Town of Reading Massachusetts annual report 1963, Part 14

Author: Reading (Mass.)
Publication date: 1963
Publisher: The Town
Number of Pages: 256


USA > Massachusetts > Middlesex County > Reading > Town of Reading Massachusetts annual report 1963 > Part 14


Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).


Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17


The entire reworking of the Reference and Young Adult Depart- ments, as well as the classes in literature and music in the non-fiction collection have been completed, and a significant beginning made on the local history collection.


173


This achievement in recataloging has been accomplished in addi- tion to the six thousand two hundred and seventy-five new accessions processed during the year.


The department was also responsible for the withdrawal from the shelf-list and public catalogue of one thousand seven hundred and sixty books withdrawn by the Librarian.


For the first time in over ten years, the Department has undertaken an inventory of the library's holdings. At the close of the year, over eighty per cent of the non-fiction collection in the Adult and Young Adult collections has been covered. Upon completion of the inventory, we shall have a more realistic picture of both strengths and weaknesses in the basic collection.


REFERENCE DEPARTMENT


The first four months of 1963 were difficult ones for our Reference Department. Difficulty in finding a successor to Mr. Brij Kapoor brought about a situation in which professional members of the staff at- tempted to ease the situation by filling in hours in the Department under the Librarian's direction. The hiring of Mr. Robert E. Cain as Reference Librarian in May solved this pressing problem. During the year all Adult reference materials were brought to a consolidated position behind the Circulation Desk. We were thus able to afford the Reference Librarian a good supervisory position and to eliminate much waste of motion in the use of reference tools. With some limitations - the lack of good light, and the ever-present problem of lack of adequate work space - this arrangement has proved much more satisfactory than prior arrangements.


The vertical file has undergone several changes aimed at making it more usable by both public and staff. The agricultural file, now infrequently used, has been moved to the basement. Some 280 career monographs have been incorporated into the vocational file, consider- ably strengthening our holdings in this vital area. More vertical file space is desperately needed, however, if our Reference Department is fully to meet demands for currently valuable materials.


During 1963 the combined efforts of those engaged in reference work resulted in the handling of 4,522 requests, an increase of 13.3 per cent over last year's total of 3,992. The areas of greatest demands in subject fields were in the area of history, travel and description, biography, and literary criticism. There was also considerable call for materials on building, do-it-yourself projects, antiques, and handcrafts. Reference requests this year, as in the past, have come chiefly from students. Although adult reference services have lagged far behind young adult reference services in terms of questions answered, we have experienced a sharp rise in adult reference use. Adequate physical facilities, combined with a good public relations program will, I know, greatly increase adult demand.


174


CHILDREN'S DEPARTMENT


An all-time high circulation of 93,310 books broke another record in our Children's Department. This figure is higher than the entire library's circulation just ten years ago.


Demands were made upon the departmental staff not only for books for home use, but for reference help as well. One thousand three hundred and seventy-four reference questions were recorded in the department during the year - an increase of nearly fifteen per cent.


The morning closing of the department has affected in no way its services. Rather it has increased its efficiency, for Mrs. Merrill is now able to spend much added time on book selection, weeding, and class room visits.


A continuing emphasis has been made on our work with schools and as a result class-room deposits totaled seven thousand eight hundred and thirty-one, an all-time high. More teachers have brought their classes to the library than ever before for instruction in the use of the card file and other departmental facilities.


The pre-school story hour has continued to be popular and many registrations have already been taken for next year's session.


The summer reading program was unusually successful and the quality of the reading done by the youngsters most gratifying


The growth of children's services continues to be severely hamp- pered by the utter physical inadequacy of the children's room. In order to make appreciable strides in making even better, service that is al- ready good, the department must have more space and a greatly increased book budget.


Mrs. Merrill deserves a special plaudit for the splendid fashion in which she conducts the work of the department despite difficult odds.


YOUNG ADULT DEPARTMENT


We have been fortunate indeed in seeing the splendid work of strengthening our service in this vital area begun by Miss Nancy B. Sartwell continued by Mr. Bee. The circulation of Young Adult materials has increased materially. Reference work with this age group continues to grow.


The restriction upon use of the department's facilities by secondary school students after 7:30 p.m. has proved most satisfactory. Students using the library for social purposes are rarely seen now, and the staff may spend more time with serious students and adults genuinely in need of reference help.


'The department's book collection has been greatly strengthened by a continuing policy of acquisition in areas of weakness, as well as a thorough program of withdrawal of materials of little or no current value. There is need for further strengthening of book resources, but this is impossible until more shelf space is afforded.


The matter of school-library cooperation in this area of book se- lection for this age group becomes more and more demanding of study.


175


There would be, I am sure, much benefit derived from a cooperative system which would allow far fuller utilization of all the town's book resources twelve months a year.


CIRCULATION DEPARTMENT


The year was once again both a difficult and frustrating one for the Department. We have been able to rise to the challenge of increased demands by the borrowing public despite the fact that 68.4 per cent of the department's work is being done by part-time staff members.


The department continues to be without a permanent head - a fact which seriously impedes its professional development. Mrs. Doris H. Taylor has done well in regularizing many of the clerical procedures which consume so large a portion of staff time, since her appointment to the post on an ad interim basis. She is, of course, hampered by the fact that she works only a part-time schedule. We must soon think seriously not only of added personnel for the clerical work, but of a full time professional head.


The problem of overdue books remains a not inconsiderable one, but it has been alleviated considerably by the Trustees' implementation of the enforcement of Chapter 266, Section 99 of the General Laws.


The Circulation Desk itself presents more and more of a problem. As its use grows, the impracticability of its arrangement becomes more and more obvious. If we are able to transfer our Cataloging Depart- ment into the third stack during 1964, we should move the work of the Circulation Department into the area they formerly occupied. This would have the effect not only of freeing badly needed space in public areas, but would create a more business-like atmosphere for the work of the department.


MUSIC DEPARTMENT


The Music Department continued to see much use during the year. The circulation of phonorecords increased by 24.4 per cent to a high of five thousand one hundred and twenty-six.


The job of reclassification of the entire music collection, both phonorecords and book materials, was completed in 1963. The value of the collection was enhanced by the withdrawal of 378 records, all of which were in poor physical shape.


The degree of interest evidenced by Reading residents not only in music, but in the visual arts continues to point to the wisdom of future planning for a subject department in this area.


The problem of space continues to be our most pressing problem. If we are to continue to meet adequately the needs of Reading citizens of all ages and cultural backgrounds, we must push forward our pro- gram of building expansion. It is our hope that the work of the Town Building Needs Space Study Committee will serve as the needed goad to action on the library's behalf, and that in 1964 we will see definite steps taken to ensure continuing library service at a high professional level for all Reading residents, both today and in the future.


176


APPENDIX A REPORT OF THE LIBRARIAN TO THE BOARD OF LIBRARY TRUSTEES FOR 1963


FINANCIAL STATISTICS


Appropriation from the Town


$ 78,000.00


Appropriation by Special Town Meeting


1,542.48


Income from Trust Funds


1,825.00


C. Nelson Bishop Memorial Fund


195.00


Total Income


$ 81,562.48


SALARIES


Appropriation from the Town


$ 50,000.00


Appropriated by Special Town Meeting


1,542.48


$ 51,542.48


EXPENDED


Full-time personnel


$ 38,309.65


Part-time personnel


9,671.71


Custodian


3,561.10


Total expended


$ 51,542.46


MAINTENANCE


Appropriation from the Town


$ 28,000.00


Income from Trust Funds


1,825.00


C. Nelson Bishop Memorial Fund


195.00


Total Maintenance


$ 30,020.00


EXPENDED


Books


$ 15,936.45


Periodicals


1,235.23


Records


620.00


Bindings


2,278.77


Printing and Supplies


1,457.38


Expense Account


300.00


Service Contracts


737.07


Building Maintenance


1,377.93


Capital Expenditures


3,557.94


Telephone


589.60


Fuel


951.86


Light


886.57


Water and Sewer


91.20


$ 30,020.00


Grand Total Expenditures


$ 81,562.46


F Returned to Town .02


177


Fines and Charges


Turned into Town Treasury


$ 3,507.59


Total Receipts


$ 3,507.59


APPENDIX B LIBRARY STATISTIC FOR 1963


CIRCULATION


Adult Department


Fiction


52,759


Non-Fiction


44,380


Phonorecords


5,126


Filmstrips


77


Films


5


Total Adult Department


102,364


Young Adults Department


Fiction


14,035


Non-Fiction


11,514


Total Young Adults Department


25,549


Children's Department


Fiction


64,527


Non-Fiction


20,952


Classroom Deposits


7,831


Total Children's Department


93,310


Inter-Library Loan


217


Total Library Circulation


221,440


Total Increase Over 1962


13,187


6.33%


Average Daily Circulation


Adult Department


350.10


Young Adults Department


87.19


Children's Department


318.46


Total Average Daily Circulation


755.75


Per Capita Reading Index


11.4


Registered Borrowers


Adult


4,553


Young Adult


2,933


Children


3,368


Non-Resident


8


Total Registered Borrowers


10,862


Per Cent of Townspeople Having Library Cards 56.4%


178


Number of Hours Library Open Each Week


Normal Schedule


Adult Department


63


Children's Department 33


Summer Schedule


Adult Department


55


Children's Department


40


APPENDIX C LIBRARY STATISTICS FOR 1963


Volumes in Library December 31, 1962 ....


49,248


Books Added


Adult Department


Fiction


1,118


Non-Fiction


3,247


Total Adult Department


4,365


Young Adult Department


923


Children's Department


987


Total Books Added


6,275


Gifts (Included Above)


386


Books withdrawn or missing


Adult Department


1,376


Young Adult Department


135


Children's Department


249


Total withdrawn or missing


1,760


Increase in Number of Volumes


4,515


Volumes in Library December 31, 1963


53,763


Volumes recatalogued


5,034


Repairs to Books


Rebound


298


Repaired at Library


2,297


2,595


179


BOARD OF LIBRARY TRUSTEES


ROBERT E. STEWART, Chairman C. NELSON BISHOP, Deceased 3/2/63 HELEN E. CLARK


H. IRENE LATHAM, Secretary WILLIAM H. DIAMOND SYDNEY M. HODSON


ALFRED R. JOHNSON


STAFF


December 31, 1963 Theodore E. Johnson, Librarian


Richard E. Reed


Jayne K. Finney


Georgianna C. Merrill


Thomas M. Bee


Robert E. Cain


Joyce K. Miller


Doris H. Taylor


Assistant. Librarian and Cataloger Administrative Assistant Children's Librarian Young Adults Librarian Reference Librarian Readers Services Librarian Circulation Librarian ad interim


Gusta E. Lodi


General Assistant


Janice M. Carter


General Assistant General Assistant


Eunice R. Currie


Eleanor R. Hardy


General Assistant


Mae M. Keenan


General Assistant


Elinore M. Pinto


General Assistant


PAGES


Steven Bacon, Susan Conroy, Robert Frotten, Ronald Bezubka, Joan Foy, Philip Westra


CUSTODIAN


Louis B. Bacigalupo


180


ANNUAL REPORT


of


THE BOARD OF PUBLIC WORKS of


The Town of Reading, Massachusetts


for the year ended December 31, 1963


REPORT OF THE BOARD OF PUBLIC WORKS


To the Citizens of Reading:


The Board of Public Works herewith submits its Annual Report for 1963.


On March 11, 1963, the Board organized with William H. Watt as Chairman and Fred C. Kenney, Jr. as Secretary.


Regular meetings of the Board were held on Monday evenings plus additional meetings as required.


Acting as the Board of Survey, hearings were held to consider proposed developments. Rules were reviewed in the light of actual experience and changes were made where it was thought warranted.


The approved programs of construction were reviewed and changes made where it was thought advisable. The method of making programs for the various departmental construction projects has resulted in good progress and will be continued in operation.


Sewer construction within an approved program has resulted in the elimination of many sanitary problems and has provided a much needed service to many homeowners. However, much remains to be done and it is recommended that this program be vigorously prosecuted and possibly expanded.


The Department had two serious cases of ill luck in 1963. The sewer contractor entered into voluntary bankruptcy with the work about 50 percent completed. The Bonding Company has contracted for the completion of the 1963 sewer extensions. Some work has been done and the remainder will be completed in 1964. There will not be any financial loss to the Town. A fire in June did considerable damage to the Town Garage. The Insurance Company has paid for the fire damage to the Garage, its contents and the equipment. Repairs are being de- ferred until a study is completed to determine the best use of the garage and surrounding area and recommendations for rebuilding will be made to the Town at a later date.


Construction of the Water Treatment Plant was completed and it has been placed in full operation. The result has been water of an excellent quality.


A program of improvements to the Water System has been de- veloped by the Department's Engineering Division. A companion pro- gram of financing has also been developed. Over a period of the next six to seven years, many improvements, such as enlarged distribution, enlarged storage, greater pump capacity, increased supply, etc. will be made.


The many requests for various types of service which are received by the Board are studied, evaluated and when warranted, developed into workable programs. Reference is made to the report of the Super- intendent for details of programming.


182


Again, the Board wishes to extend its thanks to the many Town Boards and Committees, to the Department Employees and to the gen- eral public for the cooperation and assistance received.


Respectfully submitted, William H. Watt, Chairman Fred C. Kenney, Jr., Secretary George W. Cochrane, 3rd Donald E. Florence Lawrence W. Leonard


SUPERINTENDENT'S REPORT


To the Board of Public Works:


Gentlemen:


As required by Section 4, Chapter 118 of the Acts authorizing the Town of Reading to establish a Board of Public Works, I respectfully submit for your consideration the forty-third annual report of the Department of Public Works and a short resume of the work performed during the year 1963 with recommendations for the future.


General


Residential construction continues at a moderate pace. As a result, the Board continuously receives requests for various services. Programs have been established in the various divisions of the Department and steady progress is being made in many ways. Some work has been let out to contract but most work is being done by Department employees.


Progress continues on modernizing the various functions of the Department. Much has been done but much remains to be done. In 1963 much time was spent on establishing an improved method of purchas- ing and installing unit cost records.


Board of Survey


The members of the Board of Public Works are ex-officio members of the Board of Survey. Acting as the Board of Survey, several hearings were held for the consideration of individual street layouts and for developments including several streets. Conferences were held with developers, contractors and affected property owners.


Estimates were prepared and performance bonds secured for proper construction as required.


A large number of proposed lot plans were examined and endorsed for recording. In many cases, for various reasons, it was not possible to endorse the proposals.


Engineering Division


During the year all positions except that of rodman were filled on a regular basis. This division is now operating well. The division has a


183


nucleus of good employees. A realistic use and expansion of this division would bring real efficiency and economy in many areas of Town Government providing the town is willing to pay salaries com- mensurate with private industry.


Water Division


Expansion of existing facilities continued in 1963. Work on the new treatment plant was completed and it now is in operation. Small sized mains were replaced by larger mains in several locations.


Residential construction remained at a moderate level. A total of 5,344 lineal feet of water main was installed. A total of 82 new water services were installed and 25 old services were replaced.


New water meters were installed in 82 locations, 976 meters were removed, tested and reset, or if required, junked and new meters set.


Pumping Stations and Filter Plant


Rainfall in 1963 was near normal, and problems of water supply were not serious during the year.


A total of 672,209,200 gallons of water was delivered to the dis- tribution system in 1963. The average daily consumption was 1,841,600 gallons. The highest single daily consumption was 3,872,400 gallons on June 26, 1963. The highest seven-day consumption for the period June 22 to June 28 was 21,112,000 gallons.


Well Fields


Extended dry spells in 1963 made it necessary to restrict water consumption.


The tubular wells were cleaned, inspected and repaired in the early summer months and wells showing high mineral content were shut off.


Statistics for the Year Ended December 31, 1963


General


Population - United States Census of 1960 - 19,259


Date of Construction of Pumping Stations - 1931, 1953, 1958, 1959, 1960, 1962.


Source of Supply: Tubular (Driven) Wells, Gravel Walled Wells


Cost of Pumping per Million Gallons - Power Only - $30.63


Cost of Pumping per Million Gallons based on total Pumping Sta- tion Expenses - $87.64


Cost of Water Supplied (per Million Gallons Pumped) based on Cost of Maintenance, plus Interest on Bonds - $281.28


184


YEARLY RECORD OF PUMPING STATIONS COMBINED PUMPAGE - 100 ACRES & REVAY BROOK January 1, 1963 through December 31, 1963 Total Total Total


Month


Days


100 Acres Revay Brook


Pumpage


Average Daily


January


31


21,030,600


30,754,000


51,784,600


1,670,471


February


28


17,902,800


27,348,000


45,250,800


1,616,100


March


31


29,214,700


23,418,000


52,632,700


1,697,830


April


30


28,905,100


21,802,000


50,707,100


1,690,024


May


31


29,388,000


27,072,000


56,460,000


1,821,290


June


30


37,833,500


29,079,000


66,912,500


2,230,417


July


31


41,101,700


24,375,000


65,476,700


2,112,152


August


31


42,874,300


24,664,000


67,538,300


2,178,655


September


30


34,174,900


23,610,000


57,784,900


1,926,163


October


31


34,410,400


24,017,000


58,427,400


1,884,755


November


30


27,413,500


19,305,000


46,718,500


1,557,283


December


31


29,513,700


23,002,000


52,515,700


1,694,055


Totals


373,763,200


298,446,000


672,209,200


1,841,600


COMPARATIVE TOTAL PUMPAGE OF WATER FOR PAST 10 YEARS


Total Pumpage


Increase or Average Daily


Increase


Year


Gallons


Decrease


Pumpage


or Decrease


1954


374,804,000


30,776,000 (D)


1,026,860


84,318 (D)


1955


412,582,400


37,778,400 ( I)


1,130,363


103,503 ( I)


1956


430,214,900


17,632,500 ( I)


1,178,691


48,328 ( I)


1957


471,102,600


40,887,700 ( I)


1,290,692


112,001 ( I)


1958


454,355,200


16,747,400 (D)


1,244,809


45,833 (D)


1959


503,026,200


48,671,000 ( I)


1,378,153


133,344 ( I)


1960


524,579,100


21,552,900 ( I)


1,433,276


55,123 ( 1)


1961


608,908,100


84,329,000 ( I)


1,668,241


234,965 ( I)


1962


609,073,900


165,800 ( I)


1,668,696


455 ( I)


1963


672,209,200


63,135,300 ( I)


1,841,600


173,004 ( I)


RAINFALL AT HUNDRED ACRES PUMPING STATION


1963


Month


Normal Rainfall


1963 Rainfall


Excess or Deficiency 1963


January


3.50


2.62


. . 88


February


3.19


2.89


. . 30


March


3.77


3.37


- . 40


April


3.80


1.15


-2.65


May


3.09


3.12


+ .03


June


3.33


1.44


-1.89


July


3.28


2.41


.87


August


3.41


1.68


-1.73


September


3.63


3.41


. . 22


October


3.23


1.93


-1.30


November


3.63


9.14


+5.51


December


3.51


1.55


-1.96


Totals


41.37


34.71


-6.66


185


Highway Division Chapter 90 Construction


Using Chapter 90 Funds plus Chapter 782 Funds, John Street from the Wakefield line to Washington Street was reconstructed.


Street Betterments


Five streets were accepted as public ways. All construction work was done by Town employees. The streets are:


Ash Hill Road Henzie Street


Wentworth Road Whitehall Lane


Tennyson Circle


Bituminous Concrete Pavement


Portions of the following streets were recovered with bituminous concrete:


Charles Street


Chute Street


Pleasant Street Sanborn Street


General Highway Maintenance


Normal maintenance operations took place during the year. Streets were swept, basins cleaned, storm drains cleared, tree lawns repaired, curbing set and reset, plus many other items. With the substantial installation of new public utilities plus increased traffic, it has become increasingly difficult to maintain street surfaces. Large amounts of patching materials are used annually. A substantial amount of various types of road oil was used. Several methods of treatment were used in an attempt to cover the scars of utility installations and to maintain reasonably smooth riding surfaces.


Sidewalk Construction and Maintenance


Long sections of sidewalk were constructed on High Street, Chute Street and Pleasant Street. Due primarily to economic reasons, most sidewalks were constructed of bituminous concrete.


Maintenance as usual was accomplished during the year. Gravel and stonedust were spread, tree lawns loamed and seeded and repairs made to granolithic and bituminous sidewalks.


Storm Water Drains


This item continues to be a source of constant requests for facilities.


These requests have been resolved into a program which the Board feels included the most pressing projects and which would be of most benefit to the town and the abutters.


Maintenance of Storm Drains


Under an expanded program several culverts were cleared, long lengths of ditches cleaned, and all catch basins cleaned with a mechan- ical cleaning machine. A portion of the Quannapowitt Drain was cleaned with a hired crane.


186


Snow and Ice


Several plowable snow storms occurred. Also, several that required sanding only. Additional equipment was hired and extra personnel em- ployed as required. Every reasonable effort was made to plow and re- move snow and return the Town to normal conditions in each instance.


John Street Dump


The dump was operated in a partial sanitary fill manner. Broadly speaking, the operation was reasonably successful. Some problems arose which required special attention. The fence was extended and trees planted. More cover was placed on the side facing Route 128. All possible brush, boards, limbs, etc. were processed through a chipper. During 1963 almost 2 acres of land was filled.


Park and Playground Division


In 1960 this section of the Department was placed on a divisional basis with a working foreman in charge and an enlarged labor force assigned regularly. The result was gratifying and the method has been continued to date.


Extensive maintenance was accomplished on all areas. Debris was removed, beds and walks edged, fertilizer applied, grass cut, loam and seed spread, play equipment repaired, bleachers repaired, fences re- paired, brush cut and removed, grass cut regularly, ball fields main- tained, tennis court maintained plus many other related items of work.


Men and equipment were placed at the disposal of the Recreation Committee and work done which would allow their program to be carried out efficiently.


Based on a prepared program there was considerable replacement of worn, antiquated facilities and extensions were continued in two areas.


Sewer Division


Sewer Construction followed the program as printed in the Annual Report.


Sewers were installed in several streets, with most of the work being done by contract.


Sewer house connections were installed to 139 homes.


Maintenance of main sanitary sewer was accomplished using power operated cleaning machines.


The Willow Street Sewage Pumping Station operated efficiently with no major problems except during heavy rains when homeowners released flooded cellars into the sewers and the station was inundated. Pumping totaled 22,273,630 gallons compared to 27,111,370 in 1962.