Four small crawler tractors for sidewalk snow plowing are required.


1


71


Annual Report


A modern truck equipped with a hoist to handle water pipe both in the trench and storage yard would save time and add to the safety of personnel.


County Street relocation and construction under a Chapter 90 schedule should be continued from the northerly end of the 1951 construction to Read Street, at least, with a progressive construction schedule set up to ultimately insure the rebuilding of this street to County Square by the aforesaid Chap- ter 90 State and County participation.


Brown Street should be completed to the Rhode Island line also with Chapter 90 funds. The work that will remain after the 1952 construction will be very small as far as the pavement is concerned, the only problem being the purchase or removal of one low cost house.


In general, a schedule for a more permanent type of pavement for secondary streets with penetration or sheet asphalt surfaces for primary streets must be started for replacement of many old locations carrying heavy traffic, particularly in the industrial areas.


South Main Street and Mill Street at G. A. R. square should be resur- faced in 1953. The present pavement was placed in 1920, and is now in such condition that maintenance and repair is not economical.


The present practice of complete excavation of unsuitable sub-base 4 material and the placing of a base of gravel will insure a minimum of sun» face maintenance in the future.


SANITARY SEWERS:


Extend a sewer main from the Ten Mile River Trunk Line at the N. Y. , N. H. , and H. R. R. arch to John William Street, thence to Thacher Street and County Square. This installation would serve the area bounded by Thirteenth, Robert and Thacher Streets and if home building continues it will be necessary in the near future.


SURFACE DRAINS®


A pipe line from the Ten Mile River as described above and in the same area would care for surface runoff as streets are hard surfaced. The line should be extended to a point near the Tiffany School on Thacher Street and on Cedar Street to Chestnut thence westerly on Chestnut to the rear of Tiffany School to intercept the surface water runoff and prevent erosion of the slopes in the school yard.


A drain line should be placed on Bayberry Hill Road from the intersec- tion of Raeburn Drive westerly, crossing South Main Street and private pro- perty to the Dodgeville Pond. This line laid with open joints and surrounded with clean gravel would not only care for surface runoff but would aid very materially in inducing sub-surface drainage thereby tending to reduce the possibility of wet cellars in that area.


72


Annual Report


On Pine Road from Washington Street to Robinson Avenue a drain- age system should be constructed to remove surface water thereby pre- venting gutter erosion which results in a shoulder maintenance problem.


The splendid cooperation of all City Department Heads plus that of Department employees has made it possible for this Department to look back on a very successful year and for much of our accomplishment I wish to thank His Honor, the Mayor, members of the Municipal Council, and the many citizens for the cooperation and helpful suggestions that made these results possible.


Respectfully submitted,


Russell F. Tennant Superintendent Public Works


1951 - NEW CONSTRUCTION


No. of feet


Marjorie St. and Ellis St.


1562


*


John William St.


916


*


Cypress Road


1400


*


Thirteenth St.


500


*


4378


1951 - RESURFACING


No. of feet


Palm St. and Prairie Ave.


916


*


West Street Curve


1875


Tiffany St. and Rocklawn Ave.


938


*


Bliss Ave. and Hebron Ave.


883


*


Read St.


5625


Pike Ave.


6276


*


James St.


.625


Bishop St.


2007


X


Orange St. , Hazel St. to Martin St.


375


*


Bushee St. and Roosevelt Ave.


1553


Lamb St.


500


Hawthorne St.


700


Clifton St.


750


Thacher St.


500


Holman St.


1800


**


Dunham St.


900


**


1


Fourteenth St.


300


26523


* Not Sealed


* * Stone Penetration


73


Annual Report


DRAINAGE PIPE LINE CONSTRUCTION - 1951


Concrete Pipe


Catch Bsns.


Man Holes


24"


18"


15"


12"


10"


Sheffield Acres


5


1


230'


410'


Courtois Plat 11


1


160'


600'


760'


Patterson St.


4


280+


Intervale Ave.


10


1


700'


40'


250'


30'


North Ave.


1


20'


Water St.


2


60'


Carlton St.


50'


Hawthorne St.


6


240'


380'


Mendon Rd.


1


2


320'


Hillcrest Drive


1


30


South Ave. (Multiple) 1


TOTALS


42


5


1070'


200' 1600' 1690'


GRANOLITHIC SIDEWALKS & GRANITE CURB


Contractor - Clarence H. & Roy Randall


Granolithic Sidewalks


3481 yds.


Granolithic Drives


507 "


Granite Curbing


3647 ft.


Granite Curbing Reset


1444 " ,


Granite Driveway Corners


81


Circular Granite Curbing


15 ft.


BRIDGES, FENCES AND CULVERTS


Cable Fence


Lamb Street


400 feet


Thacher Street.


100


11 10 concrete posts. ,


.


.R. R. Slope, Dodgeville Overpass. 320


32


Union Road.


120


West Street at Crusher


200


Bridge Redecking


Mendon Road - Major repairs to steel work done by Railroad. - 3" + 2" ( 1 1/2" asphalt deck by City.


SEWER CONSTRUCTION - 1951


8" Pipe


10" Pipe


Manholes


South Ave.


1223"


5


Burt St.


650


4


Left of Burt St.


234


2


Hses. #22-#26


Smith Circle


647


3


Left of Smith Circle


302


2


O' Donnell Drive


219


2


Fuller Drive


150


1


Southwest of Hillcrest Dr.


414


continued on other page 74


2


,


Annual Report


SEWER CONSTRUCTION (cont'd) 8" Pipe


10" Pipe


Manholes


Patterson St.


780


5


James St.


200


1


TOTAL ADDITIONS TO SEWER SYSTEM - 5144 ft. (. 97 miles) TOTAL MILES OF SEWER 12/31/51 - 41. 05 miles


SEWER CONNECTIONS - 1951


Total Connections January 1, 1951 - 2185 Buildings served - 2397 72


Connections added during 1951 - 72


2257


2469


STREET LIGHTING - 1951


Number and kind of lights in use December 31, 1951:


1000 C. P. - 59 - $79. 00 each year - Sunset to 11:30 P. M.


1000 C. P. - 34 - 95.00 =


11 - All night lights 1000 C. P. - U/G-1-75.00 11 11


11 light


600 C. P. - 40 - :5. 416 11 mo. - lights


250 C. P. - 137 - 2. 333


100 C. P. - 1291- 1.50


11 11


11


11


NEW SERVICES - 1951


SIZE


NUMBER


LENGTH IN FEET


TOTAL COST


3/4 inch


127


8441'8"


$8925. 10


1 inch


8


1005'10"


1047. 79


1 1/2 inch


2


269'


572.66


2 inch


2


338'


807. 53


Totals


139


10053'6"


$11353. 08


SERVICE REPLACEMENTS - 1951


SIZE


NUMBER


LENGTH IN FEET


TOTAL COST


3/4 inch


23


45018"


$746.80


1 inch


3


26'


125.08


2 inch


2


25'6"


85.53.


Totals


28


502'2"


$957. 41


11


11


11


11 =


11 11


HYDRANTS


Total number of hydrants 12/31/51 - 896


75


Annual Report


WATER MAIN LINE EXTENSIONS - 1951


HYDRANTS


6" PIPE 8" PIPE


Annex Drive


1


475. 5"


Bellevue Ave. (Fisher St. to Intervale)


361.


*Brownell St, (Orange to Parker St. ) Burt St.


162.5


Carleton St.


1


358.


Clayton St.


340.


Clifton St.


1


728.5


Crossman Ave.


40.


Dewey Ave.


168.


Dunham St. (Repl. 4'' pipe) Pine St. easterly Elmina Drive


234.


Fisher St. (Mary St. Southerly)


210.3


Fisher St. (13th St. to Bellevue Ave. )


1


309.6


Fuller Ave. (Repl. 220 ft. of 1 1/2" pipe)


354.


*Hazel St. (From Orange St. to New School)


Holman St. (Repl. 4" pipe) (Pleasant to Morey St. ) Hudson St.


918. 6


Intervale Ave. (Repl. 150 ft. of 1 1/2" pipe)


2


426.6


*James St. (Repl. 6" pipe) Brownell St. to New School


221.


*James St. (Repl. 150' of 1 1/2" pipe)Orange to Maple St. - 1 Kratz Ave.


167. 4


Lake Shore Drive


216.


Martin St. (Repl. 151. 2 ft. of 1 1/2" pipe)


Brownell St. south 1


285. 2


Mary St.


33. 6


*Orange St. (Repl. 4" pipe) Hazel to Martin St.


340.


*Orange St. (Parker to Pine St.) _


1


370. 2


Park Circle


2


1330. 8


*Parker St. (Brownell to Orange St. )


1


292.


*Parker St. (Røpl. 150' of-2" pipe) Orange to Mulberry St.


2


276.


Patrick St.


1


301. 6


Prescott St.


1


479.


Randolph Ave.


618. 5


Rocklawn Ave.


146. 6


South Ave. (East of Greenfield St. )


1


487. 5


South Ave. (West of Greenfield St. )


177.


Sullivan St.


341. 6


Totals-


19


10112. 9'


3317. 9'


*New lines and repl. lines to serve Peter Thacher Junior High School


76


441. 5


519.3 396.


2


561.


342. 4'


Annual Report


NEW SERVICES - 1951


SIZE


NUMBER


LENGTH IN FEET


TOTAL COST


3/4"


127


8441'8"


$8925. 10


1"


8


1005'10"


1047. 79


1 1/2"


2


269'


572. 66


2"


2


338'


807. 53


TOTALS


139


10053'6"


$11353. 08


SERVICE REPLACEMENTS - 1951


SIZE


NUMBER


LENGTH IN FEET


TOTAL COST


3/4"


23


450'8"


$746.80


1"


3


26'


125. 08


2"


2


25'6"


85. 53


TOTALS


28


502'2"


$957. 41


HYDRANTS


Total number of hydrants 12/31/51 --- 896


EXPENDITURES - 1951 - PUBLIC WORKS DEPARTMENT


Charges to December 31, 1951


GENERAL ADMINISTRATION:


Superintendent's Salary


$ 4400. 00


Asst. Engineer's Salaries, etc.


15396. 19


Clerical Labor


7536. 82


Engineering Supplies


323. 83


Office Supplies


199. 38


Insurance


39. 15


Telephone


160. 97


Incidentals


26. 53


Fireproof Cabinets


1740. 39


Calculator


447. 75


$30,271. 01


HIGHWAY DIVISION:


Labor


$97351. 97


Resurfacing


17684. 59


Drains


15241. 47


Street Sweeping


1775. 19


Street Patching


2806. 64


Street Cleaning


159. 27


Sidewalks, Repairs


317. 36


Road Rollers


146. 24


Road Oil and Tar


4943. 50


77


Annual Report


HIGHWAY DIVISION-Cont'd.


Bridges, Fences and Culverts


$ 2142. 45


Crushers


917. 49


Insurance


4565. 33


Signs, Clock and Nos.


192. 75


Snow and Ice


4773. 69


Sidewalks and Curbing


203. 25


Indidentals


54. 74


Phone


379. 07


$153,655. 00


STREET LIGHTING:


$ 37,570. 88


WATER DIVISION:


Maintenance Payroll


$40343. 52


Maintenance Material


1284. 60


New Meters


3124. 45


Services


11037. 98


Main Line Maintenance


1169. 25


Shop and Barn


2127. 87


Maintenance of Buildings


39. 99


Insurance


3321. 85


Taxes


467. 04


Incidentals


31.00


$62,947. 55


W -MAIN LINE EXTENSION


$23,992. 97


SPECIAL MAIN LINE EXTENSION


1,987,43


WATER MAIN LINE EXTENSION


5,425,43


BROOK ST. MAIN LINE EXTENSION


295.50


HUDSON ST. MAIN LINE EXTENSION


2,750.00


PEARL ST. MAIN LINE EXTENSION


564.00


LAKE SHORE DRIVE MAIN LINE EXTENSION


637. 00


PUMPING STATION DIVISION:


Payroll


$18336. 69


Overtime


481. 20


. Fuel


1541. 28


Oil


55. 81


Pumps


280. 14


Boilers


281. 71


Cleaning Filter Beds


765. 36


Care of Equipment, Grounds, and Beds


2520. 80


Phone


118. 37


Incidentals


21. 60


Chemicals


1432. 47


Electric Power and Light


19692. 18


Insurance


765. 60


$46,293. 21


78


Annual Report


SEWER DIVISION:


Filter Beds Repair and Care of Sewers


$9674. 63


280. 44


Treatment Plant - Power and Maint. 4976. 69


$14, 931. 76


Rifle Range


79.21


Bert F. Madden Pension Account


767. 90


Special Labor Account


3632. 50


Emergency Labor Account


2737. 56


Administration-New Equipment


330 .. 00


Purchase of Supt. 's Car w/2 way Radio


2420.00


Equipment Replacement Fund


6392. 35


New Equipment


14478. 70


Chapter 90 - Projects (Pleasant St. )


36. 52


Chapter 90 - Braid Mill Curve


446.22


Chapter 90 - Seven Mile River Bridge


59453. 08


Chapter 90 - Brown St.


3.09


Utilities at New Junior High School


7626.05


Chapter 200 Projects


2783. 00


Sanford St. Parking Lot


1275. 87


Union St. Parking Lot


86.72


Truck Purchase Account


1299. 49


Read St. Drainage Account


672. 81


Hawthorne and Jewell Ave. Drainage


620. 45


Brook St. Drainage


3851. 69


Linden and Palm St. Drainage


694. 88


Sweden Swamp Drainage


69. 54


Sidewalks and Curbing Special Account


32729 27


New Street Signs


1.49


Rubbish Collection Account


60.00


Gasoline Dispensary Account


15086. 66


Repair Division Material


13460. 00


Water Supply Development


5962. 79


Brook St. Sewer Extension


47.50


Hayward Field Entrance Imp.


250.00


Purchase of Truck-Mounted Shovel


7700. 00


Hillcrest Oaks Sewer and Drain Project


18175. 90


Legal Expenses


100.00


Highway Garage Fire Alarm System


105. 88


Installation of Diesel Electrical Set


5511. 69


South Avenue Sewer Extension


89,96


Total $590360. 51


79


COMPARATIVE YEARLY PRECIPITATION REPORT


(Recorded at South Attleboro Pumping Station)


MONTH


Precipi- tation


Snow


Precipi- tation


Snow


1948 Precipi- tation


1949


1950


Precipi- tation


1951 Precipi- tation


Snbw


January


3.63"


7. 75"


2.60"


6.25"


5.13"


35.00"


3.67"


9. 00"


3.38"


3.00"


3.85"


9. 25"


February


3. 47"


11. 25"


0.99"


9.00"


1.95"


14. 50"


2. 73"


12.00"


3.61"


16. 25"


3.30"


12. 75"


April


2. "1"


4. 92"


0.50"


3.68"


5.24"


2. 71"


3.62"


June


3.43"


5. 12"


4.36"


1. 10"


2. 40"


1. 66"


80


August


11. 66"


1.75"


3. 11"


2.27"


5. 37"


3. 60"


October


0. 34"


1. 88"


4. 94"


1.83"


2. 41"


3. 94"


November


0,95"


5. 12"


0.75"


5. 54"


3. 69"


2. 50"


7. 62"


7. 74"


December


1. 52"


1. 97"


3. 18"


22. 25"


1.54"


11.00"


1. 87" 2. 50"


4.06"


3.00"


5.06"


5.00"


TOTAL


37. 77"


21.97"


40.05"


41. 50" 51. 03"


71.00


32. 93/ 34.00"


39.67" 27. 25"


46.52" 31. 50"


March


1. 84"


1. 00"


2. 87"


2. 75"


3.87"


10. 50"


1.45"


8. 00"


3. 01"


5.00"


4. 68"


4. 50"


May


4. 58"


3.83"


9.62"


3.67"


2.43"


4. 98"


July


1. 45"


4. 55"


4. 74"


3.13"


1. 15"


1. 88"


September


2. 19"


3. 24"


2.55"


3. 28"


1. 52"


2. 21"


1946


1947


Snow


Precipi- tation


Snow:


Snow


Annual Report


PUMPING RECORDS - 1951 WATER CONSUMPTION


MONTH


TOTAL GALS.


PER DAY MAXIMUM GALS.


PER DAY MINIMUM GAL.


PER DAY AVERAGE GALS.


January


81,029,000


2,969,000


,1,714, 000


2,613,800


February


75,456,000


3,160,000


1,638,000


2,694,900


March


83,385,000


3,185,000


1,631,000


2,689,800


April


79,966,000


3,227,000


1,508,000


2,665,500


May


85,946,000


3,400,000*


1,599,000


2,772,500


June


77,366,000


3,117,000


1,472,000


2,578,900


July


78,498,000


3,324,000


1,364,000


2,532,200


August


71,516,000


2,960,000


1,304,000


2,306,900


September


65,362,000


2,837,000


1,268,000*


2,178,700


October


72,105,000


2,768,000


1,361,000


2,326,000


November


67,671,000


2,723,000


1,337,000


2,255,700


December


68,107,000


2,760,000


1,326,000


2,197,000


Total ----- 906, 407, 000


* Minimum per year


* Maximum per year


Total for year - 906, 407, 000 gals.


Average for year - 2, 484, 300 gals. per day


Maximum week of year - May 6 - May 12 inclusive; 20, 545, 000 gals.


Maximum day for year - May 9, 1951 - 3, 400, 000 gals. Minimum day for year - Sept. 2, 1951 - 1, 268, 000 gals.


81,


Annual Report


REPORT OF THE HOUSING AUTHORITY 1951


Mayor Cyril K. Brennan Members of the City Council Attleboro, Massachusetts


Gentlemen:


During the year 1951, the Attleboro Housing Authority held twenty regularly scheduled and special meetings. All members of the Authority were present at each of these meetings. 'Mr. Edmund F. Henry, State appointed member of the Authority, whose reappointment came up during the year, requested that owing to business reasons, he be not reappointed. Mrs. Erma P. O'Neil was subsequently appointed by the State to fill the vacancy. The Authority wishes to take this oc- casion to thank Mr. Henry for his very competent assistance, particu- larly in legal matters.


The Authority is now operating two housing Projects: CHAPTER 372-1 Project for Single Houses Under Lease-Sale Agreement to Veteran Occupants


The City of Attleboro, following request of the Authority, has extended the sewer lines of this Project in order that we might eliminate the use of septic tanks which were not operating satisfactorily, and to assist in the drainage of surface water which had plagued this Project since its inception. At this time the extent of improvement has not been determined but it is believed that the surface water in the basements of a substantial number of houses will be eliminated. All of the units have been continuously occupied by the original tenants except in two cases, one veteran returned to active military service, and one veteran moved from Attleboro and built his own home. We believe, and are assured by the State Housing Board that this Project has been operated in a very economical manner. Reference is made to the Annual Financial Report which has been previously submitted to the proper city authorities.


CHAPTER 200-1 Multiple Family Rental Project


During the year the efforts of the Authority have been concentrated on the completion of 93 units under this Project. Many unfortunate delays were experienced and as a result the completion date of the Project will be some fifteen or sixteen months beyond the contractual completion date. Applications from prospective tenants were taken during the summer months and the first three apartments were leased in November. Suf- ficient progress was made in the inside of the buildings so that occupancy was completed during December 1951 and January 1952. Many small de - tails remain to be cleaned up before this Project can be certified by the State Housing Board as finished.


82


Annual Report


On Armistice Day a dedication ceremony was held on the site of this Project. Many state officials including the Chairman of the State Housing Board and Senator, Francis J. O'Neil, Mayor Cyril K. Brennan, Members of the City Council and other city officials were in attendance. Some eight thousand persons went through three of the units which were opened for public inspection. The comments of the visitors and of the press were highly pleasing to the members of the Authority. We wish to express, at this time, our appreciation for the cooperation of the Mayor, and Council and various city officials for assisting us so much in our work in the construction of this Project.


RECOMMENDATIONS


# 1 Surface of the roads within the 372-1 Project have been disturbed materially by the installation of gas mains and sewer lines. It is recom- mended by the Authority that the City accept these streets so that proper attention may be given to their condition.


#2 Application from veterans for occupancy in both of these Projects have far exceeded the number of units available. In addition to that many applications have been made to the Authority from others than veterans. It is the belief of the Authority that a substantial shortage of housing still exists in Attleboro. It is, therefore, our recommendation that serious consideration be given at this time to two possible means of relieving this condition:


-


a. Following conference with the State Housing Board we are informed that an additional Project might be undertaken under Chapter 372 whereby additional single houses for lease-sale to veterans could be built on lots available and owned by the city within the design of the original plan of Hillcrest Oaks, (approximately 40 units. )


b. The Feberal Housing Authorities have set aside funds for the construction in Attleboro of 75 units to provide multiple family homes for occupancy by veterans and non-veterans. It is our belief that a definite need also exists in Attleboro for this type of housing for families now occupying substandard houses. Both of these Projects can be accomplished with very little, if any, expense to the City of Attleboro.


Respectfully submitted,


John E. Turner, Chairman


Leland B. Smith


Leonard I. Lamb


Harold W. MacDonald


Mrs. Francis J. O'Neil Robert E. Blackburn


83


-


Annual Report


REPORT OF CUSTODIAN OF PROPERTY 1951


Honorable Cyril K. Brennan


Mayor of the City of Attleboro, Mass.


Dear Mr. Mayor Brennan:


The function of this office in selling City property acquired by the fore- closure of Tax Titles has been keeping pace with the desires of people buying land for building purposes.


I have been successful in making many sales, advantageously for the City, with the consent of the Honorable Members of the Municipal Council with the ap- proval of the Mayor's office.


Each year I sell many parcels of land which have been non-tax producing and which effectively places them back on the rolls of taxable property and in most instances new valuation inures to the benefit of the City by the buildings placed thereon.


I still have many parcels of desirable land for building purposes; many parcels are added each year by the City Treasurer. My office is open to the public at all times for inquiry regarding same.


I wish to thank the Finance Committee, the Assessor's Office and the Treasurer's Office for their kind assistance in working closely with me in the performance of my duties.


During the year 1951, the following parcels were sold:


Lots 286 & 287 on New Plat 36 -- Evergreen Road -- $ 75.00


200.00


Lot 66 on New Plat 62 -- County Street --


Lots 85 to 92 inclusive -- New Plat 18 -- Rhodes Street --


150.00


Part of lot 1, Assessors Plat 24 off North Avenue -- 420.00


Lots 301 to 303 on New Plat 16 -- Collins Street -- 90.00


Lots 54 & 55 on New Plat 16 -- Turner Street --


200.00


Lot 196 on New Plat 19 -- Sullivan Street -- 75. 00


Lots 98 & 119 on New Plat 3 -- Westminster Street -- 100. 00


Lot 1 -- Evergreen Park -- Park Street -- 75.00


Part of lot 1, Assessors Plat 24 -- Sherman Street -- 50.00


Part of lot 1, Assessors Plat 24 -- off North Avenue -- 350.00


Lots 338-339, 385 & 386 on New Plat 20 -- Scott Street -- 50.00


Lot 38 on New Plat 43 -- Bellevue Avenue -- 100. 00


Lots 186 to 189 on New Plat 44 -- Arthur Avenue --


75.00


Lots 451tto 454 on New Plat 18 -- Clayton Street -- 40.00


Lot 95-A on New Plat 2 -- Lawn Street --


200.00


Lots 71 to 74 on New Plat 66 -- Mawney Street -- 25. 00


200. 00


Lot 96 On New Plat 6 -- Washington Street --


500. 00


Lots 295 to 298 on New Plat 36 -- Evergreen Road -- 200.00


Lots 87-88 on New Plat 66 -- Margin Street -- 15.00


Portion of lot 182 on New Plat 61 -- off Eddy Street -- 650. 00 Lots 354, 355, 356 and 376-377-New Plat 19 -- Owen Street -- 125. 00 5 Acres off Tiffany Street-lot 13 -- Tiffany Street -- 100. 00


Land off Handy Street --


Respectfully submitted,


Henry Rotenberg, Custodian of Property Acquired by the Foreclosure of Tax Titles. 84


Annual Report


REPORT OF CITY AUDITOR 1951


To His Honor the Mayor, and the Municipal Council:


I submit herewith the Annual Report of the Auditing Department.


During the year ending December 31, 1951, the Auditing Department has audited all bills and payrolls presented for pay- ment.


It has also made examination of the accounts of the City Treasurer, the City Clerk, and City Collector all of which have been found correct.


The Trust Funds in the hands of the City Treasurer and Trustees of the Public Library have been examined and found to agree with the report as presented.


The Financial statements, schedules, etc. will be found on the following pages.


Ismay Sharkey,


CITY AUDITOR


85


CITY OF ATTLEBORO SUMMARY OF APPROPRIATIONS - TRANSFERS - RECEIPTS AND EXPENDITURES DECEMBER 31, 1951.


EXPENDED


DEBIT TRANFERS


DEBIT TOTAL


UNEXPENDED BALANCE


CREDIT TOTAL


TRANSFERS RECEIPTS APPROPRIATION


MUNICIPAL COUNCIL SALARIES


Salaries


3,300.00


3,300.00


3,300.00


3,300.00


MUNICIPAL COUNCIL


GENERAL EXPENSES


Incidentals


235.00


235.00


235.00


235.00


MAYOR'S DEPARTMENT


SALARY


3,000.00


3,000.00


3,000.00


3,000.00


MAYOR'S DEPARTMENT CLERICAL


Secretary


Assistant


Penny Milk Administration


150.00


4,395.49


4,395.49


14.51


4,410.00


4,410.00


MAYOR'S DEPARTMENT OTHER EXPENSES


Phone


311.14


Postage


65.00


Office Supnaiss


114.17


Incidentals


9.35


Mayor 's Expenses


1,500.00


1,999.66


1,999.66


5.34


2,005.00


2,005.00


MAYOR'S DEPARTMENT I. B. M. TYPEWRITER PURCHASE Electric Typewriter


550.00


550.00


0.00


550.00


550.00


MAYOR'S FEDERAL RELIEF DIVISION OTHER EXPENSES


81.77


Office Supplies


201.44


Addressograph Maint.


81.98


Mul. .._ graph Supplies & Equip.


524.92


New Multigraph Machine


1,230.00


2,120.11


2,120.11


24.69


2,144.80


2,144.80


AUDITING DEPARTMENT SALARY


Salary


3,200.00


3,200.00


3,200,00


3,200.00


AUDITING DEPARTMENT CLERICAL


2,400.00


EX 2


3,316.40


45.00


3,361.40


118.60


3,480.00


3,480.00


AUDITING DEPARTMENT OTHER EXPENSES


hons


101.77


Office Supplies


362.49


Other Dept . Supplies


143.76


Postage


13.50


Seeking Information


76.30


Incidentals


14.55


New Chair


28 .12


740.49


740.49


1.43


741.92


45.00


56.92


640.00


COLLECTING DEPARTMENT SALARY


Salary


3,200.00


3,200.00


3,200,00


3,200.00


COLLECTING DEPARTMENT CLERICAL


2,400.00


Extra


550.80


2,950.80


2,950.80


25.20


2,976.00


2,976.00


COLLECTING DEPARTMENT OTHER EXPENSES


Phone


84.42


Stationery and Printing


614.20


Tax Sales


118.55


Postage


1,254.12


Bonds


586.50


Incidentala


406.45


3,064.24


3,064.24


.50


3,064.74


4.89


3,059.85


1


Phong


Regular


916.40


Regular


2,400.00 1,845.49


CREDIT


DEPARTMENT


EXPENDED


DEBIT TRANSFERS


DEBIT TOTAL


UNEXPENDED BALANCE


CREDIT TOTAL


CREDIT TRANSFERS


RECEIPTS APPROPRIATION


ASSESSING DEPARTMENT ASSESSORS' SALARIES


Chairman


3,200.00 3,100.00


Clerk Assessor


1,600.00


7,900.00


7,900.00


7,900.00


ASSESSING DEPARTMENT ASSISTANT ASSESSORS' SALARIES


Assistant Assessora' Salaries


708.66


708.66


41.34


750.00


750.00


ASSESSING DEPARTMENT CLERICAL


Regular


2,400.00 2,400.00


Regular


4,800.00


4,800.00


4,800.00


4,800.00


ASSESSING DEPARTMENT OTHER EXPENSES


Phone


104.92


Titles and Transfers


168.45


Office Supplies


499.20


Auto Allowance


162.89


Seeking Information


163.73


Advertising


12.90


ASSESSING DEPARTMENT ADDING MACHINE PURCHASE


Expense


269.50


269.50


269.50


269.50


CITY SOLICITOR SALARY


Salary


1,800.00


1,800.00


1,800.00


1,800.00


CITY SOLICITOR OTHER EXPENSES


250.00


250.00


250.00


250.00


Expenses


TREASURY DEPARTMENT SALARY


3,200.00


3,200.00


3,200.00


3,200.00


TREASURY DEPARTMENT CLERICAL


2,400.00 1,745.95


4,145.95


92.05


4,238.00


4,238.00


TREASURY DEPARTMENT OTHER EXPENSES


Phone


82.89


Office Supplies


271.15


Certifying Tax Notes


215.00


Bonds


285.50


Postage


653.20


Incidentals


61.70


1,569.44


1,569.44


11.06


1,580.50


1,580.50


TREASURY DEPARTMENT RECORDING DEEDS


75.88


75.88


24.12


100.00


100.00


Expense


TREASURY DEPARTMENT COIN COUNTER PURCHASE Coin Counter Purchase


650.00


650.00


650.00


TREASURY DEPARTMENT PREPARATION OF BONDS ACCOUNT


480.00


480.00


480.00


Expense


CITY CLERK'S DEPARTMENT SALARY


Salary


3,200.00


3,200.00


3,200.00


3,200.00


CITY CLERK'S DEPARTMENT CLERICAL


2,400.00


120.00


2,520.00


2,520.00


2,520.00


2,520.00


CITY CLERK'S DEPARTMENT VITAL STATISTICS


Expense


368.25


368.25


1.75


370.00


370.00


1,112.09