Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 | Part 18 | Part 19 | Part 20 | Part 21 | Part 22 | Part 23 | Part 24 | Part 25 | Part 26 | Part 27 | Part 28 | Part 29 | Part 30 | Part 31 | Part 32 | Part 33 | Part 34 | Part 35 | Part 36 | Part 37 | Part 38 | Part 39 | Part 40
During the year a careful study has been made of each building by the School Committee, together with the fire chief and the town building inspector, and a report was presented at the special Town meeting in December of several things that might be done for further protection of life and property. The Town, at the meeting just mentioned, voted enough money to install six fire boxes on school buildings. The Committee proposes to ask the Town for continued appropriations to complete this safety program.
The new building on land adjacent to Fessenden Road (Junior High School-West) was completed shortly after the school year began in September and the Building Committee allowed occupancy of the building on September 26, although it had not been officially accepted by the Town. On Decem- ber 8, the building was formally turned over to the Town, through the Chairman of the Board of Selectmen, and by him turned over to the School Department. The outside premises are still in the care of the Building Committee, since the grading is not yet completed.
The school housing situation is as follows: The High School is the largest in its history and the building is nearly filled. In the very near future something must be done for its relief. The Junior High School-Center is not full to capa- city and the two-room portable at that site is not in use at present, neither is the Junior High School-West full to capacity. It is hoped that another school year we shall be able to utilize our housing resources at the two Junior High Schools more intensively so as to afford relief where it is most needed.
By means of a modified platoon system all of the ele- mentary buildings except the Russell are caring for more pupils than the buildings were designed to accommodate. Even basements and assembly halls are in constant use. The Crosby School with sixteen ordinary class rooms has twenty classes ; the Parmenter with five rooms has six classes ; the
268
ARLINGTON TOWN REPORT
Locke with sixteen rooms has twenty classes; the Cutter with eight rooms has fourteen classes.
This brief summary of conditions shows that the proper housing of our school population is a very serious problem, especially in view of an anticipated annual increase of not less than 200, during the next several years. It is evident that in the near future the Town of Arlington will be called upon to consider the building of additional school accommodations.
In conclusion, it may be said, that the Committee has under consideration a number of matters intended to increase the efficiency of the school system, both educationally and in the matter of business administration.
Respectfully submitted,
MYRON W. DOLE, Chairman.
269
SCHOOL COMMITTEE
STATISTICS FOR THE YEAR 1920-1921
SCHOOLS AND TEACHERS
GRADES
Enrolled
for Year
Average
Membership
Average
Daily
Attendance
Per cent of Attendance
HIGH SCHOOL.
IX-X-XI-XII
682
660.6
624.9
94.6
JUNIOR HIGH SCHOOL.
VII and VIII. .
502
474.4
448.7
94.6
CROSBY SCHOOL.
Carrie L. Minott. .
VI
35
34.4
32.9
95.6
Bertha M. Wright.
VI.
35
32.1
30.3
94.4
Marjorie H.Davenport
VI
36
31.5
29.8
94.6
Ursula B. Hanna.
V
36
32.1
30.5
95.0
Alice W. Collins
V
32
30.2
28.9
95.7
Jennie M. Cottle.
V
31
30.1
28.8
92.3
Ethel G. Higgins
IV.
42
37.5
35.7
95.2
Mildred A. Evans.
IV
41
38.6
36.3
94.0
Josephine Goldsmith.
III
41
39.7
38.3
96.5
Jennie E. Wallace.
III
44
40.2
37.9
94.2
Sara M. Henderson. .
II
38
34.8
32.5
93.4
Cathlene McQuiston. .
II
39
37.2
34.9
93.8
Elizabeth L. Holton. .
II
39
33.6
31.5
93.8
Gertrude L. Toomey ...
I
35
30.9
28.9
93.5
Frances E. Kelley.
I
33
30.7
28.3
92.1
Rachel H. Haynes.
I
33
31.1
29.1
93.6
Ellen E. Sweeney
Sub-primary .
40
36.2
32.1
88.7
Annie W. Cobb
Sub-primary
41
36.3
33.0
90.9
Helen M. Warren.
Sub-primary .
42
35.8
31.9
89.1
713
653.0
611.6
93.7
CUTTER SCHOOL. .
Edith P. Willey.
VI
23
24.4
23.4
95.9
Dorothy MacPeck.
VI
22
18.0
17.4
96.7
Doris P. Robinson
V
27
26.8
25.7
95.9
Charlotte Blanchard. .
V.
30
26.4
25.6
96.9
Olive Stratton
IV
38
39.6
37.9
95.7
Ruth J. Blood
III
28
26.7
25.7
96.3
Ruth J. Loring
III
31
27.1
25.9
95.6
L.Francis F. Knowles.
II
20
20.4
18.9
92.6
Ethel Dudley.
II.
24
21.9
20.7
94.5
Hattie E. Baker
I
31
28.3
26.9
95.1
Arline Avery .
I
29
27.5
25.9
94.2
Annie B.E. Knowles. .
21
21.8
20.5
94.0
Ida C. Hunt
Sub-primary
30
22.3
20.4
91.5
354
331.2
314.9
95.1
Sub-primary .
. .
270
ARLINGTON TOWN REPORT
STATISTICS FOR THE YEAR 1920-1921
SCHOOLS AND TEACHERS
GRADES
Enrolled
for Year
Average
Membership
Average
Daily
Attendance
Per cent of Attendance
LOCKE SCHOOL
Agnes E. O'Brien
VI
40
37.7
35.9
95.2
Bessie J. Dowse ..
VI
39
38.2
35.9
93.9
Alice M. Philbrick.
V.
40
38.2
35.7
93.5
Helen Roberts. .
V
42
38.9
36.5
93.8
Ednah A. Warren
V.
38
37.7
34.8
92.3
Bertha W. Richards.
IV
29
27.7
25.9
93.5
Corla M. Nelson.
IV.
36
34.5
31.3
90.7
Edna MacArthur
III
43
44.1
40.8
92.5
Miriam Braley.
III
40
38.9
35.8
92.0
Florence W. Cromwell
II
31
28.3
26.2
92.6
Mary J. Cannon
II
27
27.6
25.3
91.7
Carrie L. Horr.
II
29
27.5
25.8
93.8
Amy D. Young
I.
35
28.1
25.7
91.5
Juliette H. Howard.
35
33.1
30.9
93.4
Ethelyn M. Brown
32
32.3
28.9
89.5
Cecilia A. Welsh
Sub-primary
29
22.1
19.2
86.9
Helen P. Rhodes.
Sub-primary.
30
25.0
22.2
88.8
Lillian M. Lyons. .
Sub-primary . . .
27
22.5
20.6
81.5
Myrtle M. Davis.
Sub-primary .
25
24.4
21.4
87.7
Anna D. Shaw.
Special.
2
11.2
10.0
89.3
649
618.0
568.8
92.0
PARMENTER SCHOOL
Helen I. Taylor. .
V.
37
34.5
32.2
93.3
Helen Drawbridge.
IV
39
37.4
35.4
94.6
Vera E. Libby .
III
29
27.9
26.1
93.5
Mary F. Good. .
II.
37
34.3
31.5
91.8
Grace B. Tibbetts.
I.
37
33.9
30.4
89.7
Helen M. Dow
Sub-primary
38
34.9
31.3
89.7
217
202.9
186.9
92.1
RUSSELL SCHOOL
Helen M. Fogg.
VI
44
42.1
40.5
96.2
Sarah L. Gifford.
VI.
44
38.8
36.8
94.8
Loretta A. Brandon.
V.
25
23.7
22.4
94.5
Nellie A. Grimes.
V.
27
24.2
22.7
93.8
Mabel C. Pond .
35
37.1
35.8
96.5
Margaret B. Condon
III
46
39.3
37.6
95.7
Grace M. Meserve. .
30
28.3
26.5
93.6
Mary A. Chater
I.
32
29.7
28.1
94.6
Elizabeth A. Day
Sub-primary
46
38.7
34.9
90.2
Myrtilla I. Tuck
Special. .
16
15.9
14.7
92.5
345
317.8
300.0
94.4
Totals and Averages. .
3462
3257.9
3055.8
93.8
I
I.
IV
II.
271
SCHOOL COMMITTEE
AVERAGE MEMBERSHIP ARLINGTON PUBLIC SCHOOLS (Year Ending June)
Year
Russell and Parmenter
Crosby
Cutter
Locke
Junior High
High
Total
1911
622.6
390.7
301.1
496.0
372.0
2182.4
1912
595.2 .
446.4
290.1
439.7
400.0
2221.4
1913
583.3
472.5
303.0
522.3
454.4
2335.5
1914
591.3
562.3
318.3
583.1
498.0
2553.0
1915
607.4
622.8
307.3
631.9
548.9
2718.3
1916
511.8
584.1
302.8
583.0
391.9
639.8
3013.4
1917
542.3
603.2
310.9
597.3
436.3
644.8
3134.8
1918
517.8
686.3
337.3
608.4
418.8
596.7
3165.3
1919
532.5
674.1
345.8
611.0
449.2
595.1
3205.7
1920
532.8
674.8
341.9
598.9
495.7
611.2
3255.3
1921
520.7
653.0
331.2
618.0
474.4
660.6
3257.9
1921*
527.1
606.8
380.2
653.7
557.6
768.9
3494.3
*Fall Term
REPORT OF BOARD OF PUBLIC WORKS
The Board of Public Works herewith submits its annual report for the year ending December 31, 192I.
.At the Town Meeting held on March 7, 1921, Loren W. Marsh was elected member of the Board for the term of three years to succeed himself. The Board organized on March 7th with the choice of Clarence A. Moore as Chairman.
APPOINTMENTS
At a meeting held on March 8th, George E. Ahern was appointed Superintendent of Public Works. April 4, Harold N. Willis was appointed Clerk of the Board, Water Registrar, Purchasing Agent and Bookkeeper. These appointments were for the year ending April 1, 1922.
MEETINGS
The meetings are held Monday evenings. During the year the Board held forty-seven meetings.
The following are the net expenditures made under the direction of the Board :
Highway Division
$91,274.35
Sewer Extensions
27,192.22
Sewer Maintenance
5,984.23
Water Extensions
13,327.II
Street Construction
4,590.86
Water Maintenance (includes interest, Town Debt and Metropolitan Water Assessment)
79,429.73
Health Department
34,490.79
Snow and Ice
4,914.40
Grading Playground at Crosby School
854.46
Storm Drains
7,402.40
$269,460.55
HIGHWAY DIVISION
The reconstruction of Massachusetts Avenue, begun in 1917, was continued this year. With the $15,000.00 appro- priated for reconstruction work, a section 797 feet long and 24.3 feet wide, on the north side, between Everett and Tufts Streets and a stretch 600 feet long and 23.5 feet wide on the north side between Palmer and Franklin Streets ;was laid by
272
273
REPORT OF BOARD OF PUBLIC WORKS
Simpson Brothers Corporation, of the type of construction known as the Hassam Compressed Concrete Pavement. " On the north side, a section 692 feet long and 13.3 feet wide from Schouler Court to Grove Street was constructed by John Gaf- fey, using the Asphalt Macadam Penetration Method.
Five years have elapsed since this reconstruction work started and but one-fifth of the Avenue has been covered. It does not take much of a mathematician to figure out that unless larger yearly appropriations are available, it will take twenty years to complete the work. It costs an average of $4,500 per year to maintain the old surface. Each new section reconstructed reduces this maintenance cost, as reconstructed sections require no tar treatment and practically no upkeep.
The Board has requested for 1922 an appropriation of $30,000 for reconstruction of streets, believing that the expend- iture of such a sum this year is necessary.
With the $7,500 available for that purpose, storm drains were constructed on the north side of Massachusetts Avenue from Pond Lane to Franklin Street, and from Harlow to Eve- rett Streets. This work was done in conjunction with the reconstruction of the street. Storm drains were also laid in Everett Street and Broadway.
Each heavy rainfall emphasizes the need of more storm drains. The Town's streets, being hard surfaced, no longer absorb water, causing flood conditions in many sections not provided with a drainage system. The storm drains in Orvis Road have been proven inadequate to cope even with the water from a smart shower and the Board feels that the situation there should be immediately remedied. An appropriation of $25,000 for 1922 is requested for the extension of storm drains.
The sidewalks and streets suffered tremendously, as did those of other towns in our immediate vicinity, from the deluge of July 9th. Naturally sidewalks on the hill streets suffered the most and their repair used up so much of the Highway appropriation available for sidewalk work, that of necessity many much needed repairs, especially to the old permanent tar walks had to be abandoned. It is proposed, if the appropri- ation requested for 1922 is given, to repair many permanent walks now 'badly cracked.
The construction of Bowdoin Street, for which an appro- priation was made by the Town at the March Meeting, was placed in the hands of this Board by the Joint Board of Select- men and Board of Public Works. Bids were invited on this work and were received from five contractors. That of Cole- man Brothers was the lowest and the work was awarded to
274
ARLINGTON TOWN REPORT
them and was performed in a satisfactory manner under the supervision of the Town Engineer.
Reference to Tables I and 2 will show the details of main- tenance, construction and snow and ice expense.
The value of the property controlled by the Highway Division, January 1, 1922, amounted to $37,614.20, classified as follows :
Horses, vehicles, machinery and tools
$27,345.27
Buildings and appurtenances
9,000.00
Material available for new work
1,268.93
TABLE 1
Appropriations made for 1921
$94,000.00
HIGHWAY DIVISION
Total net expenditure
91,274.35
Balance January 1, 1922
$2,725.65
Net Appropriation
Net Expense
Balance
Care and repair of streets .
$23,000.00
$22,661.30
$338.70
Care and repair of sidewalks
9,500.00
9,248.16
251.84
Care and repair of storm drains and catch basins.
5,500.00
4,948.33
551.67
Tar treatment and prevention of dust. .
18,000.00
17,704.41
295.59
Care and purchase of horses and teams.
1,000.00
776.52
223.48
Street signs. .
500.00
486.92
13.08
Tools and equipment.
4,000.00
3,996.01
3.99
Repairs and maintenance of buildings TownYard
2,000.00
1,517.53
482.47
Stock account.
500.00
457.91
42.09
Reconstruction of Massachusetts Avenue.
15,000.00
14,997.17
2.83
*General expenditure account.
15,000.00
14,480.09
519.91
Totals
$94,000.00
$91,274.35
$2,725.65
*Automobiles, $1,980.08; office, $751,56; engineering, $415.72; miscellaneous, $1,450.74; holidays, $1,600.07; vacations $2,373.67; Saturday afternoons, $4,368.25; salaries, $1,540.00.
Material on hand January 1, 1921.
$1,226.84
Material purchased during year but not used .
42.09
Material on hand January 1, 1922, available for new work
$1,268.93
REPORT OF BOARD OF PUBLIC WORKS 275
TABLE 2
Appropriation for 1921 Expenditure
$7,000.00
SNOW AND ICE
Balance January 1, 1922
$2,085.60
STREET CONSTRUCTION BOWDOIN STREET
Appropriation Expenditure
$5,135.60
3,501.73
Balance January 1, 1922
$1,633.87
STREET CONSTRUCTION HARLOW STREET
1,089.13
Balance January 1, 1922
$76.21
GRADING PLAYGROUND AT THE CROSBY SCHOOL
Appropriation Expenditure
854.46
Balance January 1, 1922
$645.54
$7,500.00
STORM DRAINS
Appropriation Expenditure
7,402.40
Balance January 1, 1922
$97.60
LOCATION
Size of Pipe in Inches
Length in Feet
Net Cost
Cost per Foot
Massachusetts Avenue (north side from opposite Pond Lane to Franklin Street.
15
1,132
and from Harlow Street to Everett Street)
10
34
$4,570.79
$3.92
Everett Street (Broadway to Raleigh Street) .
15
691
10
39
1,978.21
2.71
Broadway (South side Everett Street to Grafton Street and across to northern side)
15
26S
853.40
3.18
Total
2,164
$7,402.40
NOTE: A storm drain of 15-inch and 10-inch pipe, 399 feet long was constructed in Harlow Street. See Street Construction.
1
4,914.40
$1,165.34
Balance January 1, 1921 Expenditure
$1,500.00
276
ARLINGTON TOWN REPORT
HEALTH DEPARTMENT
Thirty-four thousand five hundred dollars was appropri- ated for the collection of ashes, rubbish and offal.
During the year the equivalent of nine thousand five hun- dred and fifteen single cartloads of ashes were collected and hauled to various dumps, an increase of three per cent over the previous year. One thousand three hundred and eighty- one wagonloads of waste material were collected and deposited, an increase of about twenty-one per cent. Four hundred and nine cords of garbage were collected, an increase of over five per cent.
Details of this work will be found in Table 3.
TABLE 3
Appropriation for 1921 $34,500.00
HEALTH DEPARTMENT
Expenditure 34,490.79
Balance January 1, 1922
$9.21
Net Expense
Offal
$14,508.57
Ashes.
13,996.23
Paper and rubbish
4,812.83
Superintendence
613.22
Repairs.
344.91
Supplies and sundries
215.03
Total
$34,490.79
277
REPORT OF BOARD OF PUBLIC WORKS
SEWER DIVISION
Four thousand five hundred and thirteen feet of main sewer were laid during the year and one hundred and thirty- three connections were made with the mains. Details of this work, together with the cost of maintenance, will be found in Tables 4 and 5.
The value of property controlled by the Sewer Division January 1, 1922, amounts to $7,357.88, as follows :
Tools and equipment
$2,020.55
Buildings and appurtenances
400.00
Three pumping plants
3,100.00
Material available for new work
1,837.33
TABLE 4
Appropriation Balance on hand January 1, 1921
8,697.25
SEWER CONSTRUCTION
Available for 1921 Net expenditure
27,192.22
Cash balance January 1, 1922
$6,505.03
LOCATION
Size of Pipe in Inches
Length in Feet
Net Cost
Cost per Foot
Adams Street (Massachusetts Avenue northeasterly)
8
297
$503.16
$1.69
Allen Street (Broadway southwesterly)
8
217
440.61
2.03
Arnold Street and Dundee Road (Williams Street to Dundee Road) . .
8
139
976.54
7.02
Blossom Street (Bow Street northwesterly).
8
245
1,099.09
4.49
Bow Street (Forest Street to Blossom Street).
8
270
824.64
3.05
Brattle Street (Summer Street northeasterly).
8
807
3,321.17
4.12
Forest Street and pump (Peirce Street to Bow Street.
6-8-12
1,300
6,526.26
5.02
Foster Street (Massachusetts Avenue northeasterly .
8
285
821.72
2.81
High Haith Road (old end southeasterly)
8
487
1,841.37
3.78
Hilton Street (Gardner Street northwesterly)
8
266
593.44
2.23
Massachusetts Avenue (Daniels Street westerly.
8
200
507.07
2.54
Total .
$17,455.07
*General expense
Particular sewers
3,583.38 7,779.67
Total.
Material used that was on hand January 1, 1921.
$28,818.12 1,625.90
Grand totals.
4,513
$27,192.22
*Salaries, $750.00; engineering, $237.54; tools and equipment, $302.39; miscellaneous, $118.94; holidays, $554.20; vacations, $72.75; Saturday afternoons, $1,547.56. Material on hand January 1, 1921. .. $3,463.23 Material used that was on hand January 1, 1921. 1,625.90
Material on hand January 1, 1922, available for new work. $1,837.33
$25,000.00
$33,697.25
278
ARLINGTON TOWN REPORT
TABLE 5
SEWER DIVISION MAINTENANCE
Appropriation for 1921 Expenditure
$6,000.00 5,984.23
Balance January 1, 1922
$15.77
Expenditures
Repairing, flushing and cleaning mains .
$2,056.62
Brattle Street sewer pump.
963.46
Grove Street sewer pump.
1,146.79
Care and repair of particular sewers.
1,161.04
*General expense .
1.656.32
Total
$5,984.23
*Tools and equipment, $264.25; holidays, $14.94; Saturday afternoons $241.66; vacations, $50.00; miscellaneous, $85.47.
SUMMARY OF SEWERAGE STATISTICS
General
Population by census of 1920, 18,646.
Total area of city or town, 5.5 square miles.
Area served by sewerage system, 3 square miles.
Collection System
For sewerage only, 41.31 miles, includes 3.47 miles Metro- politan sewer.
For sewerage and surface water, o miles.
For surface water only, 11.02 miles.
Method of disposal, sewerage into Metropolitan sewer, surface water into brooks.
Collection
Mains (Everything but house and catch basin connec- tion ).
For Sewerage For Surface
Only Water Only
218,173 feet 58,249 feet
I. Lineal feet pipe
2. Lineal feet extended during
year
4,513 feet 2,563 feet
3. Number of inverted siphons, 2.
4. Number of manholes, 882.
279
REPORT OF BOARD OF PUBLIC WORKS
5. Method of flushing. Water service at manholes end of lateral lines.
6. Method of cleaning. By special brush drawn from manhole to manhole.
7. Number of automatic flushing tanks, o.
8. Number of direct connection with water mains for flushing, 40.
9. Number of flushings of systems during year, 2.
IO. Cost of flushing per mile, $22.09.
II. Cost of cleaning per mile, $22.09.
12. Number of stoppages, 3.
13. Method of ventilation, manhole covers.
14. Miles of permanent undermains, 3.19. HOUSE CONNECTIONS
I. By whom made, Sewer Division, Board of Public Works.
2. Sizes, 5, 6 and 8 inches.
3. Number made during year, 133.
4. Lineal feet laid during year, 6,799:
5. Lineal feet discontinued during year, o
6. Total miles in use, 26.65.
7. Average cost per foot, connections made during year,
$I.II.
8. Number of stoppages coming to attention of Depart- ment, 60.
DISCHARGE OF SEWER
I. Estimated population using sewer system, 16,650.
2. Number of buildings connected, 2,717.
3. Daily discharge for year.
4. Daily discharge for each user.
5. Daily quantity of factory waste. See Metropolitan
6. Daily leakage into sewers. Sewerage Board
7. Daily leakage per mile of sewers. Report
8. Are quantities given under 3 to 7
estimated or measured ?
GENERAL
Total cost of collecting mains, $420,002.95.
Bonded debt at date, $140,500.
Value of sinking fund at date, $47,690.08.
Average rate of interest on bonds, 4 per cent.
Proportion of cost of system assessed on abutters, 45 per cent.
Yearly assessment for maintenance, none.
280
ARLINGTON TOWN REPORT
Method of assessing abutters and rate of assessment, as fixed by Acts of 1896, Chapter 282, is 28 cents per lineal foot frontage and 52-100 cents per square foot for area within 100 feet of street line.
FINANCIAL STATEMENT
CONSTRUCTION Receipts
Cash on hand January 1, 192I
$ 8,697.25
From Public Funds
25,000.00
Stock on hand January I, 192I
3,463.23 $37,160.58
Expenditures
Mains
$17,455.07
House connections
7,779.67
General expense
3,583.33
Stock on hand January 1, 1922
1,837.33
Balance, cash on hand January I, 1922
6,505.03
$37,160.48
MAINTENANCE AND OPERATION Receipts Appropriation from Public Funds $ 6,000.00 $ 6,000.00
Expenditures
Repairs of Mains $ 231.52
Brattle Street Pump
963.46
Grove Street Pump
1,146.79
Cleaning and flushing sewers
1,825.10
Care and Repair of Particular Sewers
1,161.04
General Expense
656.32
Cash balance January 1, 1922
15.77
$ 6,000.00
WATER DIVISION
Five thousand eight hundred forty-six feet of water mains were laid during the year and connected with the Metropolitan system. Details of this construction will be found in Table 6. The value of the property controlled by the Water Divi- sion January 1, 1922, amounts to $20,015.98, of which $7,500 is invested in buildings, $3,160.09 in tools and equipment and $9,355.89 in material available for new work.
281
REPORT OF BOARD OF PUBLIC WORKS
SERVICES
One hundred and eight new services have been added during the year and two services abandoned. There are for all purposes 1,856 on th low, 1,605 on the high and 13 on the old reservoir system. On the Metropolitan water supply there are 22 services for municipal buildings included in the above, 10 for street-watering standpipes and 40 for sewer-flush- ing purposes. On January 1, 1922, 129 services were tempo- rarily out of use.
METERS
One hundred and six meters were set on services installed during 1916, 1917, 1919, 1920 and 1921. The total number of meters in use January I, 1922, is 3,424.
282
Low SERVICE SYSTEM
HIGH SERVICE SYSTEM
RESERVOIR SYSTEM
Size
Cement-lined Pipe
Cast-iron Pipe
Cast-iron Pipe
Cement and Cast-iron Pipe
Inches
Length Feet
Hyd.
Gates
Length Feet
Hyd.
Gates
Length Feet
Hyd.
Gates
Length Feet
Hyd.
Gates
12
6,791
18,417
8,530
.
. . . .
10
11,210
19,198
. . . .
270
...
S
.
22,047
19,106
1,576
. .
. .. .
6
634
63,512
. . .
.
. .
..
. . . .
4
1,200
11,800
.
.
. . .
Total
1,834
2
5
115,360
215
211
149,895
298
290
13,125
10
12
NOTE:
1,120 feet 4-inch cement-lined pipe was abandoned on the low service.
1,120 feet 6-inch iron-pipe renewed old 4-inch cement-lined and was connected with high service. 295 feet 6-inch iron-pipe changed over from low to high service.
205 feet 8-inch iron-pipe installed on high service from Acton Street for new Junior High School. 80 feet 6-inch iron-pipe installed on high service from Acton Street for new Junior High School. 1 hydrant installed on high service on main for new Junior High School.
1 gate installed on high service on main for new Junior High School.
1 hydrant abandoned on old 4-inch cement-lined pipe low service.
2 hydrants installed on high service 6-inch renewal of old 4-inch cement-lined main. 1 hydrant changed over from low to high service.
ARLINGTON TOWN REPORT
ยท
. . . .
.
.
.
91,677
1,129
1,497
1,620
TABLE. 6
WATER EXTENSIONS
Appropriation Balance on hand January 1, 1921
$20,000.00 8,383.86
$28,383.86
Available for 1921 Net expenditure
13,327.11
Balance, January 1, 1922
$15,056.75
TO EXTEND THE HIGH SERVICE SYSTEM.
LOCATION
Size of Pipe in Inches
Length in Feet
No. of Hy- drants
No. of Gates
Total Cost
Cost per Foot
Totals
Alpine Street (Old end above Blossom Street northerly).
6
110
$366.40
$3.33
Highland Avenue (High Haith Road to Hawthorne Avenue)
10
726
1
1
3,989.13
5.45
Hillside Avenue (Old end southerly) .
8
255
1
1,105.64
4.24
Park Circle (Old end northeasterly) .
6
101
483.88
4.79
Pine Ridge Road (Gray Street westerly).
6
914
3
2,685.26
2.94
Scituate Street (Old end westerly).
6
317
1
1,106.59
3.49
Candia Street (Washington Street easterly) .
6
218
1
2,161.49
6.02
Waverly Street (Hillside Avenue northwesterly)
6
385
1
1
946.69
2.46
Totals .
TO EXTEND THE LOW SERVICE SYSTEM
Adams Street (Massachusetts Avenue easterly)
6
299
1 1 $800.20
$2.68
Allen Street (Broadway westerly) .
6
239
1
508.98
2.13
Davis Avenue (Old end easterly) .
6
227
575.79
2.54
Foster Street (Massachusetts Avenue easterly)
6
313
1
801.73
2.57
Orvis Road (Newcomb Street to Brooks Avenue)
6
184
1
602.86
3.28
Totals . *General expense.
1,262
1
4
$1,026.05
1,026.05
Total
$17,160.69
Material used that was on hand January 1, 1921.
$3,833.58
3,833.58
Grand Totals .
4,441
8
7
$13,327.11
*Lost time $615.81; holidays, $178.17; vacations, $14.25; tools and equipment $46.55; miscellaneous, $32.22; engineering, $99.05; salaries, $40.00.
Material on hand January 1, 1921 Material used that was on hand January 1, 1921 3,833.58
$4,994.00
Material on hand January 1, 1922, available for new work $1,160.42
REPORT OF BOARD OF PUBLIC WORKS
283
-
6
6
. .
6
6
Washington Street (Old end to Candia Street)
10
141
3,179
7
3
$12,845.08
$3,289.56
284
ARLINGTON TOWN REPORT
TABLE 7. WATER DIVISION
Appropriation for 1921
$ 7,000.00
Cash on hand January 1, 192I
2,330.54
Available for 1921
$ 9,330.54
Receipts from sale of water, 1921
72,163.97
Total
$81,494.51
Net expenditures
79,429.73
Cash balance, January 1, 1922
$ 2.064.78
DISTRIBUTION OF EXPENSE
Maintenance
Net Expenditures Totals
Shop and yard
$ 943.72
Mains, care and repair
478.69
Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.