Town annual report of Braintree, Massachusetts for the year 1935, Part 11

Author:
Publication date: 1935
Publisher: The town
Number of Pages: 406


USA > Massachusetts > Norfolk County > Braintree > Town annual report of Braintree, Massachusetts for the year 1935 > Part 11


Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).


Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14


339.00 $ 209.00


1


$


Sept. $ 6,450.00 $


Tot. $292,225.00 $229,200.00 $ 8,787.95 $ 7,447.95


267


268


Month


Buildings


Grass and Woods


Inhalator


All other


Automobiles


False Alarms


Dumps and Bonfires


Ammonia Leak


Cat in wall


Refrigerator 0


Dog in pond 0


Trees


Explosion


Call for drowning


Electric light poles


Locked in room


Call for stretcher


Tank of carbon-hydrate


30


Feb.


6


0


2


2


0


3


0


1


1


0


1


O


1


0


1


1


0


0


0


57


May


5


40


0


1


1


0


5


0


0


O


0 0 0


1


0


0


1


0


0


1


O


0


0 20


July


18


10


O


2


0


00


9


0


0


1


1


0


00


0


1


0


0


0


0 46


Aug.


5


18 1


2


1


00


1


0


0


1


00


0


0


O


0


1


O


1


0


35


Sept.


1


1


0


1


2


00


2


0


0


0


0


C


0


0


O


0


9


Oct.


7 107


1


o O


4


3


1


0


0


1


0


O


124


Nov.


4


15 0 1


0


O


0


O


1


0


0


0


0


1 1


73


93 379 10 19 24


23 24


1 1 3


9


2


6 1


3 3 1


1


1


1-605


4


4


3


2


0


3


0


O


C


1


0


O


C


1 0 O


0


1


April


8


38


2


3


1


0


20


3


4


00


0


0


0


2 0 O


1 P


0


June


4


3


0 0


o


0 2 5


4


2


O


0


O


1


0


1


Dec.


11


45


7


98


0 2 00


5


0


120


0 54


Jan.


17


0


0


16


March


00


O


-


0


21


Range oil burners


Bridge


PERMITS GRANTED DURING THE YEAR


Inspected and granted for range oil burners ... 244 Inspected and granted for heating apparatus burners 161


Inspected and granted for fireworks 11


Granted to set fires in open air 372


Total


788


RULES AND REGULATIONS GOVERNING THE STORAGE OF LIGHT FUEL OIL FOR RANGE


BURNERS IN THE TOWN OF BRAINTREE


1-Not more than 10 gallons of light fuel oil shall be stored in any building or structure, unless, in a 16 guage galvanized steel tank, labeled and approved.


2-Storage tanks for light fuel oil which are not directly connected to an oil burner shall be equipped with an approved faucet of the self-closing type.


3-Tanks within building or other structure for the storage and keeping of light fuel oil in excess of 10 gallons shall be installed on or below the lowest floor of the building or structure.


4-No storage tank shall be nearer than 7 feet from any open fire or flame.


5-All necessary support for tanks shall be of sub- stantial masonery or metal construction.


-No light fuel oil tank shall be equipped with a glass guage or any guage, the breaking of which shall allow the oil to escape from the tank.


7-A bucket of sand and a scoop shall be kept with each light fuel oil burner located in a position accessible for use.


269


8-In excess of 10 gallons an application for a permit must be filed and a permit must be obtained from the Chief of the Fire Department for the keep- ing and storage of light fuel oil in any building or structure.


STATE LAW


A State Law was enacted regulating the passage of Fire Apparatus responding to fires. The law re- quires the driver of a vehicle to drive to the hight hand curb and stop until apparatus has passed. To remain at a distance of (300) feet behind apparatus and restricting the parking of a vehicle within (600) feet of a fire.


In conclusion, I wish to extend my thanks to the Honorable Board of Selectmen, to the members of the Finance Committee, and to the Police Department for their co-operation and interest in the welfare of the department.


To all others that have volunteered their services or assisted the department in any manner.


The officers and members of the department have my commendation and sincere thanks for the efficient and faithful manner in which they have performed their duties.


Respectfully submitted,


FRED A. TENNEY, Chief of Fire Department.


270


REPORT OF THE FIRE ALARM DEPARTMENT


To the Honorable Board of Selectmen :


Gentlemen :


I respectfully submit to you the annual report of the Fire Alarm System for the year 1935.


The Fire Department has the supervision of the in- stallation, repairs, equipment and maintenance of the Fire Alarm Signal System.


WORK DONE DURING THE YEAR.


Painted all fire alarm boxes and bands.


Replaced all poor bands on poles.


Painted all pipes running from boxes to cross arms.


Put new back boards on fire alarm boxes where needed.


Checked all circuits and cleared the same of all grounds.


Inspected and tested all fire alarm boxes monthly and after every severe storm.


Installed rectifiers on all circuits.


Weekly box test at noon on Saturdays.


Renewed 6 box coils and 3 gong coils.


Renewed 120 cross arms.


Installed 3 six-inch gongs.


Replaced 3 old fire alarm boxes with new ones.


Installed new fire alarm box No. 2271 at Abraham Lincoln School.


271


Installed new fire alarm box No. 1232 at Thomas A. Watson School.


Rewired 9 fire alarm boxes.


Run 1 section of line wire on Bellevue Road.


Run 6 sections of line wire on Pearl Street. Run 20 sections of line wire on Pond Street. Run 4 sections of line wire on Granite Street.


Run 1 section of line wire on Adams Street.


Run 8 sections of line wire on Hayward Street.


Run 12 sections of line wire on Hobart Street.


There were 8 open circuits during the year caused by lightning, falling trees, wires and poles.


During the year we have had considerable trouble with fire alarm boxes; all the trouble has been with the old Sector-Pull Interfering type boxes. These boxes have been in service for over 35 years and are of the interfering type. Two alarms sent in from two boxes of this type at the same time would not be re- ceived at Fire Alarm Headquarters, therefore, I rec- ommend that all the old Sector-Pull Interfering type boxes now in service be replaced with the new Posi- tive Non-Interfering Succession type boxes.


I also recommend that 4 new fire alarm boxes be purchased so that a fire alarm box will be opposite each School House in the Town of Braintree.


In conclusion, I wish to extend my sincere thanks to the Tree Warden for the valuable assistance ren- dered in trimming trees through which municipal wires pass, to the New England Telephone & Tele- graph Company and to the Braintree Electric Light Department for their co-operation and assistance rendered.


Respectfully submitted, FRED A. TENNEY, Superintendent of Fire Alarm


272


ANNUAL REPORT


OF THE


Sewer Department


OF THE


TOWN OF BRAINTREE


FROM


December 31, '43 to December 31, '35


A


0



MOJ


EF


LASSAC


· 1640.


REPORT OF THE SEWER COMMISSIONERS


We respectfully submit our report for the year ending December 31, 1935.


During the past year the P. W. A. project author- ized by the Town through the $150,000 appropriation in 1934 was completed, something over 2 miles of sewers having been constructed. At the end of 1935 there was in operation 16.30 miles of sewers, which with the East Braintree pumping station and other ap- purtenances involved a total construction expenditure of $699,983.97.


Only 82 connections were made to the sewerage system during the year in spite of the fact that there exist numerous places within the area served by sew- ers where objectionable sanitary conditions present a serious hazard to the public health. The Board of Sewer Commissioners has no authority to compel own- ers to connect with the sewer.


Realizing that the cost of house connections dis- courages many property owners from using the sew- erage system, the Board has petitioned the Legislature for a special act which will permit owners to appor- tion the cost of sewer connections over a term of years. The towns of Needham and Dedham secured legisla- tion of this kind a few years ago and as a result the' number of connections made to the sewers in these towns during the past year or two has shown a mark- ed increase. It is expected that the citizens of Brain- tree will be given an opportunity to adopt this method of financing the construction of house connections at the Annual Town Meeting in March 1936.


274


An application for a second P. W. A. sewer project was filed in September and an offer of a Federal grant of $74,250 has been received. The Board has taken no further action on the matter, but if the grant offer is held open until the Town Meeting in March 1936 the Town will be given an opportunity to accept or re- ject the project.


The report of Superintendent of Sewers, George F. Brousseau, is appended hereto.


SAMUEL M. ELLSWORTH, Chairman DWIGHT A. CHANDLER ALBERT E. ROBERTS


Board of Sewer Commissioners.


275


REPORT OF THE SUPERINTENDENT OF SEWERS


January 2, 1936.


To the Board of Sewer Commissioners,


Braintree, Massachusetts.


Gentlemen :


I submit herewith my report of the Sewer Depart- ment for the year ending December 31, 1935.


CONSTRUCTION:


Construction work starting in November 1934, un- der the Public Works Administration was completed by August of this year. This was made possible through an appropriation of $150,000.00, and on ac- count of doing the work under the P. W. A. the Town has received a grant from the Federal Government of 30 per cent of the construction cost. The total amount of grant due is $39,782.92. A partial payment on the grant of $19,594.15 was received by the Town July 24. The final payment will be made in January 1936. When the appropriation was made, it was provided in the vote that the grant money be used to retire the bond issue and for interest payments. The amount received will take care of these payments for about 31/2 years.


The project employed an average of 153 persons, all Braintree citizens, and provided a total of 159,133 man-hours of work. In order to reduce the welfare burden on the Town, the operations were carried on through the winter months with full crews of men, which made it necessary to reduce the scope of the project later on.


276


A total of 15,299 linear feet of sewer was con- structed under the P. W. A., all 8-inches in diameter except 580 feet of 10-inch and 1617 feet of 5-inch.


My report of October 22nd, covers in considerable detail unit costs experienced on every street for each classification of work. A brief cost summary of the P. W. A. work is appended hereto. All of the sewers constructed to date are connected to the main sewer and are available for use.


The following four W. P. A. projects for sewer construction were prepared during the month of August :


1. Union Street


2291 feet Cleveland Avenue


2. Circuit Road


Bradley Road 2078 feet


Coolidge Avenue Harrison Avenue


3. Robinson Avenue


Mt. Vernon Avenue 3222 feet Mt. Vernon Street Marshall Street


4. Vine Street Myrtle Street


Spruce Street 2380 feet Middle Street Wilson Avenue


The estimated total cost of these projects amount- ed to $81,351.00 of which $16,035.00 or about 20 % was to be furnished by the Town through the Finance Committee. These projects were submitted to the


277


Government after approval by the Finance Commit- tee, late in September. Three of these four projects have been approved. All carry a substantial amount of materials to be furnished by the Government.


Construction work was started on the first W. P. A. project November 29. This project calls for sewers in Cleveland Avenue (2143 feet) and Union Street (148 feet), and will provide work for 50 men for about 5 months. The Federal Government supplies the money for all the labor and $3,341.00 worth of materials. The Finance Committee pays the Town's share of the cost which is estimated at $3,998.00. The Town's share of the cost includes equipment, small tools, some materials and inspection.


Another P. W. A. project was prepared early in September and submitted to the Government. This project would provide for sewers in the Storrs Avenue pumping district at an estimated cost of $165,000.00. The Government has made an offer of a grant of $74,250.00 to aid in financing this project. The Town will have to vote to accept the grant and raise $90,- 750.00 before the work can go ahead.


The following is a summary of lateral sewer con- struction work undertaken and completed during the year, the size being all 8-inches in diameter :


Street


From


To


Length


Cedar


Elm


Summit


1942 Feet


Elm


Hawthorn


Cedar


433


Elm Knoll


Commercial Summit


383


Franklin


Azel


Summit


2761


,


Hawthorn


Elm


Summit


2226


Middle


River


Harrison


2506


"


278


Park


Hawthorn Cedar


250


"


River


Main Sewer Middle


875


"


Thorndike


Hawthorn Cedar


245


11621


Total 1935 Construction 2.20 Miles


Previous Construction


14.10 Miles


Total Constructed to Date


16.30 Miles


CONNECTIONS :


There were 82 house connections, totaling 4523 feet, made to the sewer system during the year. These were installed by the Sewer Department at a total cost of $6,808.59. The total number of connections to the system is now 166. The entire cost of installing a particular sewer is paid by the owner of the prop- erty in advance.


An E. R. A. project for running 99 sewer connec- tions, totaling 2244 feet, to the street line on Wash- ington Street and Hancock Street was completed dur- ing the summer and early fall, at a total cost of $10,- 513.98. The Federal Government paid $7,599.45 for labor, the Finance Committee paid $1,585.13 for ma- terials, the Sewer Department paid $949.52 for in- spection, supervision and equipment, and the High- way Department paid $379.88 for resurfacing. When the owner of a piece of property applies for a connec- tion where services have been extended to the street line, he is required to pay $1.25 per foot for the work already done plus the actual cost to complete the con- nection to his building.


At the same time the sewer was laid in Franklin Street under the P. W. A. project, services were run


279


to the street line in order that the new street surface would not have to be disturbed when the dwellings are connected with the sewer. These 81 connections, totaling 1815 feet, were part of the P. W. A. project, and were installed at a total cost of $6,961.07. In- cluded in the 1815 feet is 198 feet of 8-inch pipe for future lateral sewer connections for side streets en- tering Franklin Street.


MAINTENANCE:


During the early spring and late fall all of the lateral sewers were cleaned by flushing and dragging. It is estimated that about 25,000 cubic feet of water was used for this purpose.


The automatic pumping station in East Braintree, off Brookside Road, operated perfectly during the year. The only trouble experienced was the break- ing of one of the float switch chains which was quick- ly replaced, and outside electrical trouble with one of the pole transformers which the Electric Light De- partment repaired immediately. There are now six business blocks connected to the sewer served by this station, and it has become necessary to flush out the pump well pit about once a week. The cost of elec- tricity to operate the station for year amounted to $116.37.


Six manhole frames on Union Street and five man- hole frames on Washington Street were raised to meet the new grade of these streets. The cost of doing this work amounted to about $10.00 for each frame raised.


Due to the action of the tide in Fore River, a por- tion of the top of the 36-inch main sewer in Gordon Road was uncovered, and it was necessary to place concrete over the pipe to prevent any further erosive action.


280


The purchase of the new equipment authorized at the last Town Meeting has aided materially in reduc- ing the cost of operation and maintenance, and has saved the Town several thousand dollars in rental charges.


ASSESSMENTS :


There were 17 sewer assessment plans prepared covering the work done under the P. W. A. These plans, in addition to showing the assessment limits, show the location of all underground structures en- countered and the character of the materials exca- vated, the location of each stub left for connections and ties to every manhole. Record plans of all the sewers are on file in the Sewer Department office and are available for inspection at any time.


There were 263 sewer assessments levied amount- ing to $44,150.73. Bills for these assessments were sent out by the Tax Collector on December 31. The total assessment levy is now $208,465.26. The Tax Collector has collected 44 per cent of the 1934 levy.


FINANCIAL STATEMENT :


CONSTRUCTION ACCOUNT


Balance December 31, 1934. . $132,726.66


Finance Committee Transfer


for W. P. A. Work 513.84


Total $133,240.50


Balance December 31, 1935


(P. W. A.) 1,938.37


1935 Construction Expendi-


tures


131,300.63


281


Previous Construction Expen- ditures 568,683.34


Total Construction Expendi-


tures $699,983.97


Construction Expenditures on P. W. A. Work:


Labor


$ 93,949.02


Materials


23,666.07


Equipment Purchased 3,242.04


Equipment Rented


9,929.66


Total $130,786.79


Construction Expenditures on W. P. A. Work:


Labor


$


303.48


Materials


210.36


Total


513.84


Total 1935 Construction Ex-


penditures


$131,300.63


HOUSE CONNECTION ACCOUNT


Appropriation $ 17,021.04


Expenditures :


Labor 5 5,745.77


Materials


1,276.23


Equipment Purchased 348.72


Equipment Rented


174.72


Total


7,545.44


Unexpended Balance, Decem-


ber 31, 1935


$


9,475.60


MAINTENANCE ACCOUNT


Appropriation


$


9,061.00


282


Expenditures : Labor:


Sewer Assessments $ 759.50


Office Records 256.99


New P. W. A. Work


348.56


W. P. A. Work


550.09


Sewer Maintenance


1,144.12


Superintendent


1,384.68


Foreman


1,296.00


Clerk


396.00


Total


$. . 6,135.94


Equipment :


General Maintenance


318.78


Sewer Cleaning


298.08


Office


128.68


Total


$ 745.54


Expenses :


Office Supplies


188.28


Office Expenses


133.29


Printing & Advertising


184.60


Rent of Storage Space


33.75


Equipment Rented


28.98


Pumping Station


164.00


Equipment Repairs


113.25


Insurance


332.14.


Auto Maintenance


234.28


,Sewer Assessments


96.04


Maintenance Materials


464.04


Total 1,972.65


Total


Maintenance Expendi-


tures


8,854.13


Unexpended Balance, Decem-


ber 31, 1935 $ 206.87


283


NEW EQUIPMENT ACCOUNT


$ 6,311.00


Appropriation Expenditures :


Dump Truck


951.75


Air Compressor


1,950.00


Compressor Truck Mount-


ing


700.00


Compressor Tools and


Drills


1,430.89


Fire Hose


390.00


Centrifugal Pump


352.60


Office Equipment


516.20


Total


6,291.44


Unexpended Balance, Decem-


ber 31, 1935


$ 19.56


Respectfully submitted,


GEORGE F. BROUSSEAU, Superintendent.


284


ANNUAL REPORT


OF THE


Thayer Public Library


. OF THE


TOWN OF BRAINTREE


FROM


December 31,'34 to December 31, '35


R


A


TOWN


TREE


W


S


1640


SETT


REPORT OF THE TRUSTEES OF THE THAYER PUBLIC LIBRARY


To the Citizens of Braintree :


During the year 1935, 162,745 books were circu- lated from Thayer Public Library and its branches. The circulation from the main library was 90,269; from the Braintree branch 35,631, and from the East Braintree branch 36,845.


The total circulation was 1708 less than for the previous year. A similar decrease has been experi- enced in most libraries and is thought to be the result of more employment and consequently less time for reading.


During the year 2802 books were added to the li- brary either by purchase or gift. On December 31, 1935 there were 32,517 books in the library and branches.


The Trustees feel that the crowded conditions at the library should be called to the attention of the citizens. It is obvious that an addition should be con- structed to permit the storage of books and to enlarge the reading rooms.


Respectfully submitted,


STACY B. SOUTHWORTH, Chairman ALBERT E. AVERY


MABEL S. ROGERS CIARA G. WETHERBEE JOHN W. HARDING 1


Trustees of Thayer Public Library.


February 1, 1936.


286


1


FUNDS AND ASSETS


of the


TRUSTEES OF THAYER PUBLIC LIBRARY


As at December 31, 1935


FOUNDATION FUND


Principal Account:


500 U. S. Treasury 31/4 %


Note $ 500.00


Deposit, Quincy Savings


Bank


1,000.00


Deposit, Weymouth Sav-


ings Bank


2,520.91


Deposit, Abington Savings Bank


1,000.00


Deposit, Hingham Savings Bank


1,000.00


Cash, State Street Trust Co.


5,000.00


$ 11,020.91


CALEB STETSON FUNDS


Principal Account:


Deposit, Quincy Savings


Bank


1,000.00


Deposit, Braintree Savings Bank $ 1,000.00


$ 2,500.00


287


RACHEL R. THAYER FUND


Principal Account:


Deposit, Home Savings Bank, Boston $ 172.50


$ 172.50


FINANCIAL REPORT


of the


TRUSTEES OF THAYER PUBLIC LIBRARY


For the Year Ended December 31, 1935


RECEIPTS :


Cash on Deposit, January 1, 1935 $1,961.88


Income from Foundation Fund 412.80


Income from Caleb Stetson Fund 77.50


Income from Rachel R. Thayer Fund . . 4.73


$2,456.91


EXPENDITURES :


Tax on Checks $ .08


Rent Safe Deposit Box


11.00


Treasurer's Surety Bond


25.00


Supplies, Printing & Postage


50.20


Wages


7.75


Telephone


10.80


Furniture & Fixtures


188.75


Travelling


23.16


Cash on Deposit, December 31, 1935


2,140.17


$2,456.91


288


NATHANIEL H. HUNT TRUST INCOME ACCOUNT


INCOME:


Cash on Deposit, January 1, 1935 $1,638.19


Income received for year 1935 820.68


$2,458.87


EXPENDITURES :


Books and Papers $ 673.65


Cash on Deposit, December 31, 1935 1,785.22


$2,458.87


289


CEMETERY DEPARTMENT TOWN OF BRAINTREE


February 18, 1936.


Honorable Board of Selectmen


Town Hall,


South Braintree, Massachusetts.


Gentlemen :


I submit herewith the Annual Report of the Super- intendent of the Plain Street Cemetery, for the year ending, December 31, 1935.


There were nine adult burials and four minor's during the year 1935.


All graves that had caved in from settling were filled with loam, regraded and seeded.


All walks were raked, weeded and the edges cut. Grass was mowed regularly each week.


A large variety of flowers were in bloom until late October. Many lot owners supplied their own flowers which enhanced the beauty of the cemetery.


The superintendent and the caretaker are always willing, whenever possible, to carry out the wishes of the lot owners in connection with their individual lots.


In closing, I wish to thank the Honorable Board of Selectmen for the interest and co-operation they have shown towards making this cemetery as attrac- tive as is possible with the limited funds available.


- Respectfully submitted,


JOHN F. LEETCH, Superintendent of Plain Street Cemetery.


290


ANNUAL REPORT


OF THE


Highway Department


OF THE


TOWN OF BRAINTREE


FROM


December 31, '34 to December 31, '35


F


TOWN.


INCORPO RATED


F.E


MAS


.1640.


TS


T


HIGHWAY DEPARTMENT


To the Honorable Board of Selectment of the Town of Braintree :


Gentlemen:


I have the honor and pleasure of submitting to you my report for the year 1935, which shows itemized accounts of the Highway Department representing expenditures as per orders of your honorable Board.


Respectfully submitted,


F. AUSTERBERRY, Superintendent of Highway Department.


292


Braintree Highway Department --- Expenditures 1935


Total Expended


Appropriation


Balance Unexpended


Salary of Superintendent


$ 3,237.50


$ 3,237.50


GENERAL :- Support of Highway Dept., including Labor, Repairs to Highways, Town ways and Bridges; also, for re- pairs and building of sidewalks, stone roads, and removal of Snow; Oiling and Tarring of Streets; Purchase of Equip- ment ,


$ 59,748.19


$ 60,000.00


$ 256.92


Transfers from Reserve Fund


229.75


229.75


Refunds


5.11


SNOW REMOVAL


14,891.13


15,000.00


108.87


NEW EQUIPMENT


675.00


675.00


293


SPECIALS


Union Street Resurfacing


8,088.72 13,980.70


8,111.50


22.78


Washington Street Resurfacing


14,000.00


19.30


West Street Resurfacing


847.01


850.00


2.99


TRANSFERS


Walnut Street Drain


276.13


308.00


31.87


Holbrook Avenue Sidewalk


473.94


475.00


1.06


Washington Street Sewer Trench


379.88


408.50


28.62


E. R. A. Materials and Trucks


9,753.50


9,753.50


W. P. A. Materials and Trucks


2,786.67


2,786.67


CHAPTER 464 PROJECT


Union Street Sidewalk


4,555.72


7,020.29


2,464.57


Totals


$116,686.34


$119,623.32


$2,936.98


294


·


ANNUAL REPORT


OF THE


Tax Collector


OF THE


TOWN OF BRAINTREE


FROM


December 31, '43 to December 31, '35


BR A


R


MOL


E


MA


ISS


·1640.


USETTS


To the Taxpayers of the Town of Braintree :


I submit herewith my annual report of collections for the year of 1935.


A comparison of the outstanding accounts of De- cember 31st., 1935 with those of December 31st., 1934 note general decreases in tax delinquencies as follows :


% Outstanding 12-31-35


% Outstanding 12-31-34


Poll


2.523


6.912


Excise


5.509


8.658


Real Estate


13.154


19.402


Personal


5.274


21.577


Total


12.491


18.812


The clerks of my department join me in my sin- cerest gratitude for your kind co-operation, and I thank you for all past favors and hope for continued pleasant relations.


Respectfully yours,


GEORGE H. GERRIOR, Jr. Tax Collector.


296


SUMMARY REPORT OF COLLECTIONS


Year of 1935


Poll & O.A. Schedule A


Excise Schedule B


Real & Pers. Schedule C


Personal Schedule D


Total


Misc. Schedule E


Total


Original Commitments


35,195.00


92,057.85


2,470,818.56


89,307.02


2,687,378.43


December 31, 1934 Balance


2,793.15


8,229.01


434,695.90 202.33


8,762.09


454,480.15 190.33


73,162.72 246.14


436.47


Adjusted Jan. 1, 1935 Bal.


2,781.15


8,229.01


434,898.23


8,762.09


454,670.48


73,408.86


528,079.34


Additional Commitments


9,964.00


32,150.57


867,220.91


48,699.12


958,034.60


4,201.63


962,236.23


Disclaimed Credits


7,220.24


748.76


7,969.02


Total Collectible Charges


12,745.15


40,379.58


1,309,339.38


57,461.21


7,220.24 1,419,925.32


78,359.27


1,498,284.59


Less:


Collections Abatements


10,651.30


32,163.44


887,466.28


51,737.45


982,018.47


6,260.82


988,279.29


Tax Title Transfers


59,102.88


59,102.88


59,102.88


Rets. for Apportionment


71,155.96


71,155.96


Sales to Tax Title Accts. Total Credits


11,867.15


35,308.03


984,356.09


52,775.24 4,685.97 5.274%


335,618.81 12.491%


31.85


335,650.66


1


Miscellaneous Income:


Interest


. 48


407.88


16,231.61


403.07


17,043.04


382.11


17,425.15


Fees


508.55


661.30


893.35


37.50


2,100.70


. 35


2,101.05


Certificate of Liens


89.00


89.00


Redemption thru Collector Total


509.03


1,069.18


17,215.96


440.57


19,234.74


382.46


19,617.20


1,215.85


3,144.59


15,514.99


1,037.79


20,913.22


844.28


21,757.50


22,271.94