Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 | Part 18 | Part 19 | Part 20 | Part 21 | Part 22 | Part 23 | Part 24 | Part 25 | Part 26 | Part 27 | Part 28 | Part 29 | Part 30 | Part 31 | Part 32 | Part 33 | Part 34 | Part 35 | Part 36
Accepted Streets.
Fifteen streets have been accepted, comprising in length about 8,194 feet. Ten streets have been constructed, and two streets partially constructed, at a cost of $17,591.15. The total length constructed was 8,572 feet.
Snow and Ice.
This department was very unfortunate in having to care for such a large fall of snow during the year, as the amount, $13,171.62, which was spent could have been used to good ad- vantage on the maintenance of our streets. There have been 10,855 loads of snow and ice removed from the streets during the year. It is also the duty of this department to care for all side- walks as regards the removal of snow and the care of slippery sidewalks during the winter time in front of public buildings and public grounds, also,-under an ordinance passed February 12, 1904,-when the tenants suffer to remain on such sidewalks for more than six hours, between sunrise and sunset, on any day, any snow or any ice, unless such ice is made even and covered with sand or other suitable material to prevent slipping. Such owner and tenant shall remove all snow and ice from such side- walk within the time and in the manner herein specified. Who- ever fails to comply with this ordinance shall be liable to a pen- alty of not more than $20 for each offense.
Miscellaneous.
Thirty-two streets have been macadamized or re-surfaced, at a cost of $17,036.94, a total length of 31,131 feet.
There are 69.3 miles of public streets and 24.26 miles of private streets in the city, making a total length of 93.56 miles in the city.
575 permits were issued for the use of streets and sidewalks,
-
KENT STREET SUBWAY.
KENT STREET SUBWAY, WITH STORM SHIELD.
325
STREET COMMISSIONER.
and 619 defects in the streets and sidewalks, which were reported by the chief of police, were promptly repaired.
Ninety signs and guide posts have been painted and erected by the department during the year.
4,007.84 square yards of brick and 107.87 square yards of granolithic sidewalks have been laid, and 24,225.4 feet, or nearly 4.588 miles, of edgestone and inside curbing were set, at a cost of $25,702.06. 8,010 square yards of block stone gutters and 280.11 square yards of vitrified brick, granite, and concrete crossings were laid, costing $16,392.13.
11,861.6 feet, or over 2.247 miles, of edgestone were re-set, and 7,464.1 square yards of brick sidewalks re-laid, at a cost of $6,581.01.
229.6 square yards of crossings and driveways have been re- paved with granite blocks.
150 square yards of granite and concrete crossings surfaced with concrete, and 102.3 square yards of driveways paved or re- paved with brick.
3,437 yards of sand and gravel have been used in this branch of the work. 3,894 loads of dirt and 10,211 loads of scrapings were removed from the streets.
1,362 loads of old macadam and 2,395 loads of ballast were used in the repair and construction of streets, and 4,801 loads of ashes used in the repairs and construction of sidewalks and in setting and re-setting of edgestones.
This department has been called upon to furnish steam roller, teams, crushed stone, sand, gravel, and ashes to the other departments.
This department has paved 614 square yards of block pav- ing and re-laid 748 square yards in front of the engine house situated in Union square.
Some of the sidewalks that have been laid in the oldest parts of the city, and where sewer, water, and gas trenches have been made, need attention.
No department or company should be allowed to open any street or sidewalk after the frost sets in, unless in a case of emer- gency.
The department maintains its own painter, blacksmith, horseshoer, and harness repairer, all situated at the city stables.
Transportation of Explosives and Gunpowder.
On December 23, 1904, an ordinance was passed by the board of aldermen, a portion of which relates to this department, as follows :-
Section 1. No explosive or gunpowder shall be transported through any portion of a street unless notice has first been given in writing to the chief of the police department, stating the proposed route, the time of transportation and the gunpowder or explosive intended to be trans- ported, nor unless his approval in writing has first been obtained.
Section 3. No vehicle shall be used for the transportation of any explosive or gunpowder through any portion of a street except a ve-
326
ANNUAL REPORTS.
hicle previously approved in writing by the chief of the police depart- ment and bearing on the outside of both sides in letters at least four inches high the words, "Explosive" and "Dangerous."
Section 4. No person shall allow a vehicle containing any explo- sive or gunpowder to be left without some one in charge or to move faster than at the rate of four miles an hour.
In accordance with this ordinance, the department has ful- filled the requirements, and the vehicles used for such purpose have been accepted by the chief of police, and the law will be rigidly enforced.
Recommendations.
. I would most respectfully recommend that Washington street, from Union square to the Cambridge line, Prospect street, Linwood street, Summer street, from Belmont street to Cutter square, and School street, from Broadway to Medford street, be macadamized; Washington street, east side, from Tufts street to the Boston line, and Somerville avenue, from Kent street to Oak square, be paved with blocks; that the paving blocks in Union square be removed and said square paved with bitulithic; that the narrow main streets with double car tracks be put in first- class condition with either bitulithic, brick, asphalt, or macadam, and that Gilman square be paved with bitulithic. That edge- stones be set and gutters paved with blocks on the south side of Elm street, from Mossland street to Cutter square, Holland street, from Irving street to Teele square, Beacon street, south side, from Washington street to Park street, Main street, from Broadway to the Medford line, Medford street, from the railroad bridge to Highland avenue, and College avenue, from Broadway to the Medford line. This would complete all our main thor- oughfares with edgestones. I further recommend that the brick paving in Davis square be extended to Chester street.
I wish to extend my sincere thanks to his honor, the mayor, the board of aldermen, heads of departments, and all city officials with whom I am associated, and the genial public, for their able support and hearty co-operation ; and I would express my ap- preciation of the conscientious work and efficient service of the foremen, inspectors, teamsters, laborers, and all others employed in the department.
.
r
EASTMAN ROAD.
00
BARTLETT STREET, NORTHEASTERLY FROM MEDFORD STREET.
327
STREET COMMISSIONER.
Highways Maintenance Account.
CREDIT.
Appropriation
$5,375 00
Receipts and credits :-
Commonwealth of Massachusetts, street
railway tax
$43,655 40
Boston Elevated Railway tax 7,965 91
Materials furnished prior to January 1, 1904, the bills of which remained un- collected that day .
589 95
Teaming coal in 1903
63 20
Value of materials on hand January 1, 1904,
1,868 45
Value of tools and property on hand Janu- ary 1, 1904
20,243 45
74,386 36
Profit and loss on tools, property, and materials .
2,562 14
$82,323 50
DEBIT.
Expenditures :-
For repairs of sundry streets as per table B, at end of this report
$17,036 94
General repairs of streets
7,025 33
Repairs of stone paving
132 80
Repairs and maintenance of gravel sidewalks .
2,852 93
Repairs of street crossings
492 25
Cleaning streets
14,400 89
Removing snow and ice and care of slippery sidewalks .
13,975 72
Repairs of gutters
1,328 02
Care of subways
163 70
Removing trees
158 23
Trimming trees
182 30
Setting trees
194 50 .
Paving in front of standpipes
14 45
Cutting edgestones at catch basins
130 20
Rolling walks on public grounds
45 65
Constructing driveway at City Hall Annex
80 19
Constructing driveway for American Tube Works .
14 15
Constructing driveway for Somerville Hospital
27 43
Paving in front of engine house, Ward Two
1,825 25
Cutting down sidewalk, Broadway
999 62
Constructing street opening at Hillside circle
16 53
Preparing ball ground at Nunnery grounds
58 93
Repairing driveway in front of Christie estate, Linwood street
29 00
Relaying bricks around engine house, Ward Two
194 00
Setting circle and edgestone, Hall street, corner of Cedar street
4 00
Moving city scales from Union square
77 98
Roofing over subways .
372 73
Building stone wall in front of estate Nos. 19 and 21 Clarendon avenue
135 52
Blacksmithing
511 25
Carpentering
351 63
Painting
71 75
Street Commissioner's salary
1,495 13
Street Commissioner's team, board of one horse
260 00
Amount carried forward
$64,659 01
328
ANNUAL REPORTS.
Amount brought forward
Street Commissioner's telephone
$64,659 01 15 63
Private work, the bills for which remained unpaid De- cember 31, 1904
60 85
Books, stationery, and printing
110 12
Sundry expenses
270 13
Value of materials on hand this day
1,889 80
Value of tools and personal property on hand this day :-
Horses
$5,300 00
Carts and implements used with horses
4,284 75
Harnesses and horse clothing
698 03
Stable utensils and property
504 65
Tools
1,633 30
Steam road rollers
7,500 00
Stone crusher and fittings
1,661 50
Street signs
141 50
21,723 73
Total debit
$88,729 27
Amount overdrawn .
$6,405 77
Highways Construction Account.
CREDIT.
Appropriation
$10,000 00
Transfer from Sewers Construction account,
5,000 00
Receipts :----
Highways Maintenance, stone from con- struction of Clarendon avenue 1,157 34
Total credit
$16,157 34
DEBIT.
Expenditures :-
Construction or partial construction of streets as appears by table A, at end of this report $16,880 74
Less assessments
3,372 77
Advertising and recording releases for streets not con- structed
127 65
Oliver Ames, damage to estate, Middlesex avenue, caused by change of grade in 1897 .
150 00
Florence O. Shepard and others (heirs of Susan E. Gaut), taking of land caused by laying out of Syca- more street
153 29
Chetham Parks, taking of land caused by laying out of Sycamore street
45 40
Printing, orders laying out streets
.16 42
Photographs
12 00
Books
10 25
Total debit .
$14,022 98
Balance unexpended
$2,134 36
.
$13,507 97
·
.
329
STREET COMMISSIONER.
Highways, Paved Gutters and Crossings. CREDIT.
Appropriation Value of material on hand January 1, 1904
$14,000 00 396 00
Net gain on materials
1,126 04
Total credit
DEBIT. $15,522 04
Expenditures :-
For paving twenty-six gutters as per
table F
$16,027 35
Street crossings as per table J
1,282 10
Book (ledger) .
5 00
Value of materials on hand this day
270 00
Total debit
$17,584 45
Amount overdrawn
$2,062 41
Highways, Paving Broadway, Bow and Summer Streets.
CREDIT.
Appropriation
$21,500 00
Receipts :-
From Highways Maintenance, for paving blocks
458 15
Warren Brothers, use of city teams,
8 80
Total credit
DEBIT. $21,966 95
Expenditures :-
Warren Brothers, on account of contract paving Bow and Summer streets, from Union square to northwesterly side of School street .
$11,245 18
135 47
Changing line and grade of catch basins . Changing line of fire hydrants and water mains
131 93
Paving blocks
466 72
Labor, re-setting edgestones and brick sidewalks
1,637 43
Bricks used in sidewalks
28 75
Use of city teams
185 45
Total debit
$13,830 93
Balance unexpended
$8,136 02
(Third and final payment due May, 1905, $591.85.)
Highways, Watering Streets.
CREDIT.
Receipts :-
Assessments and contributions from abut- ters
$20,968 68
Insurance on water carts (collected from contractors) 64 00
Total credit
$21.032 68
.
330
ANNUAL REPORTS.
DEBIT.
Expenditures :-
Charles I. Bucknam, supervising street
watering
$859 17
Teaming
17,013 42
J. L. and H. K. Potter, three new water carts
1,227 50
Repairing carts
1,469 21
Insurance on carts
63 00
Horseshoeing
25 00
Water posts.
162 95
Building water cart shed
117 00
Labor and use of city teams
10 40
Books
28 25
Clerical service, making up assessment list,
91 99
Printing water contracts
5 50
Total debit
$21,073 39
Amount overdrawn
$40 71
Highways, Removing Brown-Tail Moths.
CREDIT.
Appropriation .
$3,000 00
Receipts :-
From Public Grounds account
$7 00
From sundry persons .
534 74
541 74
Total credit
$3,541 74
DEBIT.
Expenditures :-
Labor, removing brown-tail moths from trees
$3,376 78
City teams, use of
187 60
Charles I. Bucknam, supervising work
300 00
Tools
48 53
Stamps
22 00
Creosote
8 25
Total debit
$3,943 16
Amount overdrawn .
$401 42
Highways, Shade Trees.
CREDIT.
Appropriation
$500 00
Transfer from Highways, tree guards
250 00
Total credit
$750 00
DEBIT.
Expenditures :-
For 469 trees
$325 00
Labor, setting trees
395 50
Amount carried forward
$720 50
.
331
STREET COMMISSIONER.
Amount brought forward . Use of city teams .
$720 50
70 85
Total debit .
$791 35
Amount overdrawn
$41 35
Highways, Tree Guards.
CREDIT.
Appropriation .
$1,000 00
Less amount transferred to Highways, shade
trees
250 00
Total credit
DEBIT. $750 00
Expenditures :---
Labor, setting posts and placing netting around trees
$359 50
Posts for tree guards
72 90
Wire netting .
228 50
Lumber
23 49
Tools and hardware
8 75
Wire
1 86
Use of city teams .
18 20
Total debit
$713 20
Balance unexpended
$36 80
Thorndike-street Subway.
CREDIT.
Appropriation :-
Balance January 1, 1904
$1,791 07
DEBIT.
Expenditure :-
Second and final payment on account of construction $2,356 60
Amount overdrawn .
$565 53
Sidewalks Construction Account.
CREDIT.
Appropriation
$10,000 00
Value of materials on hand January 1, 1904 . 146 20 8 25
Net gain on materials
Total credit
$10,154 45
Expenditures :-
For thirty-five sidewalks constructed as per table C
DEBIT.
$25,556 64
Amount carried forward
$25,556 64
1
332
ANNUAL REPORTS.
Amount brought forward
$25,556 64
Less assessments .
12,778 29
Constructing sidewalks as per table D
70 53
Constructing sidewalks as per table E
38 34
Constructing granolithic sidewalk, No. 771 Broadway
46 68
Materials transferred to Sidewalks Main- tenance account
46 00
Total debit
$12,979 90
Amount overdrawn
$2,825 45
.
Sidewalks Maintenance Account.
CREDIT.
Appropriation
$6,000 00
DEBIT.
Expenditures :-
Bricks used in repairing sidewalks
$564 34
Labor
4,822 85
City teams
691 60
Sand and gravel
278 54
Crushed stone
24 61
Stakes
17 38
Books
17 00
Total debit
$6,416 32
Amount overdrawn
$416 32
.
.
$12,778 35
333
TABLE A. Streets Constructed or Partially Constructed in 1904.
STREET COMMISSIONER.
STREET.
FROM
To
CONSTRUCTED WHOLLY OR PARTIALI.Y.
LENGTH IN FEET.
COST.
Bartlett street
Medford street
Broadway
Wholly
730
$808 55
Bowdoin street .
Fremont avenue
Lincoln park
Wholly
94
120 35
Charles street
.
Washington street
Roland street .
Wholly
·
.
.
.
.
410
676 27
Glendale avenue
Cameron avenue
Yorktown street
Wholly
.
196
64 54
Holyoke road
.
.
.
.
.
·
.
1,718
1,356 00
Josephine avenue
Morrison avenue
Broadway
.
.
.
.
1,727
642 33
Line st. .
Washington street .
Cambridge line
.
·
.
.
.
College avenue
Willow avenue
Wholly
1,690
1,086 84
Packard avenue
.
Broadway
Professors' Row
Wholly
908
5,046 33
Length in feet and cost
8,572
$16,880 74
.
·
.
166
63 40
Clarendon avenue
Broadway
Cambridge line
Partially
5,865 52
Eastman road
Highland avenue
Southwesterly end .
Wholly
296
370 48
Hillside park
Walnut street
Estate of Felch & Johnson
Wholly
.
637
780 13
Elm street
Wholly
Wholly
Wholly
Morrison avenue
.
.
.
.
.
.
.
.
·
.
.
.
Elm street
.
TABLE B. Streets Repaired.
STREET.
FROM
To
DESCRIPTION OF WORK.
FEET.
COST.
.
Boston street
.
·
Walnut street .
Easterly .
Re-surfaced
200
$60 58
Bonair street .
. .
.
Holland street.
.
·
·
.
Macadamized
.
1,065
646 95
Central street .
.
· .
Medford street
.
Somerville avenue
.
Macadamized .
560
375 09
Church street .
.
·
Washington street
Somerville avenue
.
·
Macadamized .
1,341
1,738 63
Dane street
.
.
.
.
Northerly
Re-surfaced
500
186 89
Elmwood street
Holland street
.
.
Cambridge line
.
Re-surfaced
1,057
203 19
Everett avenue .
Cross street .
Dana street
Macadamized .
·
565
551 42
Evergreen avenue
Sycamore street .
Dartmouth street
·
.
750
570 35
Flint street
Cross street ·
Aldrich street .
.
.
·
.
.
Lexington avenue
·
·
.
337
440 61
Herbert street .
Day street
.
.
.
Macadamized .
.
.
.
.
·
.
1,083
979 23
Linden avenue .
Elin street .
Summer street
.
.
.
965
193 42
Medford street .
.
Somerville avenue ·
Washington street
Re-surfaced
.
.
.
.
.
Re-surfaced
2,625
220 09
Mystic avenue .
Cross street
Boston line
.
.
Re-surfaced
.
·
283
79 43
Poplar street
Maple street .
Joy street
·
.
.
475
262 09
Richdale avenue
.
Sycamore street
School street .
.
·
.
.
875
956 86
Sanborn avenue
Walnut street
·
.
·
.
275
107 19
Somerville avenue
.
School street .
·
.
.
.
.
.
.
Webster avenue
Cambridge line
.
.
.
.
.
.
Aldersey street
Macadamized .
480
261 28
Walnut street .
Bow Street
Boston street .
.
·
·
1,005
424 15
Washington street
·
Union square .
Cambridge line
.
.
Re-surface d .
2,900
93 30
.
Length in feet and cost
.
.
.
.
·
31,131
$17,036 94
·
.
.
Macadamized .
220
141 79
Chester avenue .
.
Summer street
.
Somerville avenue .
.
Re-surfaced
.
.
1,065
. 507 54
Cameron avenue
.
.
Cross street
.
.
.
.
.
1,535
1,099 80
Walnut street .
.
.
·
·
.
·
Bond street
.
Macadamized .
983
561 38
Laurel street .
Somerville avenue .
Summer street
.
.
Re-surfaced
.
3,855
484 15
Medford street
Gilman square
Magoun square
·
Cambridge line
.
·
Re-surfaced
Re-surfaced
600
676 29
Summer street .
.
Pembroke street
.
.
.
.
Re-surfaced
370
659 42
Tremont street .
.
· Cross street .
·
.
·
Macadamized .
982
1,233 58
Tufts street ·
·
Vinal avenue ·
·
Summer street
·
.
·
.
·
.
.
.
.
Re-surfaced
376
61 33
Hancock street .
Highland avenue
Chester street
Macadamized .
1,005
1,879 86
Jaques street
·
Temple street .
.
.
.
Webster avenue
·
.
.
.
Lowell street
.
.
.
1,365
393 85
Sycamore street
.
Willoughby street
Re-surfaced
589
78 83
Macadamized .
.
.
Warren avenue
Macadamized
Kent street
Central street
Macadamized .
845
908 37
.
Macadamized
Macadamized
.
.
Summer street .
Angle .
.
.
Dartmouth street
Medford street
.
Macadamized
.
334
ANNUAL REPORTS.
Macadamized
Washington street .
Macadamized .
Norfolk street .
.
Cambridge line
TABLE C. Sidewalks Constructed Where the Materials Were Furnished by the City and One-half the Cost Was Assessed Upon the Abutting Estates.
STREET.
SIDE.
FROM
To
FEET OF EDGESTONES.
YARDS OF BRICKS.
COST.
Avon
Southwesterly
Central street
School street
·
.
.
Bartlett
·
.
Both .
.
·
* Beacon
Northeasterly
Ivaloo street
Near Kent street
.
·
.
Both ·
.
.
Boston line .
Cross street
2,120.8
2,308 93
Broadway ·
Southwesterly
Norwood avenue .
Glenwood road
219.1
221 67
Cameron avenue .
Northwesterly
Holland street
·
Southerly end
307.5
.. . .
237 66
*Cedar
.
.
Northeasterly
Herbert street
·
Near Elm street
72.6
60.1
102 28
Chester avenue .
Southerly ·
Medford street
Angle
194.5
....
198 07
Chester avenue
.
.
Medford street
.
Angle
.
....
1,115
Dane .
Southeasterly
.
Somerville avenue
Washington street
1,217.9
....
532 65
Eastman terrace .
Both
Highland avenue
.
Cambridge line
2,040.2
1,617 87
Elmwood
Both
·
Yorktown street .
.
Cherry street
232.3
.
240 56
Hall
.
.
§ Southeasterly
Highland avenue
Lexington avenue
.
·
Northwesterly
·
Elm street
·
.
Elm street
1,374.0
.. . .
1,135 93
Herbert
.
.
.
.
Morrison avenue .
Broadway
3,269.1
·
.
.
Tufts street .
N'ly line estate No. 37
813.2.
. .
681 05
Knowlton
·
2 Westerly ·
·
Sidewalk previously laid
E'ly line of Bing. School
. . . .
102.3
96 88
Lowell
.
.
.
.
.
Crown street
.
...
401.5
356 03
Lowell
North westerly
Highland avenue
Carried forward .
17,184.3
2,038.2
$17,180 20
335
* Where not already laid.
STREET COMMISSIONER.
..
Hancock .
Lexington avenue
·
.. .
625 45
Holyoke road
Both
.
Chester street
.
Day street
319.0
....
256 77
Josephine avenue
Both .
§ Easterly .
.
.
Tufts street .
End of accepted portion S
Southeasterly
·
.
. . . .
861 21
Charles
Both
.
.
Westerly .
Washington street Hall street . ·
.
Summer street
·
108.7
104 47
Chester .
.
·
.
Holland street
.
.
Cameron avenue .
.
850.1
.. . .
625 44
Glendale avenue .
Both
Southwesterly
Cedar street
.
.
304.6
Highland avenue
.
End of street
589.9
....
.. .
.
.
.
.
Northerly .
.
Fremont avenue .
.
Lincoln park
201.6
. .
.
176 38
Bowdoin
.
*Broadway
.
Broadway .
.
1,449.4
....
1,287 97
Medford street
.
346 71
387.4
. . . .
.
Seven Pines avenue
1,010.8
.
188 49
243.0
.
.
.
.
Easterly
2,947 72
.
382.3
.
.
Northerly
950.6
$914 74
TABLE C .- Concluded.
STREET.
SIDE.
FROM
To
FEET OF EDGESTONES.
YARDS OF BRICKS.
COST.
Brought forward
17,184.3
2,038.2
$17,180 20
Milton .
.
.
.
.
·
Orchard street
.
·
Knowlton street .
... .
338.6
76 90
Poplar
.
.
·
Northeasterly ·
School street
·
·
..
307 55
St. James avenue
Northeasterly
Elm street .
·
Montrose street
·
607.9
...
1,652 34
* Washington
Southerly
·
.
·
.
. . .
2,590 32
* Washington
Both
Union Square
·
·
·
·
..
386 27
* Winter
Both
.
.
Bonair street
102.0
929.6
1,048 09
* Wigglesworth
·
.
.
.
.
.
Total
.
24,191.3
4,007.8
$25,556 64
·
·
·
·
Northeasterly
In front of
M. Perry Lowe School.
Joy street
629.3
....
655 71
Richdale avenue
·
.
.
·
. ....
333.4
530 47
Sycamore
§ Easterly
.
·
.
·
Willoughby street Boston line.
1,666.6
.
.
.
.
.
College avenue ·
Holland street
506.9
.
* Where not already laid.
336
ANNUAL REPORTS.
. .
. . . .
290.3
242 83
* Mortou
Both
Glen street '.
·
.
Morrison avenue .
Both
Somerville avenue
·
Sycamore street .
719.2
Summer street
Richdale avenue .
·
.
Westerly
Pembroke street . Opp. Tufts street
Cambridge line
2,775.1
Pearl street .
Both
.
Both
Cambridge line
319 01
77.7
566 95
.
337
STREET COMMISSIONER.
TABLE D. Sidewalks Constructed Where the Bricks and Edgestones Were Furnished by the Abutters.
For
Street.
Yards of Bricks.
Cost to City
Charles Evans
47.5
$23 83
Christopher T. Mc Grath
25-27 1-2 Boston street 274 Washington street
55.3
27 20
D. P. Page and
Katie M. Grimmons
66-68, 70-72 Thurston st.
74.7
19 50
Total
177.5
$70 53
TABLE E. Granolithic Sidewalk Laid (the Edgestones being already set), the Abutters Paying the Excess above the Equivalent of One-half the Cost of a Brick Sidewalk.
For
Street.
Square Yards.
Cost to City.
Jane Cragin
771 Broadway
31.12
$15 56
Harvey D. McGray
769
66
28.55
14 24
George S. Smith
779
28.
14 00
Robert G. Whittier
.
95 Rogers avenue
20.20
10 10
Total
107.87
$53 90
TABLE F. Gutters Paved in Connection with Setting Edgestones.
STREET.
Side.
From
To
Square Yards.
Cost.
Bartlett
Both
Medford street
·
·
·
.
Beacon
Northerly
Ivaloo street .
.
.
.
·
Broadway
Northeasterly
.
.
.
Lincoln park
67.2
91 50
Bowdoin .
Both
.
.
Holland street
·
.
Seven Pines avenue
336.9
514 15
*Cedar
Westerly
Hall street .
.
·
·
.
.
Both
Washington street
Southerly end
85.4
82 88
*Chester
Northerly
Herbert
Day street
24.2
79 15
Chester avenue
·
.
.
Southeasterly
.
Highland avenue .
Southerly end of street
229.4
420 75
Elmwood
Both
.
.
.
.
·
Both
Yorktown street
Cameron avenue
283.4
460 30
Hall
South westerly
Cedar street .
Cherry street
64.5
193 30
Hancock .
Northwesterly
Highland avenue
Lexington avenue .
.
.
.
Chester street
.
Day street
106.3
189 45
Herbert .
Easterly .
.
Elm street
.
.
Elm street again
458.0
811 28
Josephine avenue
Both
Morrison avenue
.
·
.
.
Tufts street .
N'rth'rly line est. No. 37 )
278.9
469 98
Knowlton
·
1 Westerly
Tufts street ·
N'rth'rly line est. No. 32
140.3
354 25
Poplar
.
Northeasterly
School street .
Sycamore street
·
.
239.7
440 98
Montrose street
202.6
374 41
Sycamore
.
1 Westerly
Pembroke street ·
Willoughby street
.
.
.
555.5
1,577 00
* Washington .
.
.
.
.
Cambridge line
925.0
1,756 84
Winter .
·
·
Both
College avenue .
Holland street
.
·
34.0
121 30
Wigglesworth
·
.
Northwesterly
·
Near McGregor Place
Bonair street
Total
.
.
.
8,010
$16,027 35
.
Both
.
Somerville avenue
Washington street
405.9
793 81
Eastman terrace
.
Both
.
.
Holland street
Cambridge line
680.1
1,248 80
Glendale avenue
.
.
.
208 83
Holyoke road .
.
Both
.
Broadway
1,089.7
1,898 50
§ Easterly
.
.
Both
.
Somerville avenue
Joy street
.
.
.
Richdale avenue
.
.
.
Washington .
Southerly
Opp. Tufts street .
.
.
Both .
Union Square .
.
140.8
597 05
.
.
North westerly
.
.
Summer street
36.2
106 11
Charles
.
.
.
Medford street
.
Angle
99.0
264 90
ANNUAL REPORTS.
* Concrete.
338
$918 18
Broadway
563.6
Kent street
129.1
240 26
Boston line .
Cross street .
.
706.9
1,813 39
Fremont avenue .
.
.
.
Cameron avenue
.
.
.
.
.
127.4
.
·
.
.
Richdale avenue
Easterly
Boston line
·
Dane
.
339
STREET COMMISSIONER.
TABLE G. Driveways Constructed at Expense of Abutters.
FOR.
LOCATION.
Samuel W. Armstrong
. 76 Beacon street.
American Tube Works
Dane street. . 355 Lowell street.
Biller Brothers
J. Warren Bailey
58 Dover street.
Eugene Carr
18 Benton road.
E. Floyd De Witt
15 Day street.
Michael Gavin
Walter L. Holmes
. 17 Poplar street. 316 Beacon street. 192 Broadway. 78 Highland avenue.
Frank L. Morse, M. D.
Crocker street.
Thomas W. Sutherland
Frank A. Teele
30 Tufts street. Day and Dover streets. .. 31 Cherry street.
Hattie C. Wheat
Frederick A. Weeks
14 Evergreen avenue.
TABLE H. Driveways Discontinued at Expense of Abutters.
FOR.
LOCATION.
Joseph Gridley