Frank Cushman of the Health Department.


State Inspector Harney visited the city on three occasions for heavy capacity scale sealing and bulk station fuel oil tests and other inspections in which the sealer worked with him.


Respectfully submitted,


Daniel O'Connell,


Sealer Weights and Measures


79


ANNUAL REPORT


Report of Zoning Board of Appeal


1948 Expenditures $24,854.20


1949 Budget 17,000.00


To His Honor the Mayor and the Municipal Council:


During the calendar year 1948 the Board of Appeal held fourteen regular and fifteen special meetings. It considered forty-six applications and appeals, of which thirty-three were granted, in whole or in part, twelve were denied, and one was withdrawn.


The statistics of the Board for the past three years are as follows:


1946


1947


1948


Number of Regular Meetings


20


19


14


Number of Special Meetings


15


16


15


Total applications or appeals filed


57


41


46


Granted (in whole or in part).


36


27


33


Denied


13


13


12


Withdrawn (or otherwise disposed of)


6


0


1


Applications or appeals pending at end of calendar year


2


1


0


During the year 1948 Messrs. Lawrence B. Gilbert and John D. Baer were appointed as associate members of the Board.


Respectfully submitted,


Elmer E. Tufts, Jr., Chairman Clarence D. Roberts Charles E. Judge Lawrence B. Gilbert, Associate Member John D. Baer, Associate Member


80


ANNUAL REPORT


Report of City Treasurer


1948 Expenditures $7,342.78


1949 Budget 7,080.50


To His Honor, the Mayor, and the Municipal Council:


I herewith submit the annual report of the finances of the City of Attleboro, for the year ending 1948, together with a statement showing the amount which the City is within the debt limit, a classified statement of the debt, and the amount of interest and debt to be paid in 1949.


REVENUE


Cash on hand January 1, 1948


215,573.30


Receipts for the year 1948:


Taxes


Current Year


Property


1,243,655.89


Poll


14,352.00


Motor Vehicle Excise Tax


77,677.81


Est. of Deceased Persons


134.00


Previous Years


Property


62,969.57


Poll


20.00


Motor Vehicle Excise Tax


1,465.38


From the State


Corporations


168,470.35


Income Tax


128,042.80


Reimbursement for loss of taxes


7.61


From Tax Titles


On Tax Titles


1,024.39


Int. on Tax Titles


56.12


Redemption Deeds


44.00


1,124.51


Total from Taxes


1,697,919.92


Sale of Tax Possessions


2,980.00


Licenses and Permits


Licenses


Dog Licenses


4,254.60


Liquor Licenses


13,738.00


Sundry


2,822.80


20,815.40


Permits


Marriage


612.00


All Other


532.00


1,144.00


Total from Licenses and Permits 21,959.40


Fines and Forfeits-Court


3,615.40


81


ANNUAL REPORT


Grants and Gifts


From State-For Pub. Wks. Dept. For Highways-Chap. 90 From State. 34,342.84


From County


15,943.66 50,286.50


From State-For Schools


English Speaking Classes


60.00


Dist. of Federal (Smith-Hughes)


75.00


From State-For Welf. U. S. Grant


A.D.C .- Only 8,929.54


O.A.A .- Only 99,254.10


108,183.64


From Individual-For Hayward Field


500.00


From S. M. Stone Fund-For Capron Park


449.00


From Margaret Spangler Fund- For Capron Park


75.00


From Capron Park-For Capron Park


4,200.00


Total from Grants and Gifts 163,829.14


Special Assessments


For Expenses


Sewers


227.52


Sidewalks and Curbing


14,259.97


Total from Special Assessments 14,487.49


Privileges


Use of streets for underground wires


25.00


Departmental


General Government


Collector


1,214.22


City Clerk


2,729.73


Total from General Government 3,943.95


Protection of Life and Property Inspection


Sealing of Weights and Measures


119.54


Inspection of Buildings


534.00


Total from Protection of Life and Property 653.54


Health and Sanitation Health


Subsidies for Patients at T.B. Hospital 2,172.13


All other


20.00


Total from Health and Sanitation .. 2,192.13


82


ANNUAL REPORT


Charities


Reimbursements for Relief Given


From other Cities and Towns


1,850.59


From State


20,049.96


From Individual


58.00


Reimbursement for Aid to


Dependent Children


From State


13,424.43


From Individual


15.00


Reimbursement for Old Age Assistance


From Other Cities and Towns


1,884.45


From State


117,537.85


Infirmary


829.60


Total from Charities


155,649.88


Soldiers' Benefits


From State-State Aid


10,554.53


Education


From State


Tuition of children


11,545.56


Smith Hughes


George Barden Acct.


769.03


12,314.59


Other Tuitions


Town-Jewelry Trade


1,253.50


Individual


678.75


Vet. App. Class


438.60


2,370.85


Sale of Books and Supplies


187.50


Rents


309.90


Sale of Bus Tickets


3,466.42


Miscellaneous Fund


460.91


All other


202.85


Total from Education


19,313.02


Libraries


Fines and Rentals


889.50


Miscellaneous


115.47


Total from Libraries 1,004.97


83


ANNUAL REPORT


Unclassified


Current Tax Payment Act of 1943


88,227.71


Rents of Public Property


2,192.00


Sale of City Owned Property


300.00


Auditor's Dept.


10.00


Veterans' Service Center


74.00


City Clerk's Department


3.57


Clerk of District Court


436.00


Collector's Department


134.50


Treasurer's Department


166.59


Police Department


62.01


Fire Department


125.65


Health Department


38.00


Veterans' Benefits


44.21


Public Works Department


417.88


School Department-Sale of Equipment from Various Schools


4,553.12


Teachers' Annuities From State


10.00


Public Welfare Department


Recovery ADC


160.00


Recovery OAA


378.54


538.54


Library


84.73


Maurice J. Baer Legacy


2,500.00


From Individual-Gift Payment for Flag


32.52


Helen W. Metcalf Prize Fund


100.00


Capron Park Concession


200.00


From State-Public Service


50.48


OAA-Meals Tax


6,694.88


6,745.36


Payment of U. S. Cert. of Indebtedness


War Savings Investment Account


50,000.00


Premium on Sewer Bonds, dated 6/1/48


807.00


All Other


13.45


Total from Unclassified


157,816.84


Public Service Enterprises


Water


Income from Sale of Water


161,908.21


Pipe and Labor


5,982.25


167,890.46


Interest


On Deferred Taxes


1,698.18


Deferred Water Rates


218.18


Deferred Special Assessments


443.87


Soldiers' Bonus Fund Account


167.92


On Certificate of Deposit


376.40


2,904.55


84


ANNUAL REPORT


Agency From the County-Dog Licenses 3,116.86


Municipal Indebtedness


Temporary Loan in anticipation of Revenue of 1948 . .. 250,000.00


Refunds


General Departments


48.64


From Auditor's Dept. Health Dept.


1.00


Pub. Wks. Dept .- Fr. State


371.19


Fr City


3.00


374.19


Pub. Welf. Dept.


ADC-City


213.25


Fed.


93.75


307.00


OAA-City


1,728.84


Outside Relief


464.65


City Infirmary


16.70


Soldier's Benefits


109.60


School-Teachers' Salaries


130.00


Fuel Account


113.44


Public Library


7.32


Park Department


1.20


Attleborough Hospital


7.11


3,309.69


Total cash on hand January 1, 1948 and receipts for the year 1948


2,898,740.07


Payments for the year 1948


2,689,461.44


Cash on hand January 1949 209,278.63


2,898,740.07


NON-REVENUE


Cash on hand January 1, 1948


145,916.59


Municipal Indebtedness


Sewer Bonds, 11/2 %, dated 6/1/48, payable $10,000 June 1, 1949/1958, price 100.807 100,000.00


245,916.59


Payments for the year 1948 Cash on hand January 1, 1949