Annual reports of the Town Officers of the town of Thetford, Vt. : for the year ending 1919-1922, Part 4

Author: Thetford (Vt.); Thetford (Vt.). School District
Publication date: 1919
Publisher: [Thetford, Vt.] : [The Town,]
Number of Pages: 258


USA > Vermont > Orange County > Thetford > Annual reports of the Town Officers of the town of Thetford, Vt. : for the year ending 1919-1922 > Part 4


Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).


Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12


13


Jan. 27 E. D. Preston, use of water 1919 $ 2.00


29 Interest. 15.41


Total


$10,774.32.


T. C. Green 14.51


$10,788.83


C. C. EMERSON, W. E. TUCKER, C. A. ADAMS, Selectmen of Thetford.


The Selectmen have drawn orders for work on State road from Thetford Center to Thetford Hill.


Week ending May 24, 1919:


F. E. Hatch, 27 hours with team, 73c. $ 19.71


N. H. Porter, 27 hours with team, 73c. 19.71


L. F. Kent, 9 hours with team, 73c 6.50


F. E. Hatch, 27 hours, 39c.


10.53


C. A. Hatch, 222 hours, 33c.


7.42


Everett McClary, 14 hours


4.62


Loads of gravel, 45. 4.50


$72.99


Week ending May 31, 1919:


F. E. Hatch, 54 hours.


$ 39.00


N. H. Porter, 54 hours


39.00


L. F. Kent, 52} hours 37.97


P. T. Clark, 18 hours


13.00


F. E. Hatch, 54 hours


21.00


C. A. Hatch, 54 hours.


18.00


G. J. Roberts, 54 hours


18.00


Wm. Jenkins, 54 hours


18.00


John McClary, 18 hours


6.00


124 loads gravel. 12.40


$222.37


Week ending June 7, 1919:


F. E. Hatch, 41 hours


$ 29.61


N. H. Porter, 41 hours.


29.61


L. F. Kent, 372 hours. 27.08


B. W. Clark, 25 1-4 hours 18.23


F. E. Hatch, 41 hours


15.99


C. A. Hatch, 41 hours


13.66


G. J. Roberts, 36 hours


12.00


14


Wm. Jenkins, 36 hours $ 12.00


104 loads gravel. . 10.40


$168.58


Week ending June 7, 1919:


F. E. Hatch, 4 hours


$ 2.88


N. H. Porter, 4 hours


2.88


L. F. Kent, 22 hours.


1.80


F. E. Hatch, 4 hours


1.56


C. A. Hatch, 4 hours


1.33


$10.45


Week ending June 14, 1919:


F. E. Hatch, 36 hours.


$26.00


N. H. Porter, 40} hours


29.25


L. F. Kent, 41 hours.


29.61


F. E. Hatch, 50 hours


19.50


C. A. Hatch, 20 hours.


6.66


Wm. Jenkins, 50 hours


16.67


G. J. Roberts, 36 hours.


12.00


Loads gravel, 24.


2.40


$142.09


Week ending June 21, 1919:


F. E. Hatch, 45 hours.


$ 32.50


L. F. Kent, 45 hours.


32.50


N. H. Porter, 45 hours


32.50


F. E. Hatch, 54 hours


21.06


C. A. Hatch, 54 hours


18.00


Wm. Jenkins, 54 hours


18.00


G. J. Roberts, 54 hours.


18.00


Everett McClary, 27 hours


9.00


R. H. Vaughn, 13} hours.


. 4.49


$186.05


Week ending June 28, 1919:


F. E. Hatch, 45 hours


$ 32.50


L. F. Kent, 33 3-4 hours


24.37


F. E. Hatch, 45 hours.


17.50


C. A. Hatch, 45 hours


15.00


Wm. Jenkins, 312 hours


10.49


G. J Roberts, 36 hours


12.00


$111.86


Week ending Aug. 16, 1919:


F. E. Hatch, 18 hours


$13.00


F. E. Hatch, 18 hours


7.00


Fred Roberts, 9 hours.


3.00


$23.00


15


Week ending Aug. 30, 1919:


N. H. Porter, 54 hours. $ 39.00


L. F. Kent, 49 1-4 hours. 35.75


H. B. Palmer, 54 hours 39.00


C. E. Bacon, 54 hours 39.00


F. E. Hatch, 54 hours.


39.00


Geo. W. Chase, 54 hours


39.00


Groge Roberts, 54 hours


18.00


Wm. Jenkins, 54 hours


18.00


Fred Roberts, 54 hours.


18.00


F. E. Hatch, 54 hours


21.00


142 loads gravel. 14.20


$319.95


Week ending Sept. 6, 1919:


N. H. Porter, 45 hours


$ 32.50


L. F. Kent, 40} hours.


29.25


G. W. Chase, 45 hours.


32.50


H. B. Palmer, 45 hours


32.50


F. E. Hatch, 45 hours


32.50


C. E. Bacon, 45 hours


32.50


Geo. Roberts, 45 hours.


15.00


Wm. Jenkins, 45 hours.


15.00


Fred Roberts, 45 hours


15.00


F. E. Hatch, 45 hours


17.50


118 loads gravel.


11.80


$266.05


Week ending Sept. 13, 1919:


$ 13.00


L. F. Kent, 18 hours.


13.00


C. E. Bacon, 18 hours


13.00


Geo. Chase, 18 hours


13.00


F. E. Hatch, 32 hours.


23.12


H. B. Palmer, 18 hours


13.00


Geo. Roberts, 18 hours


6.00


Wm. Jenkins, 27 hours


9.00


Fred Roberts, 27 hours


9.00


F. E. Hatch, 32 hours


12.44


Arlo Hatch, 5 hours


1.67


46 loads gravel.


4.60


$130.83


Week ending Sept. 20, 1919:


F. E. Hatch, 34 hours.


$ 24.56


C. E. Bacon, 36 hours


26.00


H. B. Palmer, 34 hours


24.56


N. H. Porter, 18 hours


16


N. H. Porter, 36 hours


$ 26.00


G. W. Chase, 34 hours


24.56


L. F. Kent, 34 hours. 24.56


F. E. Hatch, 36 hours. 14.00


Geo. Roberts, 36 hours. 12.00


Wm. Jenkins, 36 hours


12.00


C. A. Hatch, 36 hours.


12.00


R. H. Vaughn.


2.00


8 loads gravel.


8.80


N. H. Porter, land damage.


3.00


L. F. Kent, mold board plane.


4.00


84 ft. corrugated culvert pipe


158.44


14 ft. 8 inch tile.


3.78


16 ft. 10 inch tile.


6.16


2 bbl. cement.


7.80


2 steps for shovels.


.40


200 ft. lumber at 2} c.


5.00


3 handles, one shovel, hoe and hook


1.00


Sharpening shovels and picks


.55


5 lbs. nails . .35


$401.52


Total cost of Thetford Ctr. to Thetford ford Hill job, 1919 $2,055.84


Post Mills Work.


Week ending Sept 27, 1919:


L. F. Kent, 45 hours.


$32.50


F. E. Hatch, 45 hours


32.50


F. E. Hatch, 45 hours.


17.50


Arlo Hatch, 42 hours.


1.50


Cyrus Merrill, 13} hours


4.50


Arthur Higgins, 18 hours


6.00


$94.50


Week ending Oct. 4, 1919:


$33.12


F. E. Hatch, 45} hours.


33.12


G. R. Fifield, 15 3-4 hours.


11.37


Cyrus Merrill, 47 1-4 hours


15.74


F. E. Hatch, 47 1-4 hours.


18.37


F. A. Savory, 34 17-20 hours


11.62


Jesse Wood, 9 hours


3.00


132 loads gravel.


13.20


. . ...


L. F. Kent, 45} hours.


$139.54


17


Week ending Oct. 11, 1919:


L. F. Kent, 52 2-13 hours $37.83


G. R. Fifield, 43 hours . .


31.05


F. E. Hatch, 53 2-13 hours 38.55


Cyrus Merrill, 51 hours


17.00


F. E. Hatch, 54 hours


21.00


F. A. Savory, 41 2-10 hours


13.96


Arthur Higgins, 18 hours


6.00


232 loads gravel. 23.20


$188.59


Week ending Oct. 18, 1919:


L. F. Kent, 12} hours.


$9.03


F. E. Hatch, 9 hours


6.00


F. A. Savory, 9 hours.


3.00


Arthur Higgins, 9 hours


3.00


F. E. Hatch, 12} hours.


4.85


Cyrus Merrill, 9 hours


3.00


43 loads of gravel


4.30


$33.68


Week ending Nov. 29, 1919:


$ 6.50


F. E. Hatch, 9 hours


6.50


Total cost Post Mills Job 1919


$469.31


ROAD COMMISSIONER'S REPORT. For the year, 1919.


Old order book


R. E. Doble


Order No.


la April 3 R. E. Doble, 5 hrs. self and team carting stone and dirt filling holes and washouts ... . $ 9.14


2a


R. E. Doble, smoothing roads, No. 2 road 14, No. 3 road 9 hrs .. 16.58


3a R. E. Doble, carting dirt, fill- ing holes and work on culvert 18 hrs. on No. 3 road 13.00


4a Perry Clark, carting gravel, fill- ing holes and work on cul- vert on No. 3 road, 18 hrs .... 12.00


18


$13.00


L. F. Kent, 9 hours


5a April 3 Ben Cook, 18 hrs. labor on No. 3 road.


$ 5.00


6a


L. H. Dolley, 18 hrs. labor on No. 3 road. 5.00


7a


Jerome Jackman, 9 hrs. labor on No. 3 road. 2.50


8a


Roy Barrows, 2 hrs. carting gravel, filling holes on No. 3 road . 1.34


9a


14


Perry Clark, 1 day carting dirt on washout on Shunkhollow road . 6.00


10a


Roy Barrows, 1 day carting dirt on washout on Skunk- hollow road. 6.00


11a


Jerome Jackman, 1 day labor on Skinkhollow road. 2.50


12a


R. E. Doble, 52 days with team carting dirt, work on culverts etc.


34.75


13a


Chas. Wilcox, } day carting gravel for washout on No. Thetford road (by Daley's) .. John Walton, 2 days labor on washout on No. Thetford road (by Daley's) . 5.00


3.00


14a


15a


Wm. E. Bond, 2 days carting gravel for washout on No. Thetford road (by Daley's) .. 12.00


16a


J. H. Dolley, 5} days labor on washouts, culverts, etc ..


13.75


17a


B. H. Cook, 5 days labor on washouts, culverts, etc .. . .


12.50


18a


21


R. E. Doble, team work cart- ing dirt, fixing culverts, etc ... 22.03


19a


L. H. Dolley, work on culverts, filling holes, etc. 10.69


20a


Willis Estes, work on culverts, filling holes, etc. 10.50


21a


Wm. E. Bond, labor on highway with team. 6.00


22a


Breton Clark, 3 hemlock logs for culverts near his house .. . 2.00


23a


C. C. Cook, 1 hemlock log for culvert at same place. . 1.00


24a


Forest Robinson, 32 hrs. labor on Arthur Robinson road. .. 8.80


19


25a April 21 A. J. Robinson, 32 hrs. team, 12 hrs. self, labor on his road.


$ 22.80


26a


R. E. Doble, carting dirt, fix- ing culverts, etc . . 9.61


27a


L. H. Dolley, work on culverts, holes, etc. 2.50


28a


Willis Estes, work on culverts, filling holes, etc. 3.00


29a


28


Willis Estes, 2 days labor on highway 6.00


30a


L. H. Dolley, 2 days labor on highway 5.00


31a


R. E. Doble, 1 day labor on highway with team. 6.50


32a -


W. E. Bond, 1 day labor on highway with team. . 6.00


33a


R. E. Doble, 2 days with team. 1} days self labor on No. 3 road 18.25


. 34a


W. E. Tucker, 22 hrs. with tractor on No. 3 road. . 22.00


35a


Willis Estes, 3 days labor on No. 3 road. 9.00


36a


R. B. Gould, 2} days labor with team on No. 3 road.


15.00


37a


Frank Hill, 8 hrs. labor on No. 3 road. 2.22


38a


J. R. Rice, patrol work. 48.00


39a


J. R. Rice, patrol work. 25.66


New Book. 1


8.50


2


L. B. Emerson, 9 hrs. labor on highway, man, self, and team Jerome Jackman, 5 hrs. labor on culverts. 1.40


3


L. H. Dolley, ¿ day labor on highway 1 25


4 May 6 R. E. Doble, 4 days labor with team, Skunkhollow job. 26.00


5 W. E. Bond, 4 days labor with team, Skunkhollow job. 24.00


May [ 6 Willis Estes, 4 days labor on Skunkhollow job. $ 12.00


6


L. H. Dolley, 4 days labor on Skunkhollow job. 10.00


8


J. R. Rice, Patrol work. 17.50


20


9 May 6 Geo. Chase, 30 hrs. honing,


72 hrs. filling holes, work on culverts on No. 2 road . . . . . .


$ 24.94


10


12 R. E. Doble, 23 hrs. self and team, 9 hrs. team, labor on No. 2 road. 19.88


11


W. E. Bond, 32 hrs. with team . on No. 2 road. 21.34


12


Willis Estes, 32 hrs. labor on No. 2 and No. 3 roads. 10.67


13 L. H. Dolley, 5 hrs. labor on No. 3 road 1.39


14


Ben Cook, 18 hrs. labor on No. 3 road.


5.00


15


W. E. Bond, 9 hrs. on Skunk- hollow job, 62 hrs carting dirt filling holes above Ran- dall's. 10.34


16


R. E. Doble, 9 hrs. labor with team, Skunkhollow job 6.50


17


Willis Estes, 9 hrs. labor on Skunkhollow job. 3.00


18


L. H. Dolley, 9 hrs. labor on Skunkhollow job


2.50


19


J. R. Rice, patrol work.


14.00


20


19


W. E. Bond, 3 days labor on highway with team. 18.00


21


Willis Estes, 4 days labor on highway. 12.00


22


R. E. Doble, 3 days self and team, 1 day team on high- way, auto mileage looking over roads at 7c per mile .. .


24.67


23


Morgan Smith, 4 days labor on highway. 10.00


24


21


J. R. Rice, Patrol work 31.50


25


26 R. E. Doble, 5 days labor with team on highway. 32.50


26


W. E. Bond, 5 days labor with team on highway. 30.00


27


R. B. Gould, 5 days labor with team on highway 30.00


28


Willis Estes, 5 days labor on highway. 15.00


29


Morgan Smith, 5 days labor on highway. 12.50


30


J. R. Rice, patrol work 40.50


21


31 June


2 R. E. Doble, 4 days labor with team, Sawnee Bean.


32


$ 26.00 R. B. Gould, 4 days labor with team Sawnee Bean 24.00


33


Willis Estes, 4 days labor, Sawnee Bean. 12.00


34


W. W. Chamberlin, 4 days la- bor, Sawnee Bean. 12.00


35


Morgan Smith, 4 days labor Sawnee Bean. 10.00


36


4


J. R. Rice, patrol work.


23.50


37


9


J. R. Rice, Patrol work. 22.50


38


R. E. Doble, 2 days self, 4 days self and team.


33.00


39


R. B. Gould, 6 days labor with team on highway 36.00


40


W. E. Bond, 3 days 8 hrs., labor with team on highway. Willis Estes, 5 days labor on highway. .


15.00


42


W. W. Chamberlin, 6 days labor on highway 18.00


43


Morgan, Smith, 4 days labor on highway 10.00


44


16


R. E. Doble, 5} days self and team, ¿ day team.


37.25


45


R. B. Gould, 6 days labor with team. 36.00


46


W. E. Bond, 4 days labor with team


24.00


47


Willis Estes, 6 days la' or on highway 18.00


48


W. W. Chamberlin, 5} days labor on highway. 16.50


49


Morgan Smith, 6 days labor on highway


15.00


50


Homer Barrows, 2 days labor on highway . 5.00


51


W. E. Bond, 2 days honing on No. 3 road. 12.00


52


R. E. Doble, } day picking stone, No. 3 road; 10 miles car mileage at 7 c. 2.45


53


W. W. Chamberlin, ¿ day pick- ing stone, No. 3 road. 1.50


54


21


Homer Barrows, 5 days labor on highway 12.50


22


23.33


41


55 June 23 J. R. Rice, patrol work. $ 60.33 56 57


R. E. Doble, 6 days labor with team. 39.00 R. B. Gould, 6 days labor with team. 36.00


58


W. E. Bond, 6 days labor with team. 36.00


59


Willis Estes, 6 days labor on highway 18.00


60


W. W. Chamberlin, 6 days labor on highway. 18.00


61


Morgan Smith, 6 days labor on highway 15.00


62


30


R. E. Doble, 4 days labor with team. 26.00


63


R. B. Gould, 4 days 7} hrs. labor with team 29.00


64


W. E. Bond, 1 day, 8 hrs. labor with team. 11.34


65


Willis Estes, 5 days labor on highway 15.00


66


W. W. Chamberlin, 5 days labor on highway. 15.00


67


Morgan Smith, 4 days labor on highway 10.00


68


Harry Rowell, 1 days labor on highway 2.50


69


R. E. Doble, 1 day team honing No. 3 road. 3.00


70


Morgan Smith, 1 day driving hone, No. 3 road. 2.50


71


Geo. Chase, 13 hrs. self, man and team filling holes on No. 2 road. .


12.23


72


J. R. Rice, patrol work.


16.51


73


W. P. Slack, work on his road. .


25.50


74 July 7


R. E. Doble, 4 days, self and team, 1 day team, labor on highway. 29.50


75


Willis Estes, 5 days labor on highway .. 15.00


76


W. W. Chamberlin, 5 days labor on highway. 15.00


77


Morgan Smith, 5 days labor on highway. 12.50


78


R. B. Gould, 1 day honing on No. 3 road. 6.00


23


79 July 17 A. E. Smith, labor on highway from Mar. to Apr. 18, 2 men and team filling washouts, etc. $ 38.65 Will Jenkins, 2 men and team filling washouts. 8.00


80


81


R. E. Doble, spikes, repairs on road machine, ex. and tel. for casting for road ma- chine, 62 miles with car at 7c etc. 7.98


82


R. B. Gould, 1 day labor with team 6.00


83 Aug.


4 R. E. Doble, 4 days labor with team. 26.00


84


Will Chamberlin, 4 days labor on highway 12.00


85


R. B. Gould, 4 days, self labor on highway .


10.00


86


Morgan Smith, 2 days labor on highway. 5.00


87


Myron Smith, 1 days labor with team on highway 6.00


88


11 R. E. Doble, 2 days labor with team on highway


13.00


89


R. B. Gould, 1 day self, 1 day self and team


8.50


90


Willis Estes, 2 days labor on highway.


6.00


91


Will Chamberlin, 2 days labor on highway, 13 hrs. labor for selectmen.


10.29


92


Morgan Smith, 2 days labor on highway.


5.00


93


R. E. Doble, 3 days labor with team at Post Mills 19.50


94


R. B. Gould, 3 days labor with team at Post Mills. 18.00


95


Willis Estes, 3 days labor on highway at Post Mills. 9.00


96


Will Chamberlin, 3 days labor


97


9.00 on highway at Post Mills .... Morgan Smith, 3 days labor on highway at Post Mills. 7.50


98


Harold Heaton, 2} days labor with team filling holes on lake road, Post Mills


15.00


24


1


99 Aug 11 A. A. Waterman, 3 hrs. self and team filling holes on No.3 road


$ 2.67


100


A. A. Waterman, 8 hrs. labor on Thetford Ctr. road. . 2.67


101


G. H. Porter, labor on highway from May 17, to June 23. 9.58


102 103


18 R. E. Doble, 4 days labor with team.


26.00


R. B. Gould, 4 days labor with team. 24.00


104


Willis Estes, 4 days labor on highway. 12.00


105


W. W. Chamberlin, 4 days labor on highway. 12.00


106


Morgan Smith, 4 days labor on highway


10.00


107


R. E. Doble, 2 days labor with team on No. 3 road. 13.00


108


R. B. Gould, 2 days labor with team on No. 3 road. 12.00


109


- Willis Estes, 2 days labor on No. 3 road.


6.00


110


Will Chamberlin, 2 days labor on No. 3 road 6.00


111


Morgan Smith, 1 day labor on No. 3 road


2.50


112


Roy Barrows, } day carting gravel filling holes on No. 3 road.


3.00


113


26 R. E. Doble, 7 hrs. labor with team on highway. 5.44


114


R. B. Gould, 7 hrs. labor with team on highway. 4.66


115


Willis Estes, 7 hrs. labor on highway


2.33


116


R. E. Doble, 42 days labor with team, on No. 3 road. 29.25


117


R. B. Gould, 4} days labor 27.00 with team on No. 3 road .. .. . Willis Estes, 4 days labor on No. 3 road. 12.00


119


W. W. Chamberlin, 4 days labor on No. 3 road. 12.00


120


Morgan Smith, 4} days labor on No. 3 road. 11.25


121 Sept. 1 R. E. Doble, 20 hrs. team, 7 hrs. self, labor, 31 miles with car at 7c.


23.16


25


118


122 Sept 1 R. B. Gould, 3 days labor with team.


$ 18.00


123


Willis Estes, 4 days labor on highway .. 12.00


124


W. W. Chamberlin, 4 days, 7 hrs. labor on highway .. 14.33


125


Morgan Smith, labor on high- way 8.19


126


R. E. Doble, 1 day labor with team on No. 3 road. 6.50


127


R. B. Gould, 16 hrs. labor with team on No. 3 road. 10.66


128


Willis Estes, 12 hrs. labor on No. 3 road. 3.83


129


W. W. Chamberlin, 12 hrs. labor on No. 3 road. 3.83


130


Morgan Smith, 1 day labor on No. 3 road 2.50


131


R. H. Clough, labor on high- way from Apr. 1 to May 24, turning water, etc .. ..


10.50


132


133


4 W. H. Bragg, smoothing roads. 6.30 Will Jenkins, 28 hrs. team, 14 hrs. self . 18.20


134


11 R. E. Doble, 5 days labor with team. 32.50


135


R. B. Gould, 5 days labor with team. 30.00


136


Willis Estes, 5 days labor with on highway . 15.00


137


W. W. Chamberlin, 5 days labor on highway. 15.0)


138


Morgan Smith, 5 days labor on highway


12.50


139


Perry Clark, self and team, labor on culvert in front of his house. 3.50


140


Morgan Smith, ¿ day driving on hone, No. 3 road. 1.25


141


R. E. Doble, ¿ day team on hone No. 3 road. 1.50


142


29


R. E. Doble, 2 days labor with team. 13.00


143


R. B. Gould, 72 days labor with team 45.00


144


W. W. Chamberlin, 7 days labor on highway 21.00


26


1


152 Sept 30 W. H. Bragg, honing roads. . ... $ 5.70 153 William Higgins, bill from Apr. 12 to May 22, picking stone, fixing culverts, etc .... . 7.25


161 Oct. 6


162


7


C. E. Bacon, } day with team 3.25 filling ruts on No. 2 road ... . . Harry Pero, 3 days labor on Pero hill. 9.00


171


13


R. E. Doble, man and team 32 days, self, man and team, 1 day labor on culverts, No. Thetford road. 31.75


172


R. B. Gould, 1 day carting stone from Wilson's for culverts on No. Thetford road 6.50


173


Oct. 13


174


15


Willis Estes, 5 days, 3 hrs. on culverts, No. Thetford road .. 16.00 A. B. Clark, pick, sharpening handles, bolts, ironing road drag, etc. 7.25


175


Arthur Smith, 4 days labor with ox team, Pero hill. .. . . .


20.00


183


184


20 Willis Estes, 5 days labor on 15.00 culvert by Sole Berry place. . R. E. Doble, 5 days labor with team and man on culvert by Sole Berry place. 32.50


185


Clarence Wilmot, 9} days labor on culverts by Berry place.


38.00


186


Leroy B. Stowell, labor with team on washouts. 3.00


87


27


R. B. Gould, 3} days honing on No. 3 road.


22.75


188


R. B. Gould, 4 days team, 3 hrs. self.


27.00


189


Will Jenkins, 2 days labor on highway. 6.00


190


Will Jenkins, 2 days labor on No. 2 road. 6.00


191


C. E. Bacon, 3 days labor with team. 19.50


192


Willis Estes, 6 days labor on highway. . 18.00


193


W. W. Chamberlin, 6 days labor on highway. 18.00


194


R. E. Doble, 3 hrs. with team filling holes. 2.38


27


195 Oct. 27 Harold Heaton, filling holes .. . . $ 3.00


196 Nov. 2


George Chase, 2} days filling holes, 1 day honing No. 2 road . 22.75


197


George Chase, 2} days filling holes.


16.25


198


W. H. Bragg, smoothing roads. 3.60


199


10


R. B Gould, 1 day with team on culverts No. 3 road .


6.00


200


17 R. E. Doble, 1 day self, 3 days team on No. 3 road. .


26.25


201


R. B. Gould, 4} days with team on No. 3 road. 27.00


202


Willis Estes, 52 days labor on No. 3 road 16.50


203


W. W. Chamberlin, 52 days labor on No. 3 road 16.50


204


R. E. Doble, 1 day self labor on No. 3 road.


3.50


207


18


R. C. McKelvey, gravel.


9.10


208


Dec. 6 R. E. Doble, 4} days filling holes on No. 3 road 29.50


209


R. B. Gould, 42 days filling holes on No. 3 road. 27.00


210


Willis Estes, 42 days labor on No. 3 road. 13.50


211


W. W. Chamberlin, 42 days labor on No. 3 road. 13.50


212


Gene Illsley, gravel.


2.00


213


George Chase, 5 days with team on No. 2 road, 20 loads gravel.


34.50


214


George Chase, 1 day with team on Mandigo road .. 6.50


215


12


H. H. Southworth, 21 loads gravel. 2.10


216


Orvil Sanborn, turning water, etc.


1.40


217


Roy Barrows, filling holes on No. 3 road. 1.34


218


15 L. F. Kent, fixing culvert by Will Robinson's. 3.00


219


31 C. E. Kibbey, logs, dirt from 4.00 pasture, fixing culvers, etc ... G. A. Clough, fixing washouts .. 1.50


220


Total


$3,233.08


28


State Money on Unselected Roads, (No. Thetford road.)


145


Sept. 29 R. E. Doble, 3 days labor with team $ 21.00


146


R. B. Gould, 3 days labor with team. 19.50


147


C. E. Bacon, 1 day carting gravel. 6.50


148


H. B. Palmer, 1 days carting gravel. 6.50


149


Willis Estes, 3 days labor on highway. 9.00


150


W. W. Chamberlin, 3 days labor on highway 9.00


151


Will Jenkins, 1 day labor on highway. 3.00


154


Oct. 6 R. E. Doble, self, man and team, 52 days. 55.00


155


R. B. Gould, 32 . days carting gravel.


28.53


156


H. B. Palmer, 52 days carting gravel.


35.75


157


George Chase, 52 days carting gravel.


35.75


158


C. E. Bacon, 2 days carting gravel.


13.00


159


Willis Estes, 42 days labor on highway. 13.50


160


W. W. Chamberlin, 52 days labor on highway.


16.50


164


165


13 H. B. Palmer, 4 days, 3 hrs. carting gravel . . 28.16 George Chase, 5 days, 3 hrs. 34.16 carting gravel.


166


C. E. Bacon, 3 hrs. carting gravel.


2.16


167


R. B. Gould, 3 days carting gravel. 19.50


168


R. E. Doble, 72 hrs., man and team, 4 days, 3 hrs., self. 20.57


169


Willis Estes, 3 hrs. labor on highway 1.00


170


W. W. Chamberlin, 5 days, 3 hrs. labor on highway .. . 16.00


176


20


H. B. Palmer, 52 days carting gravel. 35.75


29


177 Oct. 20 George Chase, 5} days carting gravel. $ 35.75


178


C. E. Bacon, 52 days carting gravel. 35.75


179


R. B. Gould, 2 days carting gravel. 13.00


180


R. E. Doble, ¿ day man and team, 4} days self . 19.00


181


W. W. Chamberlin, 5} days labor on highway. 16.50


182


Willis Estes, } day labor on highway. . 1.50


205


Nov. 18 Hial Colton, gravel. 32.90


206


H. C. Sanborn, gravel 4.90


Total $589.13


Total paid by the State


$589.13


OVERSEER OF POOR'S ACCOUNT. For 1919.


Order


No.


1 To S. W. Kinney for partial support to Feb. 1, 1919 $ 12.00


2 To Glen Fifield for board Olive Sawyer. .. .. 25.00


3 To A. W. Jaquith for board and care of Willis Austin. 35.00


4 To Arthur McClure, digging grave for Willis Austin 6.00


5 To Dr. G. W. Weymouth, medical aid for Willis Austin. 21.75


6 To G. A. Fifield, time spent and cash paid out for town poor. 7.10


7 To Rev. C. W. Carvell, preaching Willis Austin's funeral. 3.00


8 To J. P. Morris, goods for Rowell family.


3.50


9 To D. M. Bond, goods for Rowell family. . .


15.55


10 To Mrs. R. C. Clark, clothes for Rowell family. 5.00


11 To A. W. Jaquith, care and bedding burned for Willis Austin's last sickness 19.00


12 To Glen Fifield, board of Olive Sawyer 20.00


13 To S. W. Kinney, partial support to March 1, 1919 12.00


14 To C. S. Wilmot, casket for Willis Austin. . . 40.00


15 To G. A. Fifield, goods and cash paid out for poor to March 1, 1919. 35.90


30


16 To S. W. Kinney, partial support to April 1,1919 ..


$ 12.00


17 To Glen Fifield, board of Olive Sawyer. 25.00


18 To D. W. Laflore, keeping tramps to


April 1, 1919. 6.00


19 To S. W. Kinney, partial support to May 1,1919. . 12.00


20 To J. P. Morris, goods for Olive Sawyer


2.50


21 To Glen Fifield, board of Olive Sawyer . . 20.00


22 To G. C. Fifield, shoes and wrappers for Olive Sawyer 8.28


23 To S. W. Kinney, partial support to June 1,1919. 12.00


24 To Glen Fifield, board of Olive Sawyer


25.00


25 To D. M. Bond, goods for Clara Goulet.


10.55


26 To G. A. Fifield, two trips to North Thet- ford and postage. .


4.25


27 To S. W. Kinney, partial support to July 1, 1919.


12.00


28 To Glen Fifield, board of Olive Sawyer ..


20.00


29 To G. A. Fifield, two trips to Woodsville hospital and cash paid hospital for care and board of Eugene Lang.


29.45


30 To S. W. Kinney, partial support to Aug. 1,1919.


12.00


31 To George Colby, keeping tramps.


4.00


32 To Glen Fifield, board of Olive Sawyer.


16.00


33 To S. W. Kinney, partial support to Sept. 1,1919. 12.00


34 To L. W. Roberts, board of Olive Sawyer. . .


24.00


35 To H. L. Hanson, clothes for Clara Goulet. . 14.00


36 To G. A. Fifield, cash paid out town's poor. .


8.66


37 To S. W. Kinney, partial support to Oct. 1,1919 .. 12.00


38 To L. W. Roberts, board of Olive Sawyer. 20.00


39 To D. W. Laflore, keeping tramps.


1.50


40 To S. W. Kinney, partial support to Nov. 1,1919. 12.00


41 To L. W. Roberts, board of Olive Sawyer .. .


20.00


42 To French & French, shoes and hose for Rowell boy.


2.45


43 To Vermont School for feeble-minded, clothes for Clara Goulet. 1.90


44 To S. W. Kinney, partial support to Dec. 1,1919. 12.00


45 L. W. Roberts, board of Olive Sawyer. 16.00


31


46 To G. A. Fifield, cash and two trips to Union village.


$ 6.00


47 To C. A. Burt, wood for S. W. Kinney 44.25


48 To D. W. Laflore, keeping tramps 2.00


49 To S. W. Kinney, partial support to Jan. 1,1920.


12.00


50 To G. C. Fifield, shoes and rubbers for Clara Goulet. 4.00


51 To L. W. Roberts, board of Olive Sawyer. . . 20.00


Total $736.59


Credit :


Cash received from sale of Willis Austin's


goods, $15.02. 15.02


$721.57


G. A. FIFIELD, Overseer of the Poor.


SUPERINTENDENT'S REPORT.


To the School Directors and Citizens of Thetford:


In accordance with our state law, I herewith submit my annual report as Superintendent of Schools, this report embracing the period from July 1, 1918 to July 1, 1919. Eleven schools have been maintained for 34 weeks each. The attendance for the spring term being as fol- lows: North Thetford, 16; East Thetford, 16; Stevens, 22; Hill, 10; Center, 24; Post Mills, 20; Potato Hill, 11; Swanee Bean, 9; Union Village, 16; Rice's Mill, 20; Judd, 11. Total, 175.


The aggregate total day's attendance was 25,312.5 which was 91.15 per cent of what it might have been had there been no absences. The school in the Judd District ranked highest in attendance, having a percentage of 97.3 the others following in the order named: North Thetford, 95.6; Stevens, 94.9; Center, 94.1; East Thetford, 93.3; Post Mills, 93.2; Rice's Mills, 92.8; Hill, 89.9; Swanee Bean, 86.8; Union Village, 86.7; Potato Hill, 83.6.


My predecessor, Supt. McKnight, visited your schools eight times before leaving for his new field, and I have made ninety-four visits since I came, making a total of one hundred and two visits made your schools by the superintendent.


32


The following pupils have attended the full year without an absent mark: Bernard G. Ilsley, Judd; Dorothy McClary, Center; Charles W. Bacon, Stevens; Phyllis Wheelock and Hattie Wilkie, East Thetford, Raymond Bragg, North Thetford.




Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.