Town of Reading Massachusetts annual report 1931, Part 19

Author: Reading (Mass.)
Publication date: 1931
Publisher: The Town
Number of Pages: 360


USA > Massachusetts > Middlesex County > Reading > Town of Reading Massachusetts annual report 1931 > Part 19


Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).


Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 | Part 18 | Part 19 | Part 20 | Part 21 | Part 22 | Part 23 | Part 24


33 Lowell and Grand.


34 Grove and Forest.


35 No. Main and Locust.


36 No. Main and Ridge Rd.


37 No. Main front of no. 409.


38 No. Main and Forest Glen Rd.


381 Forest east of Colburn Rd.


39 No. Main and Franklin.


392 No. Main and Mill.


41 Village and Green.


412 Boston Stove Foundry.


414 Green and Beech.


42 Haven and John.


422 Eaton and Pleasant.


43 Salem and John.


44 Salem and Pearl.


442 Pierce and Orange.


45 Salem and Belmont.


452 Salem nr. Libby Av.


46 Pearl and Charles.


47 Haverhill and Charles.


48 Bay State Rd.


*482 Old Fair Grnds .. off Salem


*485 Rifle Range, off Hav'h'1 St.


49 Haverhill and Franklin.


51 Main, Ash and Washington


53 So. Main and Knollwood Rd.


54 Ash and Cross.


226


55 Reading Rubber Mills.


6 C. H. Bangs Co. (Private)


61 Lowell and Highland.


611 Home for Aged Women. (P)


612 Bancroft Av. and Locust. *681 Grove beyond Franklin.


614 Auburn and Park St.


62 Spare box.


623 School and Dudley.


81 Call to Wakefield.


63 Hanscom Av. No. of Weston 82 State Sanatorium, No. Read.


Special Signals


2 All out signal.


2 Test, 7.45 a. m., 5.45 p. m.


22 No school signal.


3 Followed by box, 2nd alarm.


3-3 Boy Scout call.


4 Followed by box, 3rd alarm.


4 Police call.


Transmitter boxes can only be sounded from Central Fire Sta- tion.


Respectfully submitted,


HUGH L. EAMES,


Superintendent of Fire Alarm.


642 Vine and Vale Rd.


65 Middlesex and Bancroft Avs.


67 Middlesex Av. and High.


68 Grove and Franklin.


69 Franklin, Van Norden Rd.


8 Out of Town.


Thirty-seventh Annual Report


OF THE


ELECTRIC LIGHT COMMISSIONERS


For the Year Ended December 31 1931


228


OFFICERS OF ELECTRIC LIGHT AND POWER DEPARTMENT


Commissioners


HENRY R. JOHNSON Chairman Term expires 1932


HERBERT G. EVANS, Secretary Term expires 1933


HARRY P. BAKER


Term expires 1934


Manager ARTHUR G. SIAS


Office 177 Main Street, Reading, Mass.


MANAGER'S REPORT


To the Municipal Light Board :


Gentlemen :


I respectfully submit my report of the operations of the Muni- cipal Light Plant for the fiscal year ending December 31, 1931. This has been the first year since 1915 that the department has not shown an increase over the previous year in the number of kilowatt hours sold.


The decrease was small, amounting to about seven-tenths of 1 per cent and was due to the decreased use of electric power for manu- facturing purposes. The decrease for the entire country was 4 per cent. Substantial increases were made in the number of kilowatt hours sold for lighting, cooking, heating and refrigeration.


The number of kilowatt hours delivered at the switchboard on the day of greatest output was 25930 and occurred on December 24th. The maximum demand on the plant was 2250 K. W. which occurred on the day of maximum output. This is an increase of 60 K. W. over the previous year.


The following table shows the number of kilowatt hours pur- chased, the number sold for the various classes of service, the num- ber furnished for which no revenue was received, and the amount unaccounted for during the past two years.


229


K. W. HOURS PURCHASED AND SOLD


1931


1930


Increase or Decrease


K. W. Hours :


Generated


:none 6,885,880


none 7,050,708


164,828


Totals


6,885,880


7,050,708


164,828


K. W. Hours Sold :


Residence Service


3,118,622


2,783,528


335,094


Commercial Lighting


543,591


500,427


43,164


Commercial Heating


233,401


201,151


32,250


Commercial Power-Retail


1,001,116


1,017,313


16,197


Commercial Power-Wholesale


342,980


763,140


420,160


Municipal Lighting


104,556


98,495


6,061


Municipal Power


198,865


246,340


47,475


Street Lighting


418,247


391,385


26,862


3,210


3,056


154


Police Spot Lights Sub-total


5,964,588


6,004,835


40,247


K. W. Hours used at Office, Station and Garage


52,634


52,117


517


K. W. Hours used for Christmas Il- lumination


10,788


14,264


3,476


K. W. Hours Unaccounted for


857,870


979,492


121,622


Totals


6,885,880


7,050,708


164,828


Per Cent Unaccounted for


12.45%


13.9%


1.45%


The number of kilowatt hours sold for residence service in- creased approximately 12 per cent and showed an average annual use per residence meter of 658. In 1930 the average use was 611, and in 1929 it was 544 kilowatt hours. These figures show that each year more of our customers are taking advantage of our exceptionally fav- orable rates for residence service and are using more electrical ap- pliances in their homes.


Sales of kilowatt hours for commercial lighting show an in- crease of 8.6 per cent; for commercial heating and refrigeration 16 per cent ; and for street lighting 7.7 per cent. The number of kilowatt hours used for power dropped off considerably, showing a reduction of nearly 24 per cent.


The kilowatt hours unaccounted for, which represent losses in the distribution system, dropped from 979,492 to 857,870, the latter figure representing a loss of 12.45 per cent which is a reduction of


Purchased


230


about 1 1-2 per cent over last year. It is about 33 1-3 per cent less than the average for the entire country.


This compares with a loss of 18 per cent in 1929, a reduction of about one-third, due principally to the increase in the size of feed- ers, the grouping of several customers in a given area on one large transformer, and the removal of several small transformers; also to the stabilizing effect on the voltage at customer's premises by the new feeder voltage regulators at the power station.


The current purchased during the year cost 1.134 cents per kilowatt hour delivered at our switchboard, as compared with 1.106 cents in 1930.


This increase is due to a slight increase in the maximum de- mand and also to the reduction in the number of kilowatt hours sold for power during off-peak hours.


The production cost per kilowatt hour purchased, including labor and all station expenses, was 1.397 cents, and average total op- erating cost of all kilowatt hours sold, including the kilowatt hours delivered to street lights, was 4.478 cents.


The average income per kilowatt hour sold to consumers and delivered to street lights, including the appropriation for street light- ing, was 4.64 cents.


A comparison of the costs per kilowatt hour sold and delivered to street lights for the years 1931 and 1930 is shown in the following table :


· Comparison of Operation Costs, 1931-1930


1931


1930


Production


1.343


1.332


Distribution


1.233


1.139


Utilization


0.184


0.169


Commercial


0.245


0.240


New Business


0.043


0.061


General and Miscellaneous


1.149


0.980


Bonds, Notes and Interest


0.281


0.265


Total Costs


4,478


4.186


The total income from sales of current shows an increase of $9,868.01 over the previous year or about 3.7 per cent, notwithstanding the loss in revenue from power sales of $10,179.73. This of course is due to the increase in revenue from the other classes of service.


The cost of operating the street lights in Reading for 1931 was $14,515.97. There was appropriated from the tax levy for this purpose $13,500.00.


The following tables show the classification of income and kilowatt hours sold for 1931 and 1930:


231


Income from Sales of Current


Increase


or


Residence Service


1931 $159,147.38


$143,939.34


Decrease $ 15,208.04


Commercial Lighting


36,509.62


34,599.15


1,910.47


Commercial Heating


7,958.15


6,942.82


1,015.33


Commercial Power-Retail


32,788.29


33,944.39


1,156.10


Commercial Power-Wholesale


6,298.18


14,086.86


7,788.68


Municipal Light


2,111.34


1,915.72


195.62


Municipal Power


4,315.69


5,505.26


1,189.57


Street Lighting


27,630.82


25,957.92


1,672.90


Totals


$276,759.47


$266,891.46


$9,868.01


Income from Each Town


Increase


or


1931


1930


Reading


$173,513.76


$163,207.91


Decrease $10,305.85


Lynnfield Center


17,356.37


15,275.35


2,081.02


North Reading


32,180.79


28,914.17


3,266.62


Wilmington


53,205.57


58,986.79


5,781.22


Other Districts


502.98


507.24


4.26


Totals


$276,759.47


$266,891.46


$9,868.01


K. W. Hours Sold in Each Town


Increase


or


1931


1930


Decrease


Reading


4,307,788


4,024,023


233,765


Lynnfield Center


282,854


238,873


43,981


North Reading


538,593


454,640


83,953


Wilmington


826,222


1,278,985


452,763


Other Districts


9,131


8,314


817


Totals


5,964,588


6,004,835


40,247


Operating expenses for the year show an increase over 1930 of $13,045.33, about one-third of which is accounted for by increase in the Depreciation allowance and Adjustments of inventory values.


The expense for Operation and Maintenance of Distribution Lines increased $8,794.96. The relocation of poles and wires in con- nection with the rebuilding of the State Highway on Main Street cost $4,667.15. The balance of the increase is due to tree trimming expense of which $4,086.57 was expended in Reading.


1930


232


We have paid $13,000 for bonds retired during the year. $40,- 000 in 3 1-2 per cent bonds were issued for the underground construc- tion in Reading Square and vicinity. The amount of bonds outstand- ing on December 31st was $96,500.


The increase in inventory value is $567.87 after adjustments amounting to $2,500.99.


Current assets are $102,025.26 and current and accrued liabil- ities $44,253.28, showing an excess of assets over liabilities of $57,- 771.98.


Cash on hand and Accounts Receivable amount to $35,906.34. Accounts Payable charged to Operating accounts are $31,877.33 and to Construction accounts $4,345.61. We have repaid the Treasurer, out of this year's receipts, $13,975.81 to offset bills of 1930 paid by him in advance of collections.


The net result of the year's operations shows an increase in Profit and Loss surplus of $10,771.03. This surplus in the Profit and Loss account does not represent a balance of cash on hand. It is the difference between the totals of the Operating Income and Op- erating Expense Accounts, plus Income from Other Sources, less Bond and Interest expense, amounts charged off for accounts which are considered uncollectible, sundry credits to the Income Accounts and Merchandise and Jobbing Expense. A comparative statement of Income and Expenses follows, also a summary of Cash Receipts and Disbursements.


COMPARATIVE SUMMARY OF INCOME & EXPENSES


as of December 31, 1931 and December 31, 1930


1931 1930


OPERATING INCOME


$277,008.61


$267,334.56


OPERATING EXPENSES :


Production


80,091.66


79,977.65


Distribution


73,548.66


68,453.17


Utilization


10,953.83


10,151.88


Commercial


14,613.15


14,433.66


New Business


2,590.69


3,691.30


General and Misc.


60,479.75


57,102.98


TOTAL OPERATING EXPENSES


242,277.74


233,810.64


Operating Rev. before fixed chgs.


34,730.87


33,523.92


FIXED CHARGES


16,764.10


15,948.66


TOTAL OPERATING REVENUE


17,966.67


17,575.26


OTHER CHARGES


2,270.67


1,731.56


NET OPERATING REVENUE


15,696.10


15,843.70


233


OTHER INCOME:


Merchandise Revenue


5,043.05


2,135.40


Jobbing Revenue


904.02


407.93


Miscellaneous Income


737.98


Interest Income


284.02


104.89


TOTAL OTHER INCOME


4,925.07


2,438.44


Net Income


10,771.03


13,405.26


SUMMARY OF CASH RECEIPTS AND DISBURSEMENTS


during the period Jan. 1, 1931 through Dec. 31, 1931


CASH BALANCES JAN. 1, 1931 :


Operation Fund .


none


Depreciation Fund


$ 1,451.40


Special Construction Fund


5,109.12


Petty Cash Fund


250.00


Cash Balance


$


6,810.52


CASH RECEIVED :


Sale of Electricity


$263,259.47


Street Light Appropriation


13,500.00


Miscellaneous Receipts


56,595.83


Bond Issue 1931


40,336.00


Total Cash Receipts


$373,691.30


Total


$380,501.82


CASH DISBURSED :


Operating Accounts


$272,017.71


Interest Paid


3,675.00


Bonds Paid


13,000.00


Additions to Plant


30,995.11


Underground Construction


42,338.97


Refund to Town Treasurer


13,975.81


Total Disbursements


$376,002.60


Cash Balances, Dec. 31, 1931


Operating Fund


$ 413.45


Depreciation Fund


1,784.40


Special Construction Fund


2,051.37


Petty Cash Fund


250.00


Total Cash Balance Dec. 31, 1931


$4,499.22


The cash balances in the Operation Fund, Depreciation Fund and Special Construction Fund are also shown in another part of this re- port.


New Construction during the year amounted to $76,546.40, of which $45,747.92 was the cost of the new underground system in and


234


around the square. The increases in the various Plant accounts are shown in detail elsewhere in the report.


. The amount paid for Construction Accounts during the year was as follows: From the 1930 bond issue $3,057.75, from the 1931 bond issue $40,000 and from the Depreciation Fund $30,276.33.


The classification of customers as of December 31st is shown in the following table :


CLASSIFICATION OF CUSTOMERS AS OF DECEMBER 31, 1931


Res. Ltg.


Com. Ltg.


Com. Com'rcial Pow. Priv. Totals Htg. Retail Wh'sale St. Lts


Reading


2558


279


50


74


11


11


2983


North Reading


714


58


19


14


3


6


814


Lynnfield Cent'r


397


25


9


8


0


0


439


Wilmington


1122


102


19


22


0


4


1269


Totals


479


464


97


118


14


21


5505


The street lights have been operated during the year the following number of hours: Reading 3934; North Reading and Lynnfield Center 2118 and Wilmington 2105.


The following table shows the number of each size of street lamps renewed during the year :


STREET LAMPS RENEWED BY SIZES


40 50 60 100 250 300 400 600 1000 Totals CP Watt CP CP CP Watt CP CP CP


Reading


679


8


84


-


39


11 30


851


Lynnfield Center


316


316


North Reading


558


55


Wilmington


809


30


1


15


2


857


Totals


1683


30


679


8


85


15


39


13


30 2582


POWER STATION


The generating equipment at the power station has been thorough- ly cleaned and re-painted and is in good condition. It has not been used during the year, all current being purchased. The interior walls of the station and the doors and windows have also been painted.


A 60 K. V. A. Street Light Regulator and control panel has been installed for the new lights in the center of the Town.


The feeder voltage regulators installed last year have materially improved the regulation on the feeder circuits.


DISTRIBUTION LINES


We have continued the periodic inspection of pole lines and the renewal of defective poles.


-


-


235


Th following tables show the number of each size poles renewed as well as the additional poles set during the year :


SUMMARY OF POLE ADDITIONS AND RENEWALS COMPARATIVE STATEMENT OF POLE ADDITIONS AND RENEWALS


Additions :


1931


1930


1929


Reading


54


76


80


North Reading


90


139


55


Lynnfield Center


37


44


75


Wilmington


108


118


129


Total Additions


289


377


339


Renewals :


Reading


228


287


146


North Reading


129


89


86


Lynnfield Center


46


95


31


Wilmington


128


120


92


Total Renewals


531


591


355


Total Poles Handled


820


968


694


COMPARATIVE STATEMENT OF POLE ADDITIONS AND RE- NEWALS BY SIZES


Additions


Renewals


Poles


1931


1930


1929


1931


1930


1929


25


3


1


-


30


250


265


257


197


90


137


35


34


57


60


292


424


174


40


5


55


16


32


58


36


45


2


10


18


8


50


55


-


1


Totals


289


377


339


531


591


355


-


-


The feeder lines to North Reading and Lynnfield have been par- tially rebuilt and additional wire installed. This work is not yet completed.


Some work on the Wilmington feeders has been done, but the balance of this reconstruction has been delayed pending the rebuild- ingi of the State highway from Wilmington to the Tewksbury line, which is to be done this coming year. The Reading feeders supply- ing service in the section east of the Square have been removed from Main and Harnden Streets and this section is now supplied from the Washington Street feeders. New feeders have been installed on the Lowell Street and Reading Highlands circuit ..


The reconstruction and widening of the State highway from Reading Square to the Andover line made it necessary for us to re-


236


locate our poles and wires in several places. The total number of poles reset on this line was 137. A considerable amount of wire was also renewed. The cost of this work including labor and materials was $4,667.15 which was paid from the operation fund.


The power lines have been extended to the new Water Pump- ing Station at Hundred Acre Meadow, furnishing service for 175 horsepower in motors, which operate this plant.


Approximately 33 miles of overhead wire has been added to the distribution lines during the year.


The wires of overhead distribution systems of necessity pass through many trees and if proper attention is not given to trimming and insulating, service interruptions are certain to occur.


A very thorough trimming job has been done this year under the supervision of the Tree Wardens with the employment of local labor, at an expense of $5,872.01. Annual inspections are necessary in order to maintain satisfactory service.


UNDERGROUND CONSTRUCTION IN READING SQUARE


In accordance with the vote of the Town at the annual meet- ing in March, we have installed underground cables and new street lighting units and removed the poles and overhead wires on the fol- lowing streets : Main Street from Green Street to Salem Street, Salem Street from Harnden Street to Lowell Street, Harnden Street the entire length, Lowell Street from Woburn Street to Sanborn Street, Woburn Street from Harnden Street to the driveway leading to the Municipal Building, and Ash Street from Haven Street to the Ameri- can Legion Building. Fifty-two poles were removed and approximately 12 miles of overhead wire was taken down.


The underground construction consists of 24,030 feet of Bermico fiber duct and 3,826 feet of steel duct. There are 8 manholes in the main duct line, 2 of which contain duplicate installations of lighting and power transformers; arranged with double throw oil switches to facilitate the restoration of service in case of trouble with either of the transformers or in the underground cable. 75,754 feet of lead cov- ered Anoroc cable is installed in the underground ducts.


A spare feeder circuit has been installed in the duct line, for use in case of trouble on any of the underground feeders. It is con- nected to the overhead lines at each end through double throw oil switches and can be placed in service by simply operating the switches at each end of the line.


The ornamental street lighting system consists of 46 concrete standards, with aluminum brackets which extend 5 feet from the post. The lighting units are General Electric Form 32 equipped with No.


LATERALS


STREET LAMP CIRCUIT


FROM


TO


PE LENGTH DATE


SIZE VOUS DATE


Town of Reading Municipal Light Department Underground System


1931 Construction Scale :- lin. - 40ft. Davis & Abbot + Civil Engineers; Reading, Mans,


MUNICIPAL LIGHT DEPARTMENT


Henry R. Johnson, Chairman Herbert G.Evans, Secretary Harry P. Baker, Arther G.Sias, Manager


Conduit Construction ;-


Rober+ CAllen Construction Co.


Cable Installation -- James Sugden Company


LEGEND


Consultant :-


, Arthur C.Sias


Engineers !=


Davis & Abbott


SECONDARY


17.OWW


Distance, well +u will of Manholes;


Laterals, ty Steel Conduit.


2' F/WRC


Stree+ Light Circuit, ti hoer with Plank Cover.


Ornamental Street Light Posts.


Top Duct entering Fost


No & Single Conductor Parkway Cable.


No & Parkway in IT iron Conduit


Totals :-


5,780.4 Lin ft 2\' Fiber Duct, with Plank Cover, 371.7 .


184,5 + 14 Iron Conduit, containing part of above Parkway Cable.


4G Ornamental Street Lamp Posta.


MANHOLES


ASIDE OEM


CONSTRUCTICH


Coven


ADAPTER COVLE


SHAPE


W-L-H


FLOOR SHAPE MAX, OPENING BALADE


-


Came


-


C-10-3


$ =717


.


-


.


5¥717


.


.


4


4


-


5


G


7


.


S'*7A7


1


.


16.1931


177 Main St


77 Man 51


4766-1242


.


748 7-14-


Light IS


.


45.0 0-10-21


GR.5 7-IC-


S-BE-31


456 7-15:31 304


4


384


#


2.8 7-15 31


16% Main S


.


#


7-63-M


-23-34


73


4


137.5 7: 44-31


1530 7-14-M


0-17-31


ok Cover


1205 7-13-2


Q-ET-3


FIBER DUCT CONSTRUCTION


Surface t


54 6 7.134


12


B


6


4


30


IGA Han St


.


132.0 7. 6: 31


GG8 7- 3:31


.


. 3-44-31


33


5 Hamdich 5


5.24-31


34


3-24.31


MHO


.


172-1 7:15-1


4 3


.


11 -24-31


805 7-14- 3


.


.


11 -24.31


45


157.2 7-18- 3


.


=


40


Concre+c protection, Top, Tides ABottomvied enentire Pun. (1-3-5} Mixture.


MAIN CONDUIT


SAFIRFR DUCT


SHEL REMARKS


FROM


TO


1


SUMA 12 0 011


STREET LIGHT


ST.


P


ZIDA MainSt


THE RIWPC.


1


21


124 MAA+ 5+


839 th F/WPC


+ BOR IEL


Police Booff


Reading Ortun


Main


ST.


It - 37 F D. Z36


8-37 FD.


LZ8.00 W.W


330 ZY


:43.2 Walls F PLH |Es Bei


IGAS IF/WPC


-


2.3


40 . :6/ MainSt


Pale


7 4


12.


Police Spet u


102 Main5+ 191 Mam5. 151Main5+


Harnden


3 Harmepost


7 Mam5+


Harnden5+


Harnden


St.


Pale


PRIMARY


Union


S


+.


Pela


Police Spot Light circuit


SECONDARY


+


.


#


.


PE


.


79


33


43.0 7-10:3


123 5 7-10-1


4


5-24.21


12-3F.D.


Main Conduit, of It . 3% Piber Ducts.


1100CC.


Distance, center to contor of Manholes,


38


33 6 7- 1043


.


16-28 31


2"Concrete Netert


... ... Y


Municipal


Building


St.


Library


Center School


ILO


MUC


PH 7


MTHR


43Z


MA4


100 0


Lyceum Hall Association


Ash


Pale 1


375 7


479


908 5 5842 154 1 12-0 118 2


473 Lingar Beet


Green St.


St.


3-3%'FD.


193.50 C~an##


1015 LÝ F/WPC


1-2,5


73 Main St.


TIMainST


175 ManS+ +


473 HanSt


PRIMARY


Pole


i Green


STREET LIGHT


Chapin Ave.


Pleasant


ST.


ST.


YPC LENGTH DATE


IGTM-ASt


340 7/7/ 3 354


1G7 MainSt


80.7 7-21-21


B.EE-31


MHZ


.


834 7-21-3


Vacan+ Lot


.


.


6497-11-31


+


175 Man


537 7-210


736 7-25-31


3"2


O


11 A Main 5 .


70 M2751


3-4


.


PlankCov


BE5 G-19-1


.


83 5 G+ 1+-3


8.0 6-19-31


#


11 -12-31


.


1.730.1 Cm


Fiber with F


188.5%.36-34 .


+


Lowell


--


3.050-3 Lin. FR.


2 Fiber with PlankC


110 9 7-14.3


10-27-1


-11-21


M.H.S


Manholes, in-de dem, & rumbo".


Pull Boxes.


4


73 8 7-11-3


Earth Cove


Woburn


Haven


ST.


107 ZŁ E/WPC.


1-2%'5


70Main St


134


74MonSt


M.H.3


M.H. 2


+ M


M.H.


Main


G-37 50. 190.00 1mm


IF/WPE.


-3TE F.D


63.2


14P23


To3 Main St


175MGIn5+


Haven


243


st.


ES GOCC


15.10W.W


I.M.S


M.M. G


LA30


1376 2), FINPC.


1


Tota's


DUCT INSTALLED


CABLE INS


DUCT INSTALLED


CABLE INSTALLED


REMARKS


144 54:5:3 1


.


141,6 G-11-31


. 2040 11-57-3


900


-


Rtct, d'11-3


-


Christian


Science Church


-


-


Sanborn


DATE REMARKS


TO


REMARKS


MH 1


2


15


5


PI


42 Maio5


SI Main St


.


de Main St


03|7-15:31


1051 7-13.3


53 Main St


3-4


3420


2+1-31


37.6 7-3-3


.


Scale :- > in .lA


30


+


421.2 7-8-31


# 11-12-34


0-23-34


Laurel Hill Cemetery


45


BIG O 7-18-3


.


40


72 3 94 1. 71


. .


4


MH.G


124 4


t H.


DOS ~ 8 Parkway


1)' tron conuvit


OD -& Parkway Iron Conduit


Old South M. E.Church


105


** 3.F., COA Man"+


172 ManSt


M.H. 8


Salem


54


10


.


1-3-2


11-12-31


11: 5 7-1 -3


1305 #


.


245 7-16 31


₹V4


Totals


# ~ 6 Single Conductor Partway Cable.


St.


St.


.


-


174 Man 51


.


237


162 medium alabaster globes and 1000 candle power lamps suspended 20 feet above the street.


Each post is arranged for a cutout in the base so that the lamp may be disconnected from the circuit in case of trouble.


The new street lighting circuit runs direct to the power sta- tion and is connected to a regulating transformer with 20 ampere coils, thereby eliminating the use of insulating' coils in the lamps or posts.


The cost of the underground construction, including the orna- mental street lighting, was as follows :


Ducts .and Manholes $20,622.74


Cables and Installation


14,767.03


Service Connections


1,243.04


Ornamental Street Lights


8,476.58


Engineering and Plans


638.53


Total Cost


$45,747.92


Estimated Cost


$43,070.06


Cost in excess of estimate.


$2,677.86


The following is a list of the firms who furnished material and labor for the underground construction :


Graybar Electric Company


Boston


Fiber Duct


Geo. H. Buckminster Co.


Boston


Steel Duct


Simplex Wire & Cable Co .:


Cambridge Lead Cable


Westinghouse Electric & Mfg. Co. Boston


Transformers


Allis-Chalmers Mfg. Co.


Boston


Transformers


Condit Elec. Mfg. Co.


Boston


Oil Switches


F. S. Hardy & Co. Boston


Potheads


George H. Wahn Company


Boston Concrete posts and brackets


General Electric Supply Corp.


Boston Lighting units and cutouts


Wetmore-Savage E. S. Co.


Boston Regulator and Panel


Mechanics Iron Foundry Co.


Boston Manhole Frames and Covers


Wendell Bancroft & Co.


Reading Brick, Cement and Plank


Fred F. Smith


Reading Compound and Plank


R. C. Allen Construction Co.


Worcester Conduits and Manholes


James Sugden Company


Boston Installing Cable and Lamp posts


Clapp & Leach, Inc.


Reading Building Connections


Davis & Abbott


Reading Engineering and Plans


George W. Ellis Co., Inc.


Boston Removing old poles


The Edison Elec. Il1. Co.


Boston Testing Cables


On the following pages are cuts showing the appearance of Read- ing Square before and after the removal of the poles and overhead construction, also a cut showing the layout of the underground system.


238


STREET LIGHTING


We have installed 34 additional lights during the year, of which 25 were installed on the following streets in Reading : Haverhill Street 4, Pleasant Street 1, Ash Street 1, Bond Street 1, West Street 1, Scotland Road 1, Winthrop Avenue 1, Walnut Street 2, and Reading Square 13.


The following lights on private streets, which have been accepted by the Town, have now been made public lights : Shackford Road 1, Wells Road 1, Pinevale Avenue 2, and Glen Road 1, a total of 5 public lights added.


The lighting on Salem Street from Harnden Street to the Wake- field line has been improved by the installation of 16 new type Wheeler fixtures with diffusing globes and 250 candle power lamps.


Further improvements are planned for the coming year on Main Street, from the square to the North Reading Line, and on Woburn Street the entire length.


METERS


We have added to our system 239 meters during the year, and have completed the periodic inspection and test of meters in con- sumers premises.


Frequent inspections and tests are made on all power meters in order to guard against loss of revenue.


A record of inspections and tests is shown below :


Meters tested in meter room 975


Periodic tests of lighting meters in consumers premises 708




Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.