Town of Arlington annual report 1915, Part 23

Author: Arlington (Mass.)
Publication date: 1915
Publisher:
Number of Pages: 606


USA > Massachusetts > Middlesex County > Arlington > Town of Arlington annual report 1915 > Part 23


Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).


Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 | Part 18 | Part 19 | Part 20 | Part 21 | Part 22 | Part 23 | Part 24 | Part 25 | Part 26 | Part 27 | Part 28 | Part 29 | Part 30 | Part 31 | Part 32 | Part 33 | Part 34 | Part 35 | Part 36 | Part 37 | Part 38 | Part 39 | Part 40


371


372


ARLINGTON TOWN REPORT


moved. On Grafton Street two large maples were removed from the middle of the sidewalk to the edge.


WIRES.


The condition of the wires through the trees is a very important matter, and we shall always have trouble from burning until they are put underground. I wish to testify to the prompt manner in which the Edison Light Company attends to all complaints. They have been willing at all times to conform to the laws, and to meet the wishes of the Tree Warden. Through the combined efforts of the Tree Warden and the Inspector of Wires, we com- pelled the Bay State Street Railway Company to re-run their wires the entire length of Mystic Street, so that now this line is in a much better condition.


CONCLUSION


I would recommend that $1500 be appropriated this year - $750 for the planting of 300 new trees, to be set on the following streets: Freeman, Melrose, Milton, Varnum, Magnolia, Amsden, Winsor, Trowbridge, Cliff, Draper Avenue, Florence Avenue and Orvis Road; $250 for 400 Lombardy poplars for the New High School lot; and $500 for the removal of dead and dangerous trees, and for the general care and maintenance of existing trees.


The following gives the nature and location of work done the past year :


Labor


Team


Meadow Brook Park


$5.15


Mt. Pleasant Cemetery


5.00


$2.00


Private


2.64


.90


Trimming and Leopard moth


Jason Street, Irving Street, Mt. Vernon Street and private estates


215.87


22.55


Cement and bolting


Maple Street, Chestnut Street, Medford Street, Parmenter School Massachusetts Avenue


10.15


2.29


Watering and reloaming trees


20.61


7.50


Repair tools and guards


19.87


Storm damage


18.28


27.50


Remove and replace tree guards


20.76


9.19


Planting 201 trees


94.00


28.65


Teaming and hauling in trees


3.00


5.25


Removing trees


199.96


62.88


Lost time


3.75


Total


$619.04


$168.71


Receipts.


Appropriation, $1000.


Sale of trees›


$7.80


Transfer


10.00


Receipts from private work


243.62


Appropriation


1,000.00


Total


$1,261.42


Nature


Location


Burning brush


Spraying


Storehouse


373


REPORT OF TREE WARDEN


Expenditures.


Labor


$619.04


168.71


Team hire Supplies


466.33


Total


$1,254.08


Unexpended balance $7.34


TREES REMOVED.


Jason Street


1


Appleton Street.


1


Warren Street


1


Mystic Street.


4


Massachusetts Avenue


7


Medford Street.


4


Wyman Street.


3


Whittemore Street.


1


Pleasant Street.


3


Russell Street


1


Academy Street


1


Orvis Road.


1


Cutter School


1


Grafton Street.


2


Small trees


16


Total 47


TREES PLANTED.


Massachusetts Avenue


7


Mystic Street .


62


Lombard Road


2


Lombard Terrace


3


Pleasant Street.


10


Grafton Street


25


Orvis Road .


8


Everett Street.


32


Henderson Street


2


Marion Road.


3


374


ARLINGTON TOWN REPORT


Teel Street.


1


Harlow Street


29


Brattle Street.


2 4 1


Highland Avenue


Russell Street.


Lewis Avenue.


1


Medford Street


1


Webster Street.


1


Broadway .


3


Wyman Street.


3


Gray Street


1


Total 201


Respectfully submitted,


DANIEL M. DALEY, Tree Warden.


REPORT OF BOARD OF PARK COMMISSIONERS.


ARLINGTON, MASS., January 2, 1916.


The Board of Park Commissioners desire to submit the following report:


There has been little change in the work of the Commission the past year. The principal matter requiring the attention of the Board has been the settlement for land taken on the shores of Mystic Lake for park purposes and turned over to the Metropolitan Park Commission. This Commission having already built part of the Boulevard to subgrade, it looks as if the work might be completed in the near future. The triangles on Medford Street were planted this year, and one hundred 36-inch pines were set out in Menotomy Park. The seedling pines set out in this park a few years ago are growing rapidly and if they are left to grow they will make quite a showing in a few years. To keep this park up, it needs a caretaker about all the time during the summer and fall.


Outside of the planting, the appropriation this year has all been expended in the care of the various parks under our jurisdiction.


Respectfully submitted,


C. H. GANNETT, WILLIAM W. CROSBY, WILLIAM E. LLOYD,


375


REPORT OF BOARD OF PUBLIC WORKS.


-


The Board of Public Works herewith submits its annual report for the year ending December 31, 1915.


At the Town Meeting held on March 1, 1915, Philip Eberhardt, Henry S. Adams and Robert W. Pond were elected members of the Board for one, two and three years respectively. The Board organized on March 1, 1915, with the choice of Henry S. Adams as Chairman.


Mr. Henry W. Hayes, who has given most efficient service to the Town for the past eight years as member of the Board of Public Works, is now Chairman of the Planning Board, the Town thereby continuing to have the benefit of his experience and judgment.


APPOINTMENTS.


At a meeting held March 8, 1915, Harold N. Willis was ap- pointed Clerk of the Board. March 29, Herbert S. Clark was appointed Superintendent of Public Works, George E. Ahern, Assistant Superintendent of Public Works, and Harold N. Willis, Water Registrar and Bookkeeper. These appointments were from April 1, 1915.


MEETINGS.


The regular meetings are held each Monday evening. During the year the Board held fifty-two regular and eight special meetings.


The following are the net expenditures made under the direction of the Board:


Highway Division


$35,891.70


Sewer Extensions


8,768.23


Sewer Maintenance


1,777.68


Water Extensions


11,522.99


Water Maintenance (includes interest, sinking fund and Metropolitan Water Assessment) 61,886.38


Permanent Sidewalks


127.38


New Street Construction


9,483.23


376


377


REPORT OF BOARD OF PUBLIC WORKS


Street Watering


$5,000.00


Hutchinson Road


11.31


Massachusetts Avenue Widening


1,870.80


Storm Drains


3,633.63


Summer Street Extension Construction


8,562.06


Snow and Ice


2,998.20


$151,533.59


HIGHWAY DIVISION.


During the year Jason Street was reconstructed from a point opposite No. 36 to Gray Street; Broadway on the Northerly side from Warren Street to Gardner Street and on the Southerly side from Harlow Street to Marathon Street; and Medford Street on its Easterly side from Lewis Avenue to opposite No. 119. The total cost of this work was $5,000.29.


The following streets were resurfaced at an expense of $2,973.88. Prospect Avenue, Park Avenue to Hillside Avenue.


Hillside Avenue, Prospect. Avenue to Oalkand Avenue, entire width, Oakland Avenue to Florence Avenue, westerly side.


Appleton Street, Florence Avenue to Massachusetts Avenue. Warren Street, Franklin Street to Palmer Street.


River Street, from the Boulevard to the bridge.


In addition to the above, the sum of $8,189.27 was expended on the care and repair of public streets. Under this head is included the cost of tar patching parts of streets that were be- ginning to show undue wear and depressions in the surfaces, thereby improving the surfaces and postponing until some future time the necessity of reconstructing or resurfacing same.


The sidewalks were gone over carefully, in some instances being built up with cinders and elsewhere given a top dressing of fine stone. The cost of this work was $3,077.27.


Owing to the heavy rains in January and July, the storm drains and catchbasins required an unusual amount of attention and more waste material was removed from the latter than has usually been the case.


As there was no appropriation made for permanent sidewalks, what little work was done in this particular had to be paid for out of the Highway appropriation.


378


ARLINGTON TOWN REPORT


There were constructed two short lengths of tar walk, one on Winter Street in front of the Crosby School and the other on Appleton Street near Acton Street. This type of sidewalk can be constructed for about fifty cents per square yard, and the Board recommends that the Town adopt a policy of appropriating a given sum each year for the construction of tar walks.


An appropriation of $1,870.80 was made for the widening of Massachusetts Avenue on its northerly side, between Water and Central Streets, and the relaying of the sidewalks, relocation of edgestone and resurfacing the roadway. The work, owing to the delays caused by the construction of the new stores, the laying of public service conduits, and construction of retaining walls, cost $2,977.60, the excess being taken from the Highway ap- propriation.


The Town appropriated the sum of $5,000 for street sprinkling and treatment for the prevention of dust. In addition to this amount the Highway Department was obliged to draw upon its appropriation to the extent of $2,795.85 to do the necessary amount of work.


Davis Avenue was constructed from the top of the hill to Orient Avenue. Paved gutters were put in on both sides; the cost of this work being $629.83.


Eight streets were accepted by the Town at its March meeting in 1915 and have been constructed at a total cost of $9,483.23. The Board advertised for bids for a portion of this work and received replies from five reputable contractors. None of the bids were accepted, as the Board considered them too high, and it was decided that the work be completed with the town equipment. It is gratifying to be able to state that this work was completed for less money than the offer of the lowest bidder and that the labor was performed by town employees who thus were benefited to the extent of several thousand dollars.


In 1914, believing that a second steam roller would be ad- vantageous and in the end a decided economy, one was hired from the Buffalo Steam Roller Company at a rental of $800 for the season, with the understanding that if same were this year purchased by the Town, the $800 would be considered as partial payment upon the purchase price which was to be $3,600. This


379


REPORT OF BOARD OF PUBLIC WORKS


year the roller, weighing twelve tons, was purchased and the balance of $2,800 paid for same.


Fourteen thousand dollars were appropriated this year towards the construction of Summer Street Extension and work was started in the spring by clearing and staking out the roadway and the construction of storm drains and culverts alongside of and under the street. In August, in response to an advertise- ment of the Board, thirteen contractors entered bids for sub- grading a portion of Summer Street Extension, from Forest Street to the Lexington line. The bid of Francis J. Mague of West Newton, being the lowest, was accepted. In September the Board advertised for bids on the section from Brattle Street to Forest Street. Mr. Mague was again the lowest bidder of nine contractors by $1,090; therefore he was awarded the contract.


The way the work has been handled by the contractor has resulted in many delays. The Board has extended the time of completion of the contract on section one to January 8, 1916, and on section two to December 31, 1915. The indications are that the work will not be completed within the given time and the Town may be forced to look to his bondsmen to complete the contract.


There was appropriated $3,640 for the construction of a storm drain from Highland Avenue Easterly in Massachusetts Avenue to a point beyond the Easterly end of the new High School Building and thence through a 36-inch pipe beneath the High School lawn to an outlet into Mill Brook. The cost of this work was $3,633.63. This gives a storm drain outlet sufficiently large, it is believed, to take care of all development that may in the future come on that section between Bartlett Avenue and Highland Avenue.


The total cost of maintaining the stable teams for the year 1915 was $7,024.82, the average cost of maintenance per working day being $1.75 per horse.


The Board has charged the Health Department for use of a horse $1.55 per day, these horses having cost the Highway Department $1.75 per day, a loss of twenty cents per day has resulted. As the Health Department used the equivalent of one horse for 1900 days, the loss to the Highway Department was $380 for the year.


380


ARLINGTON TOWN REPORT


The value of the property controlled by the Highway Division January 1, 1916, amounted to $21,535.31, classified as follows:


Horses, vehicles, machinery and tools $17,062.21


Buildings and appurtenances 3,100.00


Material available for new work 1,373.10


In addition to the above, material and equipment in charge of the Highway Division owned by the Street Watering Division, amounts to $1169.


The Board recommends to the Town that the sand lot on Mystic Street, near the Winchester line, be sold and a lot near the present Water Works Shop be purchased; new buildings be constructed near Mill Street for all departments so as to con- centrate all the supplies and men at one point in the interest of economy and efficiency.


381


REPORT OF BOARD OF PUBLIC WORKS


TABLE 1. Appropriation for 1915 $35,950.00 Total net expenditure 35,891.70


HIGHWAY DIVISION


Cash balance January 1, 1916


$58.30


Net Expense


Care and repair of streets.


$8,189.27


*Reconstruction of streets


5,000.29


+Resurfacing of streets.


2,973.88


Care and repair of sidewalks.


3,077.27


Construction, care and repair of storm drains and catch basins. Prevention of dust (tar treatment).


2,795.85


Stable and teaming


738.72


Street signs.


449.02


Tools and equipment


4,744.38


House in Town yard.


629.60


Widening of Massachusetts Avenue


1,106.80


Construction of tar sidewalks.


233.91


Construction of Davis Avenue .


629.83


Work outside of division.


47.44


Steam rollers, maintenance and supplies.


262.41T


Material used that was on hand January 1, 1915.


196.34₸


#General expense.


3,817.83


Total.


$35,891.70


*Jason Street, Medford Street, Broadway.


¿Prospect Avenue, Hillside Avenue, Appleton Street, Warren Street, River Street at Boulevard.


1Office, $556.28; salaries, $1,853.38; automobile, $303.02; lost time, $448.81; Town yard, $75.71; pensions, $204.05; miscellaneous, $376.58.


TCredits.


Material on hand January 1, 1915 $1,569.44


Material used that was on hand January 1, 1915 196.34


Material on hand January 1, 1916, available for new work $1,373.10


Unpaid bills due division 670.25


$2,043.35


1,916.36


382


ARLINGTON TOWN REPORT


TABLE 2.


$9,500.00


CONSTRUCTION OF STREETS


Appropriation for 1915 Total cost 9,483.23


Unexpended balance $16.77


Name


Total Cost


Amsden Street .


$789.88


Freeman Street .


1,069.33


Melrose Street .


792.70


Milton Street


794.30


Orvis Road.


4,150.38


Windsor Street.


1,356.78


Woodland Street


283.05


Lincoln Street


246.81


Total


$9,483.23


WIDENING OF MASSACHUSETTS Appropriation $1,870.80


AVENUE FROM WATER STREET Expended TO COURT STREET.


1,870.80


WIDENING AND STRAIGHTENING HUTCHINSON ROAD Balance from 1914 appropriation $11.31


Expended 11.31


STREET WATERING AND TREATMENT FOR PREVENTION OF DUST Appropriation for 1915 $5,000.00


Expenditure 5,000.00


With water $173.60


With oil


2,100.31


With tar


2,726.09


$5,000.00


383


REPORT OF BOARD OF PUBLIC WORKS


TABLE 3. PERMANENT SIDEWALKS.


Transfer from Emergency Fund, Committee of Twenty-one


$127.38


*Net expenditure


*Expended prior to March Meeting.


Appropriation for 1915


$3,640.00


Expenditure


3,633.63


STORM DRAINS


Cash balance January 1, 1916 $6.37


Massachusetts Avenue from Highland Avenue easterly 854 feet 18-inch pipe, thence northerly 54 feet 24-inch pipe laid in duplicate, and 491 feet 36- inch pipe to an outlet into Mill Brook.


SUMMER STREET EXTENSION Appropriation


$14,000.00


CONSTRUCTION


Expended during year 8,562.06


Cash balance January 1, 1916 $5,437.94


Appropriation for 1915


$3,000.00


Expended


2,998.20


SNOW AND ICE


Cash balance January 1, 1916


$1.80


SEWER DIVISION.


The demand for sewers is increasing rapidly and the time has arrived at which the cost of sewers required is greater than can be paid for out of the sewer assessments collected the previous year. Therefore the Board recommends that bonds be issued for the extension of the sewerage system. The Board further believes that the construction of sewers this year is imperative to take care of Sylvia Street, Hibbert Street, Lancaster Road and adjacent streets, also in the area east of Mystic Street and south of Fairview Avenue, and that the cost of this construction be paid for from the sale of bonds. There are other districts in the Town which will require extensions in the near future.


Reference to Tables 4 and 5 will show the details of construction and maintenance for 1915.


Six thousand, five hundred and ten feet of main sewer were laid at a total cost of $7,368.91.


127.38


384


ARLINGTON TOWN REPORT


Two hundred and twenty-one house connections have been made with the mains at a total cost of $5,557.13, cost per foot, 54 cents.


The total cost of maintenance for the year was $1,777.68.


The value of property controlled by the Sewer Division January


1, 1916, amounts to $3,225.11, as follows:


$504.69


Buildings and appurtenances


400.00


Two pumping plants


1,900.00


Material available for new work


420.42


TABLE 4.


Appropriation for 1915


$8,787.80


Net expenditure


8,768.23


SEWER CONSTRUCTION.


Cash balance January 1, 1916


$19.57


LOCATION


Size of Pipe in Inches


Length in Feet


Net Cost


Cost per Foot


Highland Avenue (old end of main to Gloucester Street)


10


186.05


$404.36


$2.17


Lafayette Street (old end of main to Park Boulevard) . .


8


388.


134.16


.35


Lake Avenue (Park Boulevard to Fairmont Street).


8


142.5


51.53


.36


Massachusetts Avenue (Magnolia Street to Melrose Street)


8


593.25


601.18


1.01


Meadow Brook (Mystic Street by private lands to Davis Avenue)


15


1,633.9


2,698.06


1.65


Oxford Street (Raleigh Street southerly)


8


329.2


205.18


.61


. Peirce Street (Clark Street westerly) .


8


87.2


233.11


2.68


Park Boulevard (Lafayette Street to Lake Avenue).


8


454.3


233.58


.51


River Street (Warren Street to Decatur Street)


10


1,578.8


1,797.93


1.14


Summer Street (Grove Street westerly)


8


430.8


335.03


.78


Temple Street (old end easterly)


8


103.6


96.20


.93


Warren Street (Rawson Road to River Street)


8


582.8


578.59


.99


Totals


$7,368.91


*General Expense


1,603.36


Work done for private parties.


6.62


Material purchased during year but not used .


215.70


Particular Sewers


+426.36


Total.


$1,399.32


Grand totals


6,510.4


$8,768.23


*Office, $450.51; salaries, $821.64; tools and equipment, $85.17; miscellaneous, $1.32; automobile, $200; lost time, $44.72. +Credit.


Material on hand January 1, 1915.


$204.72


Material purchased during year but not used.


215.70


Material on hand January 1, 1916, available for new work.


$420.42 132.99


Unpaid bills due division .


$553.41


Tools and equipment


385


REPORT OF BOARD OF PUBLIC WORKS


TABLE 5.


SEWER DIVISION MAINTENANCE


Appropriation for 1915 $1,350.00


Transferred from Emer- gency Fund of Com- mittee of Twenty-one. 430.00


Total available for 1915 $1,780.00


Net expenditure 1,777.68


Cash balance January 1, 1916 $2.32


Net Expense


Repairs on sewer mains.


$73.24


Brattle Street sewer pump.


234.96


Grove Street sewer pump.


388.48


Care and repair particular sewers.


286.94


Cleaning and flushing sewers.


683.87


Work done for private parties


9.66


*General expense.


100.53


Total


$1,777.68


*Office, $19.09; yard, $6.05; salaries, $7.50; miscellaneous, $15.51; tools and equipment, $50.13; lost time, $2.25. Unpaid bills due division, $36.81.


SUMMARY OF SEWERAGE STATISTICS.


GENERAL.


Population by census of 1915, 14,860.


Total area of city or town, 5.5 square miles.


Area served by sewerage system, 2.5 square miles.


COLLECTION SYSTEM.


For sewage only, 35.5 miles, includes 3.47 miles Metropolitan sewer.


For sewage and surface water, 0 miles.


For surface water only, 9.53 miles.


Method of disposal: sewerage into Metropolitan sewer, surface water into brooks.


COLLECTION. Mains. (Everything but house and catch basin connection.)


For Sewage only Water only


1. Lineal feet pipe


187,413 feet


49,131 feet


2. Lineal feet extended during year


For Surface


6,510 feet 1,660 feet


386


ARLINGTON TOWN REPORT


3. Number of inverted siphons, 2.


4. Number of manholes, 733.


5. Method of flushing. Water service at manholes end of lateral lines.


6. Method of cleaning. By special brush drawn from manhole to manhole.


7. Number of automatic flushing tanks, 0.


8. Number of direct connections with water mains for flushing, 34.


9. Number of flushings of entire system during year, 1.


10. Cost of flushing per mile, $10.69.


11. Cost of cleaning per mile, $10.69


12. Number of stoppages, 1.


13. Method of ventilation, manhole covers.


14. Miles of permanent undermains, 3.


HOUSE CONNECTIONS.


1. By whom made, Sewer Division, Board of Public Works.


2. Sizes, 5, 6 and 8 inches.


3. Number made during year, 221.


4. Lineal feet laid during year, 10,292.


5. Lineal feet discontinued during year, 445.


6. Total miles in use, 20.75.


7. Average cost per foot, connections made during year, 54 cents.


8. Number of stoppages coming to attention of department, 48.


CATCH BASINS.


1. Number, including inlets, 417.


2. Number cleaned, 1198.


3. Average amount material removed per basin, 3 cubic yards.


4. Cost of removing material per cubic yard, 45 cents.


5. Cost of removing material per catch basin per year, $3.89.


DISCHARGE OF SEWER.


1. Estimated population using sewer system, 12,800.


2. Number of buildings connected, 2,046.


3. Daily discharge for year.


4. Daily discharge for each user.


5. Daily quantity of factory waste.


6. Daily leakage into sewers.


7. Daily leakage per mile of sewers.


8. Are quantities given under three to seven estimated or measured


NOTE: See Metro- politan Sewerage Board Report.


387


REPORT OF BOARD OF PUBLIC WORKS


GENERAL.


Total cost of collecting mains, $320,648.67.


Bonded debt at date, $116,500.


Value of sinking fund at date - general.


Average rate of interest on bonds, 4 per cent.


Proportion of cost of system assessed on abutters, 45 per cent. Yearly assessment for maintenance, none.


Method of assessing abutters and rate of assessment, as fixed by Acts of 1896, Chap. 282, is 28 cents per lineal foot frontage and 52 to 100 cents per square foot for area within 100 feet of street line.


FINANCIAL - CONSTRUCTION.


Receipts.


Appropriation from public funds


$8,787.80


Stock on hand January 1, 1915


204.72


House Connections


5,557.13


$14,549.65


Expenditures.


Mains


$7,368.91


House connections


5,130.77


General expense


1,603.36


Stock on hand January 1, 1916


420.42


Work for private parties


6.62


Balance, cash on hand January 1, 1916.


19.57


$14,549.65


MAINTENANCE AND OPERATION.


Receipts.


Appropriation from public funds


$1,780.00


Expenditures.


Repairs


$286.94


Brattle Street Sewer Pump


234.96


Grove Street Sewer Pump


388.48


Cleaning and flushing sewers


683.87


Work for private parties


9.66


General expense


173.77


Balance, cash on hand January 1, 1916


2.32


$1,780.00


388


ARLINGTON TOWN REPORT


WATER DIVISION.


Nine thousand, two hundred and thirty feet of water mains were laid during the year at a total cost of $9,954.99 and con- nected with the Metropolitan system. Two hundred and ninety- nine feet of main were added to the Reservoir system at a cost of $363.04. Details of this construction can be found in Table 6.


The total value of the property controlled by the Water Divi- sion January 1, 1916, amounts to $9,839.47, of which $5,508.75 is invested in building equipment and tools, and $4,330.72 in material available for new work.


SERVICES.


Two hundred and fifty-three new services have been added during the year and 22 services abandoned. There are for all purposes 1569 services on the low, 1227 on the high and 12 on the Reservoir system. On the Metropolitan water supply there are 21 services for municipal buildings, included in the above, 22 for street watering standpipes and 33 for sewer flushing purposes. On January 1, 1916, 113 services were temporarily out of use. Thirteen services inside the street line were replaced with cement- lined pipe at the expense of owners.


METERS.


Two hundred and twenty-four meters were set on services in- stalled during 1914 and 1915. One meter was set on service which was previously laid, making the total number of meters set this year, 225. The total number of meters in use January 1, 1916, is 2765.


LOW SERVICE SYSTEM.


HIGH SERVICE SYSTEM


RESERVOIR SYSTEM. -


Size


Cement-lined Pipe.


Cast-iron Pipe.


Cast-iron Pipe


Cement and Cast-iron Pipe.


Inch


Length Feet


Hyd.


Gates


Length Feet


Hyd.


Gates


Length Feet


Hyd.


Gates


Length Feet


Hyd.


Gates


12


.... .


.. . .


. . .


·


.


.


.


.


8,530


10


. . . . ·


. . . .


. .


. .


. . . .


. . . .


..


. .


.


. .


8


. . . .


·


. .


. . . .


... .


. . . .


. . . .


. . . .


. .


6


634


4


2320


. . . .


·


.


. .


.


.


.


. . ..


Total


2954


3


5


106,900


201


184


#128,284


255


229


13,125


12


12


.


. .


.


.


. .


. . . .


74,921


. . . .


. . . .


1,129


. . . .


. . .


11,794


1,497


1,620


..


11,210


17,002


270


21,955


17,519


1,576


55,150


6,791


17,345


.


REPORT OF BOARD OF PUBLIC WORKS


389


390


METERS SET ON SERVICES DECEMBER 31, 1915.


Kind


5/8-inch


34-inch


1-inch


11/2-inch


2-inch


3-inch


4-inch


6-inch


Total


Lambert .


1607


16


16


5


1


. . . .


. . . .


. .


429


Trident!


358


55


14


2


. .


Empire :


491


18


11


2


6


1


1


. . . .


59


Split Case.


59


..


.


1


49


Hersey .


7


8


11


10


12


Nash. .


5


. .


2


1


5


4


. .. .


. . . .


. . . .


3


Worthington.


3


. . . .


·


. . . .


.. ..


....


.. . .


.. .


3


Keystone.


3


. . . .


. . . .


. .


. . .


.


. . . .


. . . .


11


American. .


1


. . . .


.


·


.


. . .


.


.


.


.


Total:


2536


99


69


28


29


2


1


1


2765


ARLINGTON TOWN REPORT


.


. .


.


.


. . . .


.


. .


4


6


1


Compound .


. . . .




Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.