Town annual report of the officers of Wakefield Massachusetts : including the vital statistics for the year 1934, Part 8

Author: Wakefield, Massachusetts
Publication date: 1934
Publisher: Town of Wakefield
Number of Pages: 290


USA > Massachusetts > Middlesex County > Wakefield > Town annual report of the officers of Wakefield Massachusetts : including the vital statistics for the year 1934 > Part 8


Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).


Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15


SEWER CONNECTIONS


Applications for house connections to date 1760


Number of connections made 1650


Number of connections made during year 31


Number of connections waiting 0


SEWER CONSTRUCTION


An eight-inch sewer was constructed in Broadway from Station 6+59" westerly 180 feet to Station 8+39.


An eight-inch sewer was laid in Vernon Street from Aborn Avenue. northerly to Cordis Street; also, in Cordis Street from Vernon Street: westerly to Pleasant Street.


In conclusion, I wish to extend my sincere thanks to each and every member of the department for his co-operation in all emergencies during: the year.


I also extend my thanks to the heads and members of the various Town: Departments for their support and co-operation during the year.


Respectfully submitted,


MORRISON MERRILL,


Superintendent.


107


REPORT OF MUNICIPAL LIGHT BOARD


Report of the Municipal Light Board


To the Citizens of the Town of Wakefield:


We submit for your consideration the forty-first annual report of the Municipal Light Board covering the year ending December 31, 1934.


The operations of the Department resulted in a net profit, after deducting debt retirements, of $35,371.43 as compared to a profit of $22,- 276.57 for 1933. The past year has been the most satisfactory year since 1931.


The results obtained from the Gas Department have been more satisfactory than anticipated. The net sales were $115,976.13 for 1934 and $116,747.78 in 1933.


The net sales of the Electric Department were $189,685.64 for 1934, and $180,378.29 for 1933, the gain over 1933 being due to increased use by domestic and commercial lighting consumers. The total kilowatt hours sold by the department has increased steadily for a number of years as. shown below :-


1928


3,623,400 K. W. H.'S


1929


4,116,300


66


1930


4,302,700


1931


4,432,900


1932


4,379,900


66


1933


4,732,000


66


1934


4,940,400


66


The income of the department has not increased in the same pro- portion due to several substantial rate reductions over the same period .. For example, the net rate paid by domestic consumers in 1928 was 61/2 cents per kilowatt hour and in 1934 the average net rate paid by the. same class of consumer was 4.59 cents per kilowatt hour, a reduction of nearly 2 cents per kilowatt hour. ,


During the past year we furnished the Town with street lights for $18,000.00, but in view of the fact that the department turned over to the Town $16,500.00, this service cost the taxpayer only $1,500.00.


The balance in our Operating Fund is $45,600.85, as compared to $16,526.57 in 1933. The increase is due to increased sales, reduced ex- penditures, and an improvement in the collection of our accounts.


The report of the Manager showing the financial condition of the plant as of December 31, 1934, and its operations for the year, is in- cluded in this report.


108


TOWN OF WAKEFIELD


The books of the Department are being audited by C. O. Huntington & Company, Certified Public Accountants.


Respectfully submitted,


MARCUS BEEBE, 2nd, Chairman, A. FRANCIS HARRINGTON, Secretary, CURTIS L. SOPHER,


Board of Commissioners,


Municipal Light Department.


January 15, 1935.


To the Board of Light Commissioners,


Town of Wakefield, Massachusetts.


Gentlemen:


I submit herewith my annual report of this Department for the year ending December 31, 1934.


GAS DEPARTMENT


The net sales of this section were $115,976.13, the operating expense $105,140.96 and a net income of $8,742.65 for 1934. In 1933 the net income was $7,304.98.


ELECTRIC DEPARTMENT


The net sales of this section were $189,685.64, the operating expense $148,426.52, with a net income for 1934 of $36,628.78. In 1933 this amounted to $27,471.59.


BONDED DEBT


This account has been reduced from $99,000.00 on January 1, 1934, to $89,000.00 as of January 1, 1935.


PROPERTY AND EQUIPMENT


On account of the small amount of construction throughout the year, the Plant investments and general equipment values have decreased $8,062.42 due to depreciation.


The resurfacing of Main Street between Bennett Street and Water Street necessitated changes and replacements in both gas and electric underground structures; an old 4" cast iron gas main replaced by a 6" steel pipe.


The street lights on trolley poles which were owned by the Town, were replaced in the lower section, that is from the High School to Bennett Street, with the standardized ornamental light poles; outlets have been placed along the remaining section to accomplish the same installation sometime in the future, so that the lighting of this section will conform with the lighting in other sections of the town.


The block of stores at the corner of Main and Water Streets have been supplied with a makeshift installation for many years and it has proved very unsatisfactory, both for the occupants and the Department.


109


REPORT OF MUNICIPAL LIGHT BOARD


To remedy this and complete underground construction on the section of Main Street mentioned above, a duct line was laid in the sidewalk from the transformer manhole opposite the Armory to a point in a driveway entrance in rear of these stores and to the Evans' Son Company shoe factory. The transformer bank at the Evans Company was placed in a brick structure and changes made so that there is ample protection for all parties concerned.


Many replacements in numerous places were made in gas mains on account of small sizes and increased demand, and for defective sections in very old lines. An old 2" line in White Avenue was replaced with 3" steel pipe; 500 ft. of old 2" and 3" cast iron pipe in Lawrence Street was replaced with 4" steel pipe; 900 ft. of 2" cast iron pipe in Traverse Street replaced with 3" steel pipe. Crescent Street, between Main and Water Streets, 1500 ft. of old out of line defective pipe was replaced with steel pipe. Some 850 feet of small mains were abandoned and new service connections to larger pipe made. Only 300 ft. of extension has been made during the year.


Five drip tanks used in the past on the high pressure lines were recovered and some used for other purposes at the plant.


Approximately 300 lead connections to gas meters have been changed to solid connections with fire valves, and upward of 500 meters removed and tested for obsolescence.


A number of extra men were given employment in scraping, red- leading and painting the gas holder, on top of which has been placed the word WAKEFIELD as a guide to aviators.


The policy of the Department in advancing the service has been continued, noticeably in the extension of 3-wire secondaries in aerial construction where the increase in the load has seemed to warrant the same.


The pole lines have been inspected twice a year, as has been the custom in the past, and replacements made wherever warranted.


The financial statement follows:


110


TOWN OF WAKEFIELD


BALANCE SHEET AS OF DECEMBER 31, 1934 ASSETS


.


PLANT INVESTMENTS


Gas Department (Schedule A)


$366,212.11


Electric Department (Schedule B)


343,420.16


General Equipment (Schedule C)


11,801.18


Total Investments


$721,433.45


CURRENT ASSETS


Operation Fund


$ 45,600.85


Depreciation Fund


56,091.69


Office Fund


400.00


Special Deposits


31,939.58


Accounts Receivable


24,622.64


Materials and Supplies


21,563.85


Total Current Assets


$180,218.61


PREPAID INSURANCE


336.86


DEFERRED CHARGES


2.41


TOTAL ASSETS


$901,991.33


REPORT OF MUNICIPAL LIGHT BOARD


111


BALANCE SHEET AS OF DECEMBER 31, 1934 LIABILITIES AND SURPLUS


BONDS PAYABLE


$ 89,000.00


CURRENT LIABILITIES


Accounts Payable


$


2,433.97


Consumers' Deposits


31,939.58


Matured Interest


1,150.50


Total Current Liabilities 35,524.05


ACCRUED LIABILITIES


Interest on Bonds


1,288.60


APPROPRIATIONS FOR CONSTRUCTION


10,907.42


APPROPRIATED SURPLUS


Loans Repayments


384,300.00


Appropriation for Construction Repayment


40,322.80


424,622.80


340,648.46


SURPLUS (Schedule D)


TOTAL LIABILITIES AND SURPLUS


$901,991.33


112


TOWN OF WAKEFIELD


STATEMENT OF INCOME AND EXPENSE GAS DEPARTMENT


INCOME FROM SALE OF GAS


Regular Meters


$112,632.32


Prepay Meters


2,677.40


Municipal Meters


515.78


Minimum Bills


150.63


Total Sales


$115,976.13


DEDUCT - OPERATING EXPENSES


Gas Purchased


$ 50,695.80


Transmission and Distribution


24,656.20


Commercial


7,954.39


New Business


393.39


General


9,930.88


Depreciation


11,510.30


Total Operating Expense


$105,140.96


OPERATING INCOME


$ 10,835.17


ADD - OTHER INCOME


Merchandise and Jobbing


$ 28.02


Interest on Bank Balances


476.98


$ 505.00


GROSS INCOME


$ 11,340.17


DEDUCT OTHER EXPENSE


Interest on Bonds


$ 962.18


Interest on Consumers' Deposits


605.22


Bad Debts


1,030.12


$ 2,597.52


NET INCOME TO SURPLUS (Schedule D)


$ 8,742.65


113


REPORT OF MUNICIPAL LIGHT BOARD


ELECTRIC DEPARTMENT


INCOME FROM THE SALE OF ELECTRICITY


Commercial Lighting


$124,700.64


Commercial Power


34,985.35


Municipal Power


7,934.97


Municipal Lighting


3,702.37


Street Lighting


18,000.00


Minimum Bills


362.31


Total Sales


$189,685.64


DEDUCT - OPERATING EXPENSE


Energy Purchased


$ 72,602.90


Transmission and Distribution


24,270.51


Utilization


6,400.73


Commercial


7,927.28


New Business


409.49


General


9,599.03


Depreciation


27,216.58


Total Operating Expense


$148,426.52


OPERATING INCOME


$ 41,259.12


ADD - OTHER INCOME


$ 35.16


Merchandise and Jobbing Interest on Bank Balances


476.98


$ 512.14


GROSS INCOME


$ 41,771.26


DEDUCT - OTHER EXPENSE


Interest on Bonds


$ 2,884.77


Interest on Consumers' Deposits


589.00


Bad Debts


1,668.71


$ 5,142.48


$ 36,628.78


114


TOWN OF WAKEFIELD


PLANT INVESTMENTS GAS DEPARTMENT - SCHEDULE A


Land


$ 6,591.75


Structures


23,784.33


Boiler Plant Equipment


2,181.49


Engines


6,355.62


Miscellaneous Power Plant Equipment


2,113.66


Street Mains


268,153.34


Services


24,084.80


Meters


25,584.77


Meter Installations


7,362.35


Total per Balance Sheet


$366,212.11


ELECTRIC DEPARTMENT - SCHEDULE B


Land


$ 213.57


Structures


20,728.78


Substation Equipment


27,403.71


Poles, Fixtures and Overhead Construction


79,645.30


Underground Conduits


101,251.69


Underground Conductors


35,109.57


Meters


22,980.00


Meter Installations


3,136.76


Transformers


24,867.11


Transformer Installations


1,818.09


Street Lighting


26,265.58


Total per Balance Sheet


$343,420.16


GENERAL EQUIPMENT - SCHEDULE C


Office Furniture and Equipment


$ 2,720.22


Automobiles


2,487.60


Laboratory Equipment


555.25


Miscellaneous Equipment


6,038.11


Total per Balance Sheet


$ 11,801.18


REPORT OF MUNICIPAL LIGHT BOARD


115


SURPLUS AS OF DECEMBER 31, 1934 - SCHEDULE D CREDITS


Balance, January 1, 1934


$322,854.05


Profit from Electric Operations


36,628.78


Profit from Gas Operations


8,742.65


Total Credits


$368,225.48


DEBITS


Bonds Retired


$ 10,000.00


Property Abandoned


1,077.02


Returned to Town


16,500.00


Total Debits


$ 27,577.02


Balance, December 31, 1934, per Balance Sheet


$340,648.46


COST OF GAS


Cost of Gas in Holder


$ 50,695.80


Cost of Gas in Holder - per M. C. F.


$0.5866


Average Cost of Gas Delivered - per M. cu. ft.


$1.4000


Total Gas Purchased - cubic feet


86,408,327


Total Gas Sold - cubic feet


77,007,200


COST OF ELECTRICITY


Cost of Electricity on Switchboard


$ 72,602.90


Cost of Electricity on Switchboard - per kilowatt hour


$0.01336


Average Cost of Electricity Delivered - per K. W. Hr.


$0.03010


Total Electricity Purchased - K. W. Hr.


5,444,451


Total Electricity Sold - K. W. Hr.


4,940,412


NEW CONSTRUCTION - GAS


Street Mains (feet)


7,438


Services


38


Meters


212


Meters in use beginning of year


3,610


Meters in use end of year


3,611


116


TOWN OF WAKEFIELD


NEW CONSTRUCTION - ELECTRICITY


Street Lights


29


Transformers


7


Poles


5


=


Overhead Lines (feet)


50,148


Services


21


Ducts - Steel (feet)


4,760


Meters


25


Meters in use beginning of year


4,360


Meters in use end of year


4,456


I again wish to thank the Commissioners, the general public and the employees of this Department for their continued support and loyalty.


Yours respectfully,


SAMUEL H. BROOKS,


Manager.


Fire Alarm and Police Signal System


January 2, 1935.


To the Municipal Light Commissioners,


Town of Wakefield, Massachusetts.


Gentlemen:


These functions of the Light Department have been kept up in good working condition, very little has had to be done in the way of minor repairs.


The lines are in first class order, batteries and charging devices under constant supervision. The police are in constant communication with the State Police through the radio connection.


The major work has been the construction of a fireproof room in basement of the Central Fire Station, anticipating the purchase and in- stallation of a new switchboard and a ten-circuit repeater. This change is recommended on account of the continued extension on the present circuits and the battery increases necessary to operate and the limitation of the present five-circuit repeater.


Respectfully submitted,


SAMUEL H. BROOKS,


Manager Municipal Light Dept.


117


REPORT OF PLANNING BOARD


Report of Town Planning Board


To the Honorable Board of Selectmen,


Wakefield, Massachusetts.


Gentlemen:


The Town Planning Board herein presents its report for the year ending December 31, 1934.


The Board has held such meetings as were necessary to consider matters presented to it. Hearings were advertised and held regarding proposed changes in the Zoning By-laws previous to the last annual town meeting and the recommendations of the Board made to that meeting.


Hearing at the State House regarding the level of Lake Quannapowitt and the drawings of the swamp area north of the lake were attended by the Board and its co-operation furnished regarding the matter.


The Board has been and is giving considerable time to the consid- eration of the proposed location of a part of the north circumferential highway as it passes across the northern portion of the town. The Board is joining with representatives of other towns along the route of this pro- posed highway looking forward to a judicious location of the highway and some wise uniformity of zoning adjacent to it.


As to the activities under the ERA and other authorities for town improvements, the Planning Board, in general, gives its approval. In particular it seems that North Avenue, at Church Street, might well have been widened and straightened at the time the work was done on the new playground. The condition at present forms somewhat of a traffic hazard and can yet be remedied.


The Planning Board believes that all matters of town planning, whether of minor or major importance, are within the scope of its duties and at all times is ready to extend its co-operation to any and all boards or officials having the execution of work in hand which involves planning.


Respectfully submitted, TOWN PLANNING BOARD,


E. M. BRIDGE, Chairman.


118


TOWN OF WAKEFIELD


Report of Bath House Instructor


Wakefield Park Board,


Wakefield, Mass.


The Bath House opening June 25, and closing Sept. 1, was favored with good bathing weather with the exception of the last week, which was rainy and cool.


Two outstanding improvements took place. The installing of septic. tanks for toilets and the setting up of a bubbler for drinking water. The latter was installed with the co-operation of several Legion men and public-spirited citizens. .


The following statistics will give you some idea as to what took place ..


The Bath House was open 69 days from 9 a.m. to & p.m., daily, and on Sundays from 2 to 6 p.m.


Total number in attendance 40,158; average daily, 582; maximum, 1500. Number of minor injuries, 173.


Number of persons needing help (beyond their depth), 16.


Number of suspensions, 10.


I recommend that those in charge watch the condition of the water more closely as to treating the same.


A. G. ABBOTT, Instructor.


September 7, 1934.


REPORT OF SUPERINTENDENT OF STREETS


Report of the Superintendent of Streets


To the Honorable Board of Selectmen,


The following is the annual report of the work done and the expense incurred in the Highway Department for the year ending Dec. 31, 1934.


Appropriation-March June Transfer from CWA


5,700.00


Gasoline Tax Refund


391.59


-


$ 68,993.64


Expenditures


68,988.50


Balance


$ 5.14


Receipts :


Snow Removal - State Aid


$ 153.75


Assessments -Sidewalks and Curbs Lindbergh Road


1,561.94


John Richardson - Cement Sidewalk


53.44


Travelers Insurance Company


Reimbursement for Damages


14.00


Miscellaneous


24.66


$ 2,972.32


EXPENDITURES


Overhead


Salary of Superintendent


$ 2,700.00


Timekeeper and Superintendent Assistant


1,440.00


Clerk


705.25


Office


249.09


$ 5,094.34


General Maintenance


Patrol


$ 785.69


Patching


2,929.52


Street Cleaning


382.18


Tar and Sand


4,514.47


Repairs to Sidewalks


79.19


Repairs to Guardrail


51.88


Repairs to Equipment


3,515.52


Cleaning Catchbasins


944.74


Supplies


2,961.50


!


Ledge Removal


307.10


119


$ 56,000.00


6,902.05


1,164.53


120


TOWN OF WAKEFIELD


New Guardrail


5.51


Street Signs


430.93


Traffic Lines


409.13


New Tools


301.38


Miscellaneous


378.78


Bridges and Culverts


190.32


Resurfacing and Repairs


6,360.88


Buildings


1,149.65


$ 25,698.37


Rebuilding


2,328.29


New Equipment


2,499.62


Saturday Afternoons


2,020.24


Holidays


655.55


Vacations


1,578.43


Drainage


5,206.88


Snow and Ice


11,991.01


Sidewalks


Removal of ashes from Schools and Town Hall $ 308.73


Gravel and Dust


935.11


Asphalt


803.37


Cement


714.63


Stone Bounds


54.78


Curb (New)


1,405.02


Retaining Walls


681.71


Curb (Resetting)


110.37


$ 5,013.72


CWA


6,902.05


$ 68,988.50


GENERAL MAINTENANCE


Tar and Sand - The following streets received surface treatment:


Main Street-at Melrose line


Park Street-Main Street to Pleasant Street


Pleasant Street-Salem Street to Wave Avenue


Wave Avenue-Pleasant Street to Main Street


White Avenue-Pleasant Street to Main Street


Sweetser Street-Pleasant Street to Main Street Pleasant Street-Sweetser Street to Cordis Street Cordis Street-Main Street to Pleasant Street Parker Road-Elm Street to Outlook Road Prospect Street-Fairmount Avenue to Morrison Road Spaulding Street-Lake Avenue to Lake Clarina Street-Park Avenue to Dell Avenue Converse Street-Gould Street to Jordan Avenue Dell Avenue-Jordan Avenue to Park Avenue Stedman Street-Chestnut Street to Dell Avenue


REPORT OF SUPERINTENDENT OF STREETS 121


Armory Street-Main Street to North Avenue West Water Street-Main Street to opp. No. 37 Wakefield Avenue-Water Street to Bancroft Avenue Bennett Street-Main Street to Melvin Street Hart Street-Nahant Street to Valley Street Lake Street-Albion Street to Broadway Bartley Street-Lake Street to Albion Street


Broadway-Lake Street to opp. No. 104 High School-Walks around building (asphalt)


Montrose Avenue-Water Street to Salem Street (Cutback) Melvin Street-Bennett Street to Nahant Street Foundry Street-Maple Street to Broadway


Repairs to Equipment - Labor and parts for one Mack truck, four Ford trucks, one Ford sedan, one Dodge truck, one Chevrolet coupe, two gasoline rollers, four tractors, Fordson, cement mixer, cold patch mixer, two graders, one gasoline loader, one electric loader, stone crusher, gaso- line pump, stone drag. This item also includes the repair of tools, sharp- ening, etc. The equipment is old and has been used extensively on ERA and Chapter 90 work in addition to the regular work of the department. As a result, the cost of maintenance is high and I recommend the purchase of four new units.


-


Supplies


Gascline


$ 2,365.64


Oil


339.60


Kerosene


153.60


Grease


36.88


Alcohol


33.82


Waste, miscellaneous


31.96


$ 2,961.50


Bridges and Culverts - An examination of the railroad bridge lead- ing into Greenwood Plains showed the planks to be in poor condition. The old planks were ripped off and replaced with new plank and topped with 2" bituminous concrete surfacing.


Resurfacing and Repairs


Location


Type


Cost


North Avenue


(Albion St. to Chestnut St.)


Bit. concrete "C"


$ 1,740.47


Harvard Square


248.65


West Water Street at North Avenue


66


"ח"


523.63


Mechanic Street


66


66


"ח"


1,094.08


Centre Street


66


“D'


729.75


Chestnut Street


(North Ave. 850' east)


Scarify, reshape & tar


874.28


Nelly Street


127.87


Brook Avenue


66


66


66


125.74


66


66


"C"


66


66


122


TOWN OF WAKEFIELD


Maple Street


66


66 218.86


Various streets and shoulders


677.55


$ 6,360.88


REBUILDING


Elm Street (from North end of Triangle at Prospect St .- 900' north-36' wide) Bit. macadam


$ 2,328.29


NEW EQUIPMENT


1 2-Ton' Truck delivered


1


$ 1,359.67


1 Blade Plow


235.00


1 Cement Mixer (2 bag)


350.00


1 Chevrolet Coupe


554.95


$ 2,499.62


DRAINAGE


Length in Man-


Catch-


Location


Size


Feet


holes


basins


Nahant Street opp.


No. 96 to Melvin St.


8". iron


120


2


Jordan Avenue


Jordan Ave. to Albion St.


24" V. C.


64'


1


Hopkins Street


Layton Ave. to Brook St.


12" r. c


144'


2


Main Street opp:


Hart's Hill Reservation


12" V. C


8'


1


-


Spring Street


Near Druid Hill Ave.


10" v. c


6'


-


2


Main Street


Yale Ave. to Avon St.


12" V. C


36'


2


1


Cordis Street


(12" conc.


24'


Near Vernon


(12" r. c.


12'


1


Converse Street At Culvert


2


Broadway opp. No. 66


12" V. C.


28'


2


Main Street opp. No. 210


Bartley Street opp. No. 11


18" conc.


42'


1


Murray Street at Gould Street


10" v. c.


32'


1


Wakefield Avenue


at Water St.


1


Lee Street


(12" r. c.


32'


1


2


Gould Street


Walnut St. to Cedar St.


12" r. c.


140'


1


-


(12" V. C.


180'


2


REPORT OF SUPERINTENDENT OF STREETS


123


New Salem Street Wharton Park to Culvert Under New Salem St.


Opened and cleaned ditch 1500'


Water Street


Water Street Culvert


Opened and cleaned ditch 2800'


(Saugus River)


to Town Pit


Aborn Avenue to


Vernon St. Opened and cleaned ditch 800'


In addition, catchbasins were cleared and stoppages remedied during storms.


The cost on the above work was as follows:


Labor


$ 4,160.54


Trucks®


8.75


Material


1,037.59


REMOVAL OF SNOW AND ICE


Labor (shovelling)


$ 5,052.75


Trucks plowing roadways


2,482.00


Horse plowing sidewalks


1,170.63


Trucks hauling


2,086.75


Repairs to Snow Plows


Labor


$479.72


Material


218.11


689.83


Sanding®


Labor


$390.08


Trucks


3.75


Material


2.94


396.77


Snow Fence


112.28


$ 11,991.01


SIDEWALKS Gravel and Stone Dust Location


Street


Traverse Street


Nahant Street to Middlesex Ave. (east side)


Water Street


Crescent St. to R. R. (south side)


Hart Street


Melvin St. to Valley St. (north and south side).


Main Street


637 to Greenwood Bridge (west side)


Melvin Street


Hart St. to Nahant St. (west side)


Nelly Street


Bartley St. to Broadway (east and west side)


Bartley Street


Lake St. to Albion St. (north side)


Nelly St. to No. 8 (south side)


Section Nelly St. to Albion St. (north side)


Broadway


Gould Street


Section Walnut St. and Converse St. (south side)


$ 5,206.88


124


TOWN OF WAKEFIELD


Greenwood Avenue


Gould Street Columbia Road


Section Albion St. and Byron St. Water St. to Bancroft Ave. (west side)


Cement


Nahant Street


In front of residence No. 18


Gould Street


In front of residences No. 97 and No. 99 Renwick Rd. to Ashland St. (north side)


Overlook Road


Main Street


Lakeside from Lawrence St. 3600' north


Grass plot loamed and seeded (west side)


Stone Bounds


Gould Street from Albion Street to Cedar Street was relocated by the County Commissioners. The alignment of the street has been con- siderably improved. Forty-six stone bounds were set by this department in accordance with the new layout.


New Curb


Street


Location


Type Cement


317' 10"


Nahant Street


In front residence No. 18


Granite


42' 10"


Gould Street


In front residence No. 92, 94, 96, 97, 99, and 235 Albion St.


Granite


367' 11"


Columbia Road


Water St. to Bancroft Ave.


(west side and section on east side)


Granite


520'


Water Street


In front Italian Cath. Chapel


Granite


60'


9"


W. Water Street


At North Ave. (north side)


Granite


40’


4"


Mechanic Street


At Crescent St. (south side)


Granite


17'


3"


Retaining Walls


Salem Street


In front residence No. 161


Stone


78'


Main Street


At Cordis St. (north corner) New County layout Stone


52'


Main Street


Lakeside opp. Cordis St. (rebuilt) Stone


55'


Melvin Street


In front residence No. 61


Stone


70'


Broadway


In front residence No. 94


Concrete coping 67'


Gould Street


In front residence No. 97, 99


Concrete


94'


C WA


Labor, trucking and material amounting to $6,902.05 was paid by this department from January to March to carry on the activities of the government work projects. After the Town Meeting in March, we were reimbursed for the same amount.


Length


Elm Street


In front residence No. 33


Asphalt


Section Oak St. and Madison Ave. (north side)


REPORT OF SUPERINTENDENT OF STREETS


125


WALNUT STREET


Walnut Street was laid out and accepted by the Town in February, 1934. Appropriation June, 1934 $ 3,500.00


Amount expended 2,372.27


Balance $ 1,127.73


The construction of this street is complete with the exception of the surfacing of the street. As soon as a new water main is laid we will complete the job.


CHAPTER 90 WORK


An allotment was received from the State and County to assist the Town in resurfacing the following streets:


Main Street - from Water Street to the B. & M. R. R. crossing, a. distance of 1200 feet in length, and 54 feet in width.


North Main Street - from Lowell Street to Bay State Road, a. distance of 1500 feet in length, and 24 feet in width.


Appropriation by Town-March


Amount expended by Town


$ 7,000.00 6,843.61


Balance


$ 156.39


Allotment from the State


$ 9,286.54


Allotment from County


3,421.80


Allotment from Town


6,843.61


$ 19,551.95


Amount Expended :


Main Street


$ 10,767.60


North Main Street


8,784.35


$ 19,551.95


Ten street lines were run and staked upon the request of property owners.