Reports of town officers of the town of Attleborough 1952, Part 6

Author: Attleboro (Mass.)
Publication date: 1952
Publisher: The City
Number of Pages: 148


USA > Massachusetts > Bristol County > Attleboro > Reports of town officers of the town of Attleborough 1952 > Part 6


Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).


Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8


In the station proper a chlorine and lime feeder was installed, also an automatic vacuum pump and temperature bearing cuts out on each motor and pump bearing. These controls will cut off the power making this plant semi-automatic inasmuch as it will shut down in case of hot bearings and loss of water in the suction line or a drop in power line voltage but must be restarted manually after checking the cause of the shut down.


This station is operating twenty four hours a day and has given no trouble of consequence since it was started in September. One very serious incident occured, previous to starting the station however, when lightning struck the pole carrying the power wires and followed a wire through the entrance conduit to the fuse cut out switchs on the station wall. The fuses were out at the time thereby probably saving the switch- board and 100 h. p. mrfor but one phase switch of this unit was destroyed and after much delay due to slow delivery was replaced.


Lightning arresters have since been installed by the Mansfield power crew and the entrance conduit and lead in wires have been grounded by a section of salvaged trolley wire to the pump suction line outside the station.


The gravel packed wells supplying the pump were built in 1934 and were designed for a total output of only 400, 000 g. p. d. The pumping rate is now 600, 000g. p. d. and it is intended to gradually increase the amount to around 700, 000 g. p. d. providing daily tests show that the quality remains satisfactory. It is noted that the State Department of Public Health make periodic tests independently of the daily City test to assure water of high quality and make suggestions fron time to time as to rate of lime and chlorine feed. This will vary somewhat at the season of spring or fall flood periods and again at mid- summer. They are always available for con- sultation and appreciation of their many helpful suggestions is herewith acknowledged.


The detail for all station improvements was prepared by Mr. Julian White, water supply consultant, retained by the City, and to him also. do I extend thanks for advice and suggestions which enabled the personel of this Department to do the field work necessary to bring this station up to its present valuable operating condition.


76


Annual Report


It is evident that in the future increasing dependence will be placed upon the Mirimichi Reservoir and the Wading River outfall from this lake as a source for a portion of the additional municipal water supply with increasing demand each year.


The City of Attleboro actually owns only the flooded area up to the high water mark, which is identified by a specific elevation established by a Legislative Act of 1923, except for a small land area adjacent to the dam and spillway.


The number of summer cottages around the lake has increased considerably due to the development of a new plat of lots at the north end of the lake. The sanitary requirement of these dwellings are served by cess pools or septic tanks with the effluent, of course, ultimately reaching the water of the lake.


Unfortunately, the State Department of Public Health does not recognize Lake Mirimichi as being a municipal water supply but is a compensating reservoir only, for supplying the needs of industries down stream having water rights in the Wading River, therefor the above Department is not con- cerned with possible pollution of the water in said lake, which it is under - stood of course, ultimately reaches the filter bed area at the Wading River Pumping station.


It must be understood that this surface water is thoroughly filtered through the gravel of the filter bed and it must pass also through the gravel in the specially constructed wells before entering the suction line to the station pump.


It is the intent of this phase of the report to direct attention to the fact that an increasing number of summer residences are being built on the shore of Lake Mirimichi, obviously requiring sanitary conveniences. The City of Attleboro through the Superintendent of this Department is at present powerless to require the owners to construct adequate installation for the proper treatment of sewage or to take any steps whatever to guard against lake water pollution.


I recommend that a study be made by a person or group duly authorized by the City of Attleboro to consider the following points or to change or add to the same as suggested as the investigation progresses.


1. Endeavor to have the Mass. State Dept. of Public Health recognize Lake Mirimichi as a public water supply for the City of Attleboro and set up rules and regulations accordingly to minimize pollution.


2. The City of Attleboro should acquire all presently vacant land to a distance of one hundred feet parallel to and above the maximum allowable flowage elevation around the lake.


77


-


Annual Report


3. Require prospective builders to petition the Honorable Municipal Council, with plans for the building and details of proposed sewage treatment, also request permission to build on said land of land adjacent there for a small yearly fee at a location designated by said Council.


4. Enact such local legislation or otherwise to require all the present owners to present plans showing how their sanitary disposal systems shall be improved or changed to guard against lake water pollution and designate some authority to see that the improvements or changes are carried to completion.


The designated authority must be allowed to enter upon any private pro- perty at reasonable times in the performance of his inspection duty without be- ing guilty of trespass.


This Department does not presume to suggest any legal processes or other means toward the adoption of the above or added regulations around Lake Miri- : : michi but does most sincerely recommend a thorough study without further delay for the protection of the water users of the City of Attleboro and to safeguard the quality of this most important and increasing source of water supply.


The usual construction of gravel penetration of streets newly accepted was carried on as well as surface treatment by asphalt and sand cover in many separate areas.


Brown St. from Washington Street to within five hundred feet of Leedham St. constructed with a hot mixed top on a gravel base was a major accomplishment under a Chapter 90 schedule. It is expected to complete this street to the Cumberland town line in 1953.


South Main Street between Park and Mill Streets was also resurfaced with bituminous concrete resulting in a very smooth riding pavement ..


The gross mileage for new construction and resurfacing is 4. 0 which adds greatly to the total mileage for routine maintenance.


Experience of the past several years indicates positively that the conventional method of street construction consisting of a gravel base treated with two applications of asphalt does not create a wearing surface of sufficient depth to endure under the grinding effect of modern traffic. To build a more substantial pavement at a less cost than the usual pene - tration type, the street excavation and gravel refill treated with asphalt was continued but the grade was left two and one half inches low. This was done on several streets carrying varied traffic loads.


A unit called a Moto Paver which mixes and spreads to a uniform depth a mix of asphalt and properly graded aggregate, was hired for several days to mix and spread the top wearing surface of two and one half inches which was then rolled to the finished crown and grader and later sealed with a light coat of asphaltic oil and fine stone.


78


Annual Report


The streets so constructed are Thacher St. , Prairie Avenue to the Railroad bridge, Snell Street, East Street at the Briggs Playground and Hazelwood Avenue.


This Department is now erecting a gravel screening plant at the West St. crusher location which will separate all stone over one inch in diameter. This is fed directly to the crusher which reduces it to a size useful for the base stone of a penetration type pavement. The remaining well graded small stone and gravel is conveyed to a stock pile. This is the material it is proposed to use in the future and to more or less specialize in this type of pavement for secondary and residential streets particularly, although by varying the amount of maximum sized stone a surface can be mixed and placed that will carry any reasonable traffic load.


Whereas the cost for hiring a mixer as explained is prohibitive, it is hoped that perhaps next year a unit can be purchased by the Department for this advance type of construction and with City material available the pavement cost can be brought within budget figures and our necessarily gravel construction schedule could be carried out to best advantage by having a paving machine available when required.


Surface drain installations were completed mostly in areas required by new street construction. The drainage on old streets, so called, is generally satisfactory, however a district badly needing relief is that area bounded by County Square, Thacher St. and Fisher St. This has been recommended regularly each year.


A second area is at the intersection of Linden, Cherry and Palm Sts. A relieving pipe line could be carried down Linden, Alder and Fisher St. to Prosperity Lake draining the several intersections passed through by this route.


A major installation of 21" inch drain out fall pipe was placed from Brown St. southerly towards Lee's Pond on the South End Playground. This line was required by the Brown St. Ch. 90 construction and will be com- pleted in 1953.


Several small sewer extensions were completed after petition and approval, all were routine jobs and were required by new construction or in the case of Prince St., the subsurface material would no longer accept the effluent from residential septic tanks. A new basis of sewer ex- tension assessments should be worked up since the 1913 rates are still being used.


It is interesting to note that trenching was carried on throughout the winter with only a few weeks of snow and frozen ground interfering.


Water main extensions required by new housing was a major accomplish- ment with new services and routine water Department maintenance account- ing for a very busy season.


79


Annual Report


Delivery of cast iron pipe and hydrants is very slow.


The 450 H. P. Diesel engine and generator for the West St. Pumping station has been ordered with the switchboard and all electrical equipment also.


The new 4 million gallon per day pump is also on order with a tentative delivery date of June or July 1953 for all materials.


The Wading River Station is operating at a 700, 000 gallon per day rate with very little trouble.


The City is extremely fortunate to have this supply and the available pumping volume should be increased at once by additional wells to utilize the capacity of the 1. 5 m. gal. pump and thereby relieve the pumping load on the West St. station.


It is the intent of the New Haven Railroad to make extensive repairs to the steel work and replace all timbers on the Olive St. bridge in 1953; therefore a very minimum of deck maintenance is done at present since the City must lay a new deck after completion of railroad repairs.


Cliff St. bridge is a problem to maintain. The timbers are in poor condition and it is apparent that a new bridge will not be constructed until River bank Road is extended and built. All other bridges are in very good condition. The Deanville Road bridge over the Ten Mile River should be widened to forty feet, requiring a short piece of street relo- cation.


The extensive sidewalk and curbing construction by contract was com- pleted and this type of improvement not only adds considerably to the appearance of adjacent properties but makes sidewalk and pavement shoulder maintenance more effective.


All guard fences are now constructed of steal cable with concrete posts and barring damage by vehicle will last indefinitely.


Concrete pipe has been used to replace several old metal culverts which results in long life and requires only routine cleaning each season.


RECOMMENDATION FOR 1953


This Department feels duty bound to include all the recommendation listed in the 1951 report even at the risk of being accused of tiresome repetition since all then enumerated were pertinent to the general welfare of the community and all must ultimately be seriously considered. They are included herewith:


Additional 1. 5 million gallon standpipe or 3 million gallon low head reservoir.


80


Annual Report


Repair present standpipe immediately.


Increase capacity of Wading River station by additional wells.


Build new dam above station at Blakes Pond and a low dam above the site of the old Knife Works Mill on Williams St .; Mansfield which would hold back water in the Robinson Pond also


Purchase land for water reservoir on the Seven Mile River west of Washington St. and also on same river west of Orr's Pond Station. Land around Manchesters Pond should also be purchased.


A schedule of old water main cleaning should be set up and carried forward each year particularly in the Park, N. Main and Pleasant St. areas.


Small four inch mains in the industrial area on the East side must ultimately be replaced preferably with eight inch pipe.


The elimination of dead end mains by connecting extensions thereby saving water now wasted by bleeders should also be given consideration.


In all cases wherever reasonably possible extensions should be made which will complete a loop of supply main and new work should be evaluated accordingly.


HIGHWAY DEPARTMENT


Add to present Wall St. garage for live storage and Water Department equipment or develop a new building and yard at another location.


Purchase new twelve ton tandem roller.


Two sidewalk tractors for snow plowing.


Truck with hydraulic hoist for handling water pipe in trenches and all load hoisting.


Mechanical drain and sewer pipe line cleaning machine for routine maintenance of same.


Vacuum leaf loader and truck body for removal of fallen leaves.


Machine for mixing street surface material for more durable pavement as explained under general remarks.


Again County St. from Read St. to the end of the 1951 construction under Ch, 90 agreement should be considered for relocation and construc - tion.


81


Annual Report


Mill Street and So. Main St. adjacent to the Railroad station should be repaved with a hot top surface similar to S. Main St. northerly to Park St.


No. Main St. , Sanford to Dean St. should be similarly improved.


Sanford St. between Bank and No. Main should be widened in general conforming to the plans long on file in this Department. The volume of traffic using the parking lot plus the proposed change in zoning from residential to business warrants this consideration.


SANITARY SEWERS:


The proposed sewer extension from the Ten Mile River Trunk line to serve that area north of Thacher St. and east of the railroad extending to County Square cannot be ignored much longer as this area is developing rapidly.


SURFACE DRAINS:


A surface drain system generally parallel to the above recommended sewer to serve the same area isagain mentioned as the surface water runoff becomes more rapid with each street improvement with consequent gutter erosion and added maintenance as well as flooding of yards.


Attention must be given to drainage conditions on the Leach Plat, so called as this section is developing steadily and water is becoming a problem.


Pine Road, Washington St. to Robinson Avenue should be servicedc by basins and the necessary pipe line; also Robinson Avenue east of Mendon Road.


This Department will appreciate any suggestion or constructive criticism from whatever source that will tend to improve the service to the public that we are obliged to furnish.


Thanks is extended to all City Department Heads, particularly Chief Marron of the Police Department and Chief Mowry of the Fire Department, Mayor Brennan, all Members fo the Municipal Council, all citizens who offered timely suggestions and especially to all personel of this Department, without whose cooperation and support the accomplishments of this year would have been impossible.


Respectfully submitted,


Russell F. Tennant Superintendent Public Works


82


Annual Report


1952 - NEW CONSTRUCTION


No. of feet


Dewey Avenue


North Main St.


Westerly


700


Sheffield Road


North Main St.


Westerly


564


Warren Road


Daggett Road


Sheffield Road


450


Daggett Road


North Main St.


Westerly


430


George Ide Drive


Capt. Courtois Drive


Westerly & Northerly


1438


Capt. Courtois Drive


County St.


Westerly


1116


Intervale Road


Thacher St.


Thirteenth St.


580


Chester Street


South Main St.


Ten Mile River


450


Westwood Park Cir.


Towne House Road


Easterly


1100


Towne House Road


Clifton Street


Westwood Park Cir.


600


Woodcock Lane


Towne House Road


Notherly


225


John William St.


Thacher St.


Summer St.


1470


Curtis Avenue


Washington St.


Easterly


1222


Gardner Avenue


Pine Road


Brown St.


1330


Fonetneau Avenue


South Main St.


Westerly


232


Rocky Terrace


Patterson St


Easterly


317


Patterson Street


South Avenue


Southerly


606


Rand Avenue


Brown Street


Northerly


1120


Hood Street


North Avenue


Easterly


675


Brown Street


Sta 66 - 38. 16


Sta 19 - 00. 00


4738


19363


1952 - RESURFACING


Riverside Avenue


Spring Street


Chester St. 250


Snell Street


South Avenue


Southerly 254


Hazelwood Ave.


No. Main


Easterly


400


County St.


No. Main


Southerly


1100


Pleasant St.


Gustin to R. R.


1500


Cumberland Ave.


Newport Ave. to Rt. 1


2400


Union Road


Pike Ave. to City Line


4400


Benefit St.


Peck St. to Leroy St.


350


10654


ROAD OIL (SEAL)


Pike Avenue


4000 ft.


Read Street


6000 ft.


Steere Street


3000 ft.


Cherry Street


900 ft.


Oakhill Avenue


2000 ft.


Linden Street


1200 ft.


Orange Street


1000 ft.


Prairie Avenue


900 ft.


Bishop Street


4000 ft.


Alden Street


800 ft.


Parker Street 400 ft.


Ottawa Street


400 ft.


Mulberry Street


1000 ft.


Dale Avenue


500 ft.


Pearl Street


600 ft.


Fisher Street


700 ft


James Street


700 ft.


Bellmore Street


400 ft


Wilmarth Street


3000 ft.


31500 ft.


83


Annual Report


DRAINAGE PIPE LINE CONSTRUCTION - 1952


Catch Basins


Man Holes


8"


10"


12"


15"


24"


Hudson St. & Belair Ave.


4


336"


Gardner Ave. to Lee's Pond


6


4


26'


413'


352'


116. 5'


So. Main St. So. of Thurber Ave.


3


325'


Patterson St.


5


24


241'


80'


George Ide Drive


2


1


355'


Woodcock Lane


5


85'


345'


Pleasant St. thru Fisher Prop. (Replacing old culvert)


Steere St. at Pike Ave.


1


50'


Sturdy St. at Ashley's


1


40'


Sheffield at Warren Road


1


Curtis Avenue


2


130'


South Avenue at Prescott St.


1


31


7


24


1503'


746'


697'


116.5


GRANOLITHIC SIDEWALKS & GRANITE CURB - 1952


Contractor - Delpape Brothers


Granolithic Sidewalks


2156. 9 yds.


Granolithic Drives


342.2 yds.


Granite Curbing


4144. 4 ft.


Granite Curbing Reset


366. 4


ft.


Granite Driveway Corners


78


Circular Granite Curbing


89.4 ft.


BRIDGES, FENCES AND CULVERTS - 1952


Cable Fence


County St. Mechanic St. 280 feet 30 concrete posts


Bridge Redecking


Holden St. - Major repairs to steel work done by Railroad 3"x2"x11/2" asphalt deck by City.


Read St. over Seven Mile River. Old wood bridge replaced by three 28 feet long 60 inch concrete pipe with sone masonry head walls.


84


2


168'


-


240 feet 26 concrete posts


Annual Report


SNOW FENCE - 1952


Location of snow fence erected each fall.


Brown St.


700


ft.


Highalnd Avenue


1400


ft.


Read St.


700


ft.


County St.


1000


ft.


Oak Hill Ave.


400


ft.


Handy St.


300


ft.


Wilmarth St.


200


ft.


Steere St.


100


ft.


Park St.


200


ft.


West St.


300


ft.


Commonwealth ave.


400


ft.


Locust St.


800


ft.


6500


ft.


SEWER CONSTRUCTIONS - 1952


6" Pipe


8" Pipe


Manholes


Eddy Street


Garfislo Avenue


247


1


John William Street


260


1


Prince Street


248


1


Rocky Terrace


270


1


South Avenue


736


3


1266


998


9


Total Additions To Sewer System - 2264 ft. (. 43 miles) Total Miles of Sewer 12/31/52 - 41. 48 miles


SEWER CONNECTIONS - 1952


Total Connections: Jan. 1, 1952 - 2257 Buildings Served - 2469


Connections Added during 1952 - 39


39


Totals 2296 2508


STREET LIGHTING - 1952


Number and kind of lights in use December 31, 1952.


1000 C. P. - 59 - $79 00 each yr. - Sunset to 11:30 P. M. 1000 C. P. - 34 - 95.00


= - All night lights


1000 C. P. - U /G-1-75. 00 11


11 11 light 600 C, P. - 40 - 5. 416 11


mo 11 lights


250 C P. - 140- 2 333 11 100 C. P. - 1317 - 1.50 11


11


11 1 1


503


2


85


Annuel Repor


NEW SERVICES - 1952


LENGTH


SIZE


NUMBER


IN BEET


-


4 inch


157


$964'7"


$10321 40


1


3


4031


395 11


1


521


121. 78


11/2"


128'


319 32


2


2


99'6"


420. 50


1


201


242 52 (FIRE SERVICE)


TOTALS


149


966711"


$11820. 63


SERVICE REPLACEMENTS 1952


LENGTH


TOTAL


BIZE


NUMBER


IN FEET


COST


74 inch


25


657'


$1195 86


HYDRANTS


T ob! Number of Hydrants 12/31/52 - 911


WATER MAIN LINE EXTENSIONS : 1952


HYDRANTS 6


Pipe 8" Pipe


1G" I pe


142 8


54


Pico Street


194 9


Latter avenue & Arnold Street


2


535 1


pomme LAne


1


:57 5


Hwwww.mb Ave. & Miriam Drive


2


749.7


(Tm) replaces 370 ft


11/2' pipe)


Warmen Road


77


John Williams Street


400


( Tls replaces 217 5ft


11/2" pipe)


Work Circle


1 203


E' sher Street


109


Fern Street


240 9


Stare Lane


128


Eddy Sirect


1


659 7


This replaces 125 ft 1 /4" pipe)


Hand Avenue


1


220 6


Washer Street


100. 9


Br nin Street


2


2


Bayberry Hill Road


1


239.5


Patterson Street


228. 5


Mon Strect


1


741 ..


86


1019.5


TOTAL COST


Annual Report


Water Main Line Extensions - (Cont'd)


Hydrants 6" Pipe 180.


8" Pipe 10" Pipe


Longfellow & East Bacon Street


Oak Hill Avenue


127. 8


Dewey Avenue


144.5


Walnut Street


213. 3


Rocklawn Avenue


492.8


Park Circle & Park Drive


176. 8


Tyson Place


Total


15


7617. 8


1533. 8


619. 4


EXPENDITURES - 1952 - PUBLIC WORKS DEPARTMENT


Charges to December 31, 1952


General Administration:


Superintendent's Salary


$4800. 00


Asst. Engineers Salaries, etc.


13635. 08


Clerical Labor


7611. 96


Engineering Suplies


371. 84


Office Supplies


224. 47


Insurance


52. 40


Telephone


193. 04


Incidentals


25.00


Calculator Purchase


697. 50


New Adding Machine


218. 30


New Filing Cabinet


50 .. 45


$27, 880. 04


Highway Division:


Labor


107,100. 82


Resurfacing


25,839. 77


Drains


8,979.93


Street Sweeping


1,432. 90


Street Patching


6,546.24


Street Cleaning


235,00


Road Rollers


67.09


Road Oil & Tar


2,474. 89


Bridges, Fences & Culverts


4,846.42


Crushers


2,631. 23


Insurance


3,880. 68


Signs, Clock & Numbers


708. 46


Snow & Ice


3,971. 73


Incidentals


55. 01


Phones


540. 33


$169,310. 50


379. 9


87


Annual Report


Street Lighting:


$38.075. 51


Water Division:


Maintenance Payroll


36,333. 51


Maintenance Material


691. 36


New Meters


6,586.33


Services


10,662.06


Main Line Maint.


832.00


Shop & Barn


2,183. 14


Maint. of Buildings


50.00


Insurance


3,807.37


Taxes


497. 71


Incidentals


36.62


$ 61,680. 10


Water Main Line Extension:


$ 2,300.00


Speci al Main Line Extension:


$25,458. 26


Replacement of Olive St. Main Linc:


$ 6,136.18


Pumping Station Division:


Payroll


$18,093. 92


Overtime


546. 96


Fuel


1,850. 82


Oil


8. 71


Pumps


544. 25


Boilers


257. 13


Cleaning Filter Beds


603. 98


Care of Equip., Grounds & Beds


1,431. 31


Phone


310. 20


Incidentals


108.99


Chemicals


2,364. 71


Elec. Power & Light


26,137. 90


Insurance - Pumping Equip.


1,229.80


$53,497. 68


Sewer Division:


Filter Beds


9,969.47


Repair and Care of Sewers


4. 17


Treatment Plant-Power & Maint. 4,269. 16


$14, 242. 80


Emergency Labor Account


1,874.65


Special Labor Account


1,746.00


Hillcrest Oaks Sewer & Drain Project


2,782. 79


Chapter 200 Projects


9,586.01


Utilities at New Junior High School


291. 51


Chapter 90-Brown St.


.59,610.06


Chapter 90ยท Projects (Pleasant St. )


193. 60


Career 90-Braid Mill Curve


499. 90


88


Annual Report


Chapter 90-Seven Mile River Bridge


254. 76


Equipment Replacement Fund


3,994. 20


New Equipment


1,834 02


Sanford St. Parking Lot


407. 59


Union St Parking Lot


144.67


So. Main St. Retaining Wall


333. 05


So. Main St. Fence


55.00


New Street Signs


47. 30


Rubbish Collection Account


800.00


Sidewalks & Curbing Special Account


28,122. 70


Gasoline Dispensary Account


15,921. 15


Repair Division - Material


15,506.50


Bert F. Madden Pension Account


869. 64


George Doucette Pension Account


1,095. 75


Installation of Deisel Electrical Set


11,122. 23


West Mansfield Power Line


3,237.70


Water Supply Development


3,091. 21


South Avenue Sewer Extension


1,273. 82


Rifle Range


194. 82


John William St. Sewer Extension


310.00


Brown St. Reconstruction


16,419. 18


Parking Lots Line Painting Account


700. 00


Shovel Repair Arcount


4,360. 00


Sewer Extensions


1,074.09


Cost of Living Bonus


6,205. 00


Hoppin Hill Diversion Dams


148. 52


Total


$592,688. 49


PUMPING RECORDS - 1952


WATER CONSUMPTION


Per Day


Per Day


Per Day Ave. Gals:


January


73,720,000


2,774,000


1, 414, 000


2,378,100


February


71,340,000


2,819,000


1,537,000


2,460,000


March


76,292,000


2.841, 000


1,601,000


2,461,000


April


72, 765,000


2,814.000


1,334,000


2,425,500


May


71,290,000


2,865,000


1,341,000


2,299,700


June


76,382,000


3,792,000


1,337,000


2,546,100


July


91.924,800


3,966,600


1,872,000


2,965,300


August


75, 906,500


3,399, 000


807,000*


2,448,600


September


90,941 000


4.185,000 **


1,617,000


3,031,400


October


89 056.200


3,400.000


1,616,000


2,872,800


November


82,875, 000


3,328,000


1,684,000


2,762,500


December


84,428,000


3,349,000


1,671,000


2,723,500


Total


956, 920, 500




Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.