Reports of town officers of the town of Attleborough 1926, Part 10

Author: Attleboro (Mass.)
Publication date: 1926
Publisher: The City
Number of Pages: 258


USA > Massachusetts > Bristol County > Attleboro > Reports of town officers of the town of Attleborough 1926 > Part 10


Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).


Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17


The extension made on South Main Street was to accommodate a new house built by a Mr. Carpenter just below Thurber Avenue on new South Main Street so-called. This work was very special and included changing over a hydrant connection and adjusting an extension to ac- commodate Mr. Carpenter and fit conditions peculiar to the locality.


At Sycamore Avenue the work of placing a six-inch extension was continued from the previous year where it had been left just inside the street line after the tap had been made from Brown Street. Some ledge was encountered in this street and the boulders, roots and other difficul- ties might be included as factors adding to the cost. The relatively long run, however, allowed a chance to compensate for some of these factors


119


ANNUAL REPORT


in making up our unit. A profile for the street was on hand and the engi- neers placed grade lines for the water pipes. This work demonstrates definitely the value of our profile clause.


Several other streets listed, of course, presented their own problems. In looking over all of the work in South Attleboro, I feel that a definite extension program should be followed on plan rather than in short pieces on petition. This is particularly true of water lines in private ways.


At Park and Brook Streets an eight-inch pipe line was carried from the main to the street line in order that it might be clear of the pene- traton road.


At Newport Avenue and Barrows Street our main ten-inch feed line south was placed so that is could be controlled by the City. It is well perhaps to recall at this time that the reason for this expenditure lies in the choice of a lot when the Lincoln School project was taken up. The skewed ten-inch line formerly in use is now abandoned and our main feed line runs down Newport Avenue to Barrows Street and thence through Barrows Street to Washington Street. Arrangements have been made to give adequate fire protection to the Lncoln School by placing large hydrants in the immediate vicinity. The hydrant in the middle of the block of Barrows will be taken care of at once, and at some future date, upon request, it will be possible to project a hydrant branch on the Newport Avenue side of the building which will be fed from the tee Cushion at Barrows Street.


There has been a vast amount of work in these main line extensions, not only in their construction but also in their final choice, due to the difficulties mentioned in the remarks above under the Water Division introduction.


PUMPING STATION


A most favorable coal market held over the major part of 1926. En- tering the year with a favorable coal pile aided in keeping the annual coal bill at the Pumping Staton at its lowest figure in several years. Of course, the British coal strike and the forecasted trouble in our own soft coal fields increased the bill. Much has been said about consoli- dated purchasing of coal by City departments, but a wholesome disregard for correct detail in the suggestion is noted.


Our Engineers' Payroll is slightly in excess of that of 1925 due to emergency over-time which, of course, could not be forseen.


On the pumps a considerable amount of work was necessary. The Barr Pump bearing an 1899 stamp plate, showing its age, had some foot valve trouble which had to be taken care of so that this auxilary unit could be used while the Snow Pump was having necessary repairs made upon it.


Boiler repairs were kept at a low figure and in conjunction with our economy and care of the grounds and filter beds allows our gross figure for the Pumping Station to come reasonably close to that of the previous year in spite of the large pump expenditures.


In summarizing our policies as outlined above during the past year I feel that it is well to recommend:


First: The policy of continuing permanent improvements in drainage, surface and sidewalks on our trunk highways should be maintained and


- - -


120


ANNUAL REPORT


brought to as rapid a completion as is conveniently possible within our financial limits At the same time the policy in force in handling our secondary highways should be continued so that there will be no un- treated road surface within this classification in Attleboro.


Second: Our water guarantees and detailed accomplishment should be co-ordinated to return a fair portion in interest annually on the actual investment.


Third: instead of small pieces of sanitary sewer being constructed at random, a definite policy of extension, either annually or in some other regular period, should be planned to fit in with our other financing.


Fourth: Definite steps to relieve or remove some of the burdens placed upon the City by the A. B. C. Street Railway should be studied.


The year, in spite of the burdens imposed by the many demands made upon this Department, must be considered in its finality as having been very successful from the standpoint of efficient value delivered for every dollar expended. The entire personnel of the Department is ten- dered herewith the sincere thanks of the Superintndent for the excellent efforts they have contributed towards this success


·


Respectfully submitted,


J .O. TABER, Jr.,


Supt. Public Works


121


ANNUAL REPORT


EXPENDITURES, 1926-PUBLIC WORKS DEPARTMENT Charges to December 31, 1926


General Administration


Superintendent's salary


$4,000.00


Engineer's salary, Asst. Engineer and Rodman


6,379.46


Clerical labor


3,336.70


Office supplies


321.43


Engineering supplies


218.36


Insurance, repairs, auto.


1,231.80


Rent, light and telephone


980.97


City survey


. . . .


.


. ....


$16,925.00


Highway Department


Resurfacing


$14,000.00


Bridges


2,700.26


Drains


1,710.35


Ten Mile River


275.00


Traffic painting


205.98


Street sweeping


1,657.31


Street cleaning


4,353.66


Street patching


7,324.77


Sidewalks, repair and maintenance


3,933.25


Snow and ice.


11,761.59


Crushers


933.33


Machinery and tools.


2,000.00


Rollers, coal and maintenance


569.19


Maintenance of autos.


1,350.00


Insurance


942.85


Rent, Maynard Street land.


69.60


Vacations


541.79


Express, freight, etc.


70.67


Sidewalks and curbing


8,471.16


Dust layer and tar.


12,500.00


Incidentals


20.45


5-Ton Mack truck.


5,839.67


11/2-Ton International truck


1,126.37


Tractor


1,251.37


1924 sewers and drains


3,773.02


Oak Street drain


2,589.36


Emory Street drain.


.01


Cambridge Street drain.


158.13


Upland road sewer ..


1,201.47


Bank and Water Street bridges.


36.64


1925 bonded improvement


2,418.57


$93,785.82


Rifle Range


$77.69


Street Lighting


Contract


$36,633.00


New lights


81.23


$36,714.23


Signs, Clocks and Numbers.


$315.52


.


.


.


.


.


.


.


.


. .


. .


. .


. .


. .


.


.


.


.


.


.


.


.


.


.


.


.


.


. . .


.


. ... .


456.28


. .


.


.


122


ANNUAL REPORT


Sewer Maintenance


Filter beds


2,582.11


Repair and care of sewers.


521.51


$3,103.62


Water Maintenance


New meters


$2,000.00


Services


5,750.00


Main line


17,828.92


Shop and barn.


659.81


Maintenance payroll.


8,342.93


Teams and autos


2,199.18


Insurance


681.22


Maintenance material


1,775.01


Incidentals


336.94


Buildings, repairs and paint


.... . 411.25


$39,985.26


Pumping Station


Coal


$3,875.71


Payroll, engineers


7,618.77


Oil


154.62


Snow pump


985.65


Barr pump


308.71


Light and telephone


216.00


Repair of boilers.


90.82


Cleaning filter beds ..


133.85


Care of grounds and beds.


44.11


Incidentals


277.06


A. B. C. Street Railway Maintenance ...


2,768.71


$207,381.15


Resurfacing


Alder


$7.73


Bacon


54.50


Barrows


183.85


Bishop


101.84


Bridge


10.71


Brown


103.67


Brownell


8.05


Clifton


18.63


County


292.88


Handy


236.33


James


200.73


Jewel Avenue


84.35


Linden


2.41


Lindsey


450.20


Locust


84.16


Lord


4.81


Martin


65.19


Mendon Road


1,075.14


Cleaning Mendon Road bank.


6.55


Mulberry


194.40


. . .


. .


. .


. .


.


$13,705.30


...


.


123


ANNUAL REPORT


Newport Avenue.


28.79


Cleaning North Avenue bank


51.83


North Main


7.37


Park-Pine Street to Speedway


4,265.73


Cleaning Park Street bank.


10.30


Parker


33.01


Pike venue


135.97


Pine


52.60


Pond


9.54


Read


81.67


Reynolds Avenue


41.85


Richardson Avenue


274.32


Robert


223.85


Robinson Avenue


10.99


School


88.86


Second


5.36


Slater


8.05


Smith


45.72


South Main gravel blanket "a"-Dubois' to R. R .- R. R. to cemetery switch.


558.96


South Main penetration "b"-Mill yard gate to Dubois' cemetery switch.


2,442.92


Speedway


399.25


Tiffany


99.61


Union road


53.39


Wall


1,025.11


Walter


54.24


West


330.66


West Carpenter


9.54


Wilmarth


47.76


Miscellaneous


55.21


$13,624.59


Emergency: Miscellaneous Washouts, etc.


Labor


$308.47


Material


66.94


.


$375.41


$14,000.00


BRIDGES, FENCES AND CULVERTS


Bacon Street


Labor


$6.92


Bank Street Bridge Approaches-Cleaned up top blanket


Labor


63.50


Cliff Street-Bridge


Labor


$9.82


Material


5.94


Clifton Street-Culvert


Labor


31.45


County Street-Fence and slopes


Labor


30.86


Material


44.19


. .


..


.. .


. .


. .


.. .


. . .


. .


. ..


. . .


. . .


.


15.76


75.05


124


ANNUAL REPORT


Handy Street-Culvert and fence


Labor


32.22


Hebronville-Railroad footbridge


Labor


16.24


Holden Street-Bridge and fence Labor


41.25


Lamb Street-Guard fence


Labor


26.93


Material


5.76


32.69


Lindsey Street-Bridge and approach


Labor


31.85


Material


26.37


58.22


Mendon Road-Bridge


Labor


101.52


Material


233.39


334.91


Newport Avenue-Slopes and Culvert


Labor


104.70


Material


3.78


108.48


Olive Street


Labor


94.61


Material


6.75


101.36


Park Street-Fence


Labor


22.52


Pike Avenue-Brdge


Labor


48.43


Material


127.75


Read Street-Structures


Labor


69.79


Material


6.20


75.99


Smith Street-Guard fence and culvert extension


Labor


43.36


Starkey Avenue


Labor


27.17


Material


206.38


Thacher Street-Culvert


Labor


20.99


Material


42.34


Thurber Avenue-Bridge fence


Labor


43.48


Material


27.69


71.17


Union Road-Guard fence


Labor


36.98


176.18


234.05


63.33


-


ANNUAL REPORT


125


West Street-Culvert


Labor


38.44


Material


89.96


128.40


Wilmarth Street-Guard fence


Labor


48.19


Material


. . . . . . . . . ...


56.93


Fences-General account


Labor


50.50


Material


.. ... . . 428.64


479.14


Bridges-General maintenance


Labor


130.04


Material


264.12


394.16


$2,700.26


DRAIN MAINTENANCE


South Main Street-Dodgeville (raising catch basins)


Labor


$62.33


Material


13.55


Park Street-Drain


Labor


162.01


Material


73.73


235.74


Drain and basin repair


Labor


9.35


Material


55.90


65.25


Cleaning Catch Basins, etc.


Labor


1,040.83


Material


.. .. . 292.65


1,333.48


$1,710.35


TEN MILE RIVER


Labor


230.16


Material


44.84


275.00


TRAFFIC PAINTING


Crosswalks


Labor


112.39


Material


. . . . . . . .


93.59


205.98


. . . . . . . . . . .


8.74


............


$75.88


....


126


ANNUAL REPORT


STREET CLEANING


Gutters and Scraping


Labor


3,589.02 671.14


Material


Outside Roads-Labor and material


4,260.16 93.50


4,353.66


STREET SWEEPING


Labor


1,602.14


Material


55.17


SNOW AND ICE


January 1st to April-snow removal and


sanding (labor and material).


8,218.12


December-Snow removal and sanding ..


1,917.96


Miscellaneous (includes barn, garage and


repair charges, etc.)


1,625.51


11,761.59


MACHINERY AND TOOLS


Keeping tools in repair-labor.


351.69


Keeping tools in repair-material.


443.99


New equipment


1,204.32


2,000.00


CRUSHERS


Labor


637.11


Repairs, maintenance material, etc ......


296.22


933.33


ROLLERS


Labor-Maintenance


187.39


Miscellaneous maintenance material, etc.


381.80


569.19


New Tractor


1,251.37


5-ton Mack Truck (New)


5,839.67


11/2-ton International Truck (and trade) ..


1,126.37


STREET PATCHING (Bituminous and Gravel) Material and Labor Account


131 T. No. 2 Stone at $2.00


213 T. (plus or minus) Pea Stone at $2.50. $794.82


9,809 Gallons K. P. at $.141


500 Gallons Binder "B" at $.126.


1,446.07


Truck and horse operating charges.


411.10


Miscellaneous-sand, gravel and small items. . . 155.86


$2,807.85


Labor


Mixing, placing, handling materials, etc ... . ... . 4,516.92


$7,324.77


1,657.31


127


ANNUAL REPORT


STREET PATCHING (Bituminous and Gravel)


List of Streets Worked On


Alder


Holden


Pike Ave.


Bacon


Holman


Pine


Bank


Hope


Pleasant


Barrows


Horton


Pond


Benefit


Howard Ave.


Read


Bishop


James


Reynolds Ave.


Brown


John


Richardson Ave.


Cambridge


Kendall Ave.


Robert


Capron


Knight Ave. .


Robinson Ave.


Carpenter


Lafayette


School


Charles


Lamb


Second


Claflin


Leedham


Shaw


Clifton


Lexington Ave.


Smith


Colvin


Linden


Solomon


Commonwealth Ave.


Lindsey


South Ave.


County


Locust


South Main


Cumberland Ave.


Lord


Speedway


Dean


Mann


Starkey Ave.


Deantown Road


Maple


Steere


Dennis


May


Sturdy


Dunham


Mechanic


Thacher


Elizabeth


Mendon Road


Third


Emory


Mulberry


Thurber


Falmouth


Newport Ave.


Tiffany


Florence


North Ave.


Turner


Foley


North Main


Union


Forest


Oak


Union Road


Fourth


Oak Hill Ave.


Wall


Gardner


Olive


Walter


George


Orange


Water


Gustin Ave.


Park


Webber Ave.


Handy


Parker


West


Hazel


Pearl


West Carpenter


Hebron Ave.


Peck


Wilmarth


Highland


Perrin


Wolfenden


Highland Ave.


SIDEWALK MAINTENANCE


Labor and Material


Labor


$2,488.43


Repairing cement walks, Olof Pearson.


835.14


Sand and gravel.


53.49


Miscellaneous material


566.19


$3,933.25


--------


128


ANNUAL REPORT


List of Streets Worked On


Bacon


Mechanics


Read


Bank


Mendon Ave.


Robert


Brook


Mill


Robinson Ave.


County


Mulberry


Sanford


Emory


Newport Ave.


South Main


Falmouth


North Ave.


Speedway


Florence


Olive


Tappan Ave.


Forest


Park


Third


Franklin


Park Ave.


Turner


Hebron Ave.


Pearl


Twelfth


Lafayette


Peck


Union


Lindsey


Pine


Upland Road


Maple


Pleasant


Washington


Martin


Railroad Ave.


West


MAINTENANCE OF AUTOS


Operating Expenses-General maintenance $1,350.00


DUST LAYER AND TAR


Oil and Tar:


Labor


$3,107.02


Material


8,293.08


$11,400.10


Sand for Oiling:


Labor


$263.03


Material


836.87


1,099.90


$12,500.00


INSURANCE, FREIGHT AND INCIDENTALS


Vacations


$541.79


Rent, Maynard Street Land.


69.60


Insurance


942.85


Telephone


70.67


Incidentals


20.45


. . .


$1,645.36


OAK STREET DRAIN


Labor


$1,446.72


Material


.


1,142.64


$2,589.36


1924 SEWERS AND DRAINS-(Carried Over)


Dunham Street Drain, No. 2


Labor


$29.19


Material


188.64


$217.83


. .


129


ANNUAL REPORT


Water and West Street Sewer Contract ..


3,357.63


Kendall Avenue Sewer Material 90.80


1924 Sewers and Drains (General Account)


Labor


$62.37


Material


44.39


106.76


$3,773.02


Emory Street Drain (Carried Over) Material .01


Mechanic Street Basin (Cambridge Street Drain-carried over)


Labor


$84.44 73.69


Material


158.13


Goff Street Sewer (Upland Road Sewer-carried over)


Labor


$128.31


Material


60.82


$189.13


Clarence Street Sewer (Upland Road Sewer-carried over)


Labor


224.50


Material


168.89


393.39


Kendall Avenue Sewer-(Upland Road Sewer-carried over)


Labor


$384.19


Material 234.76


618.95


1,201.47


BANK STREET BRIDGE-(Carried Over)


Labor and material-approaches. 36.64


1925 HIGHWAY BONDED IMPROVEMENTS-(Carried Over)


South Main Street, No. 1


Labor-patching sidewalk


$7.56


South Main Street, No. 2 Labor


$285.28


Material


794.23


1,079.51


Morey Street


Labor


$65.38


Material


612.11


Dunham Street


Labor


$63.22


Material


590.79


654.01


677.49


2,418.57


130


SIDEWALKS AND CURBING


Labor


$1,413.69


Material:


1506.25 feet straight curbing


$1,882.81


82.17 feet circle curbing.


154.07


21-2 foot corners. .


105.00


64 bounds . . . . .


179.20


Olof Pearson-contract ... .


4,532.98


Sand


.


. ... ..... .


13.25


Miscellaneous


. . ...... 190.16


7,057.47


$8,471.16


Curbing List:


Streets


Linear Feet


Bicknell


106.08


County


.148.92


Holden


143.87


Lafayette


78.0


Maple


8.6


Mulberry


228.6


Park


146.08


Robert


221.75°


Starkey Avenue


377.06


Summer


289.49


Wolfenden


8.9


Total linear feet set.


1,757.35


Includes returns


STREET LIGHTING


Contract


$36,633.00


New lights


81.23


$36,714.23


SIGNS, CLOCK AND NUMBERING


Signs


New signs, erection, etc. . .. . $121.08


Clock


Care


$52.00


Lighting


62.44


New lamps, etc.


.


. ... 6.60


Numbering


Numbers, etc. 73.40


315.52


RIFLE RANGE


Taxes, pole setting and target charges 77.69


ANNUAL REPORT


-


131


ANNUAL REPORT


SEWERS-OPERATION AND MAINTENANCE


Watchman at Beds.


$1,356.96


Cleaning Beds


Labor


$1,075.96


Material


35.94


1,111.90


Maintaining Sewer System


Labor


$341.40


City of Attleboro-water charge


100.00


Miscellaneous


42.58


483.98


Insurance


54.10


Taxes-Town of Seekonk.


59.15


Miscellaneous


37.53


$3,103.62


HIGHWAY DEPARTMENT Comparison of Itemized Expenditures for 1924-1925-1926


Resurfacing


$19,498.17


1925 $13,705.04


$14,000.00


Construction


24,358.16


2,418.57


Bridges, repairs


2,952.11


2,891.65


2,700.26


Bridges, construction


539.17


2.34


36.64


Drains, maintenance


2,131.55


1,745.07


1,985.35


Drains, construction


16,001.23


7,764.01


2,965.33


Crosswalks


158.43


102.77


205.98


Street cleaning


5,108.77


4,517.64


4,353.66


Street sweeping


2,004.43


1,727.17


1,657.31


Street patching-Tar and gravel ..


8,121.55


6,657.65


7,324.77


Sidewalks, maintenance


3,956.74


3,660.18


3,933.25


Snow and ice.


3,769.36


2,719.87


11,761.59


Machinery


and tools (including


crushers and rollers)


3,874.52


3,701.19


3,502.52


New motor trucks and tractor


8,217.41


Truck maintenance


1,209.48


1,333.49


1,350.00


Insurance, freight, express, etc.


1,897.44


680.50


1,103.57


Vacations


585.45


533.72


541.79


Dust layer and tar


12,399.57


12,515.71


12,500.00


. .


-----


$84,207.97


$88,616.16


$80,558.00


1924


1926


(Land damages and recording not included under "construction" in 1925)


132


ANNUAL REPORT


MAIN LINE EXTENSIONS AND REPLACEMENTS


Street


Foster Street


Length 65 ft.


Size 11/2"


Total Cost $48.56


App. Cost per foot $.75


Bacon Street


48 ft.


6"


182.38


3.80


Chartier Street


228 ft.


6"


445.59


1.95


Clarence Street


324 ft. 6"


6"


662.90


2.01


Edgewood Avenue


240 ft.


6"


397.80


1.66


Fenton Avenue


276 ft.


6"


428.58


1.55


Jessie Ave. (east of Robinson Ave.)


84 ft.


6"


163.59


1.95


Jessie Ave. (west of Robinson Ave.)


572 ft.


6"


1,178.90


2.06


Kendall Avenue


221 ft. 3"


6"


491.51


2.22


Laurier Avenue


267 ft. 6"


6"


593.00


2.22


Mendon Road (relocation)


297 ft. 4"


6"


711.03


2.39


Mendon Road (Achin)


237 ft.


6"


442.91


1.87


Mendon Road (Carufel)


246 ft.


6"


564.73


2.30


Menuier Avenue


186 ft. 3"


6"


476.33


2.56


Morris Avenue


293 ft. 5"


6"


850.10


2.83


Pleasant Avenue


276 ft.


6"


509.18


1:85


South Main Street Extension


119 ft. 6"


6"


451.67


3.85


Sycamore Avenue


1,098 ft. 1"


6"


2,549.44


2.32


Westminster Street


186 ft. 6"


6"


395.73


2.12


Totals


5,201 ft. 4"


$11,495.37


Park and Brook Streets.


29 ft.


8"


$232.11


$8.00


Barrows


Street (replacement)


185 ft. 4"


10"


$994.53


$5.37


Newport Avenue (replacement) .


235 ft. 7"


10"


838.44


3.56


Totals


420 ft. 11"


$1,832.97


SERVICES LAID-1926


Size


1 inch


118


5,367'


$2,445.30


$2,174.20


$4,619.50


$.86


11/2


inch


5


533'


141.75


315.15


456.90


.86


57' 4"-1"


2 inch


3


163' 6"


75.14


153.27


228.41


1.40


6 inch


2


120' 6" Fire Services


443.46


443.46


3.68


Length in


Feet


Cost Main to


Street Line


Cost Street Line


to House


Total Cost


App. Cost per


Foot


No.


133


ANNUAL REPORT


SERVICE REPLACEMENTS-1926


Length in


Feet


Cost Main to


Street Line


Cost Street Line


to House


Total Cost


App. Cost


per Foot


17-1 in. Hannah Peterson, 5


Orange Street


49' 7"


$16.85


$16.40


$33.25


$.67


Horton & Babcock, 69 Dunham Street.


21' 4"


22.04


22.04


1.03


Mrs. Gladys Smith, 167 Dennis Street


45'


25.61


21.86


47.47


1.06


Alphonse N. Thibodeau


54' 6"


16.62


19.04


35.66


.66


17 Horton Street ... Alvah C. Luther, 15 Grove Street


33'


13.17


18.35


31.52


.96


W.m. J. Brown, 78 Peck Street


38' 6"


27.62


14.29


41.91


1.09


Mary S. Davis, 23 Dean Street


24'


11.06


12.08


23.14


.96


Daniel Young, 25 Claf- lin Street


61'


26.87


32.90


59.77


.98


St.


Stephen's


Church,


45'


13.65


17.57


31.22


.69


Eugene Dubeau, 488 South Main Street A. N. Brownell, 11 Orange Street


65'


28.11


17.99


46.10


.71


N. E. Tel. & Tel. Co.,


42' 7"


17.44


17.12


34.56


.81


4,63 Bank Street ..... Samuel A. Gingras, 31 Orange Street.


29'


31.37


7.27


38.64


1.33


55'


18.51


18.51


.34


23' 6"


9.67


9.42


19.09


.81


Ambrose Cerrone, 78-A Forest Street


83'


16.69


38.51


55.20


.67


3-11/2 in. Esther


M. Stone,


31


33' 10"


15.20


22.61


37.81


1.12


Isabella McCaffrey, Park Street


24' 2"


20.10


20.10


.83


John w. Bullock, 19


Perrin Street


39' 2"


24.00


20.75


44.75


1.14


SEWER CONNECTIONS


Total connections January 1, 1926. . 1,435


Buildings served


1,646


Connections added during 1926 .... 83


Buildngs served


84


Total connections January 1, 1927 .. 1,518


1,730


(1 Drain Connection-Plate Realty Company, Forest Street.)


41'


18.10


16.13


34.23


.83


Michael Jarozewski, 92 Robinson Avenue . . Jas. A. Bennett, 11 Foster Street Wm. J. Brady, 110 Knight Ave


49' 6"


22.01


13.83


35.84


.72


Peck Street


South Main Street. .


134


ANNUAL REPORT


STREET LIGHTING


The following is a list of the number and kinds of lights in use Jan. 1, 1927


Kind


Number


Cost


600 C. P.


84


$101.88 each


Sunset to 11:30 P. M.


600 C. P.


29


35.04 each


11:30 P. M. to Sunrise


100 C. P.


59


33.80 each


All night lights


60 C. P.


1,104


22.68 each All night lights


32 C. P.


20


20.00 each


All night lights under rail- road arches


PUMPING RECORDS


Totals per month


Month


Hours Pumping


Coal Con- sumed, Lbs.


Gallons Pumped Venturi Meter


January


391 hrs.


104,843


34,190,000


February


. 355 hrs.


94,395


30,724,000


March


. 387 hrs. 30 min.


101,360


33,413,000


April


.374 hrs.


94,590


32,090,000


May


. 384 hrs.


98,310


32,410,000


June*


389 hrs., 45 min.


101,565


33,634,109


July


408 hrs


106,160


36,985,000


August


403 hrs.


99,030


37,055,000


September


.377 hrs., 30 min.


97,350


35,986,000


October


. 401 hrs., 45 min.


102,165


37,739,000


November*


.390 hrs.


108,115


36,229,837


December


.394 hrs.


103,395


36,028,000


Total


4,655 hrs., 30 min.


1,211,278


416,483,946


*Barr Pump and Snow Pump Working Rotor Pump working in June and July .


PUMPING RECORDS Daily Averages Per Month


Month


Hours Pumping


Coal Con- sumed. Lbs.


'Gallons Pumped Venturi Meter


January


12 hrs. 37 min.


3,382


1,102,903


February


12 hrs. 40 min.


3,371


1,097,286


March


12 hrs. 30 min.


3,269


1,077,839


April


12 hrs. 28 min.


3,153


1,069,666


May


12 hrs. 23 min.


3,171


1,045,484


June*


2 hrs. 59 min.


3,386


1,121,136


July


13 hrs. 10 min.


3,425


1,193,065


August


13 hrs.


3,195


1,195,323


September


12 hrs. 35 min.


3,245


1,199,533


October


12 hrs. 58 min.


3,296


1,217,387


November*


13 hrs.


3,604


1,207,661


December


12 hrs. 43 min.


3,335


1,162,194


Total


12 hrs. 48 min.


3,319


1,140,790


*Barr Pump and Snow Pump working. Rotor Pump working in June and July


COMPARATIVE YEARLY RAINFALL REPORT


1920-1926


19 3


1924


1925


1926


Month


Rain


1921 Rain


1922 Rain


Rain


Snow


Rain


Snow


Rain


Snow


Rain


Snow


January


2.63


3.47


1.36


6.45


27.00


4.32


4.50


3.72


16.75


2.87


5.50


February


4.89


1.61


2.81


1.50


16.00


3.58


10.50


2.08


.25


3.70


21.00


March


4.31


3.20


5.35


3.30


7.00


2.11


14.50


4.97


2.94


5.25


April


5.13


4.71


1.69


5.23


5.87


3.00


2.67


2.10


1.00


May


4.31


2.10


4.61


.90


2.49


1.77


2.91


June


5.72


5.81


9.87


4.04


1.83


1.59


1.82


July


2.00


7.00


6.25


2.48


1.73


5.23


3.41


August


2.73


2.54


6.34


1.80


6.97


1.59


3.58


September


1.61


1.42


2.68


.98


7.93


3.94


1.05


October


1.21


1.16


2.44


4.22


12


3.90


5.32


November


4.67


7.31


1.19


3.74


1.81


.25


4.70


5.47


December


4.01


2.85


2.96


4.91


6.50


1.93


.25


4.35


2.00


2.86


17.25


43.22


43.18


47.55


39.55


56.50


40.69


33.00


40.51


19.00


38.03


50.00


1920


.


ANNUAL REPORT


135


136


ANNUAL REPORT


A. B. C. STREET RAILWAY


Operating Report-January 1, 1926 to December 31, 1926


Receipts:


Interstate Street Railway Company-Fares. $9,492.90


School tickets 796.50


Miscellaneous


61.81


$10,351.21


Expenditures:


Operating expenses (under agreement with Inter- state St. Ry. Co.) ... $8,267.69


Maintenance payroll-labor (track and overhead,


includes snow removal)


1,892.15


Maintenance material 876.56


Operating loss*


11,036.40 $685.19


*This does not include interest charge or retirement of bonds.


A. B. C. STREET RAILWAY Profit and Loss Statement-1926


Credit balance at beginning of year $27,263.97


Credit balance transferred from Income Account. 4,561.33


Balance carried forward to Balance Sheet.


$31,825.30


General Balance Sheet-1926


Investments $33,095.46 Funded debt unmatured $4,500.00


Cash 3,280.47


Accrued interest


.


50.63


....


Profit & Loss (credit)


31,825.30


-


$36,375.93


$36,375.93


Income Statement-1926


Operating Income:


Operating Revenues


$10,553.71


Operating expenses


11,036.40


Net loss on revenue


$482.60


Non-Operating Income:


Appropriated by City of Attleboro


$5,322.46


5,322.46


Gross income


$4,839.77


Deductions from Gross Income:


Interest on funded debt


278.44


Income balance transferred to Profit and Loss. . . $4,561.33


COMPARATIVE A. B. C. STREET RAILWAY SCHEDULE Number of Passengers


Month


Number of Fares 1924


Number of Fares 1925


Number of Fares 1926


School Tickets 1924


School Tickets 1925


School Tickets 1926


Total 1924


Total 1925


Total 1926


January


22,880


21,114


19,618


7,677


3,641


3,936


30,557


24,755


23,554


February


22,043


19,412


16,123


3,511


2,768


1,589


25,554


22,180


17,712


March


17,532


19,443


18,451


4,045


3,776


4,052


21,577


23,219


22,503


April


20,462


18,813


15,874


4,045


2,795


3,158


24,507


21,608


19,032


May


20,429


17,315


15,177


4.340


3,288


3,695


24,769


20,603


18,872


June


18,187


15,341


14,600


3,644


2,593


3,059


21,831


17,934


17,659


July


15,674


15,214


14,455


15,674


15,214


14,455


August


16,100


15,598


14,325


16,100


15,598


14,325


September


16,922


15,171


14,431


3,428


2,834


3,180


20,350


18,005


17,611


October


19,810


16,915


14,414


3,879


4,143


4,190


23,689


21,058


18,604


November


18,452


16,613


14,504


3,170


3,898


4,455


21,622


20,511


18,959


December


20,705


18,930


17,615


3,113


3,168


3,662


23,818


22,098


21,277


Total


229,196


209,879


189,587


40,852


32,904


34,976


270,048


242,783


224,563


ANNUAL REPORT


137


ANNUAL REPORT


OF THE


SCHOOL COMMITTEE


OF THE


CITY OF ATTLEBORO


FOR THE YEAR 1926


140


ANNUAL REPORT


SCHOOL COMMITTEE, 1926


Term expires January


Dr. Reginald P. Dakin ..


1927


Mrs. Lida M. Holbrook.




Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.