The walk on the north side of Franklin street was not completed, owing to the fact that before the numerous poles located there were moved by the various companies owning them, winter had set in.


The work on the west side of Rowe street opposite land of W. A. Lynde was also left in an incomplete condition, the curbing being set and the walk graded, but the concrete omitted on account of the weather.


On October 10, 1901, the board of aldermen passed an order authorizing curbing to be set on the east and west sides of Main street from Foster to Grove streets. On ac- count of being unable to procure curbing for immediate use at a reasonable expense, the work was not begun.


The appropriation for sidewalks was made under four separate heads, viz:


Repair of present walks.


New individual walks. To complete walks already begun. New continuous walks.


Repair of Present Walks.


2523.71 square yards taken up and replaced with new.


2547.91 top dressed.


STATEMENT OF RECEIPTS AND EXPENDITURES.


Appropriation,


$500 00


66 July 3, 1901, (Order No. 1250), . 500 00


66 Sept. 23, " 1871), . 300 00


Cash received from Tremont street walk, . 163 44


$1,463 44


Expended :


Labor as per pay rolls,


$64 09


Advertising, I 50


Concreting, C. L. Hoffman,


1,291 19


$1,356 78


Cash balance in treasury, .


$106 66


239


PUBLIC WORKS DEPARTMENT.


New Individual Walks.


Walks have been constructed in front of 31 estates, 18 of which were for new walks with curb, and 13 for curb-stone along old walks. The setting of curbing along the line of old walks generally necessitates reconcreting, and as the cost of this work, which amounted to $261.33, cannot, by law be assessed upon the abutter, it has been considered a part of "repair of present walks," and paid for out of that ap- propriation.


STATEMENT OF COLLECTIONS. W. DABNEY HUNTER, DR.


To one half actual cost,


" inside work,


$1,125 79 19 73


$1,145 52


CR.


By cash paid Treasurer,


$1,116 05


" one half of work not assessable, 15 04


" amount uncollected, 14 43


$1,145 52


240


PUBLIC WORKS DEPARTMENT.


INDIVIDUAL SIDEWALKS.


No.


Abutter.


Location.


Cost.


Assessed.


1


Stephen R. Sircom


81 Linden street. .


$47.78


*$26.80


2


Mrs. E. H. Curtis ..


384 Main street


36.12


18.06


3


Larkin L. Davis ...


Laurel street


37.94


18.97


4


Mrs. Mary A. Foster.


223 West Emerson street


113.57


56.79


5


J. A. Wyman


Laurel street .


37.94


18.97


6


J. H. Gerrish


25 Farwell street.


90.31


45.16


7


D. W. Fitzpatrick .


49 Upham street


32.72


16,36


8


Frederick C. Page .


Laurel street


75.88


37.94


9


Caroline A. Lamphrey


87 Crescent avenue .


41.01


20.51


10


C. L. Sprague.


116-118 Myrtle street


73.04


+41.02


11


Mrs. J. L. Campbell ..


35 Harvard street


37.72


#22.66


12


C. M. Cox


Franklin street. ..


62.52


31.26


13


Geo. Lyall.


203 E. Foster street.


55.13


27.57


14


School Dept.


Maple street.


139.70


§55.93


15


Florence street .


262.61


131.31


16


Mary C. Barton


Malvern street, cancelled


85.52


42.76


18


Mrs. E. M. Gordon


64 Hillside avenue


61.34


30.67


19


Lewis A. Dow


131 Upham street.


48.78


24.39


20


Edward S. Page


Upham st. cor. Dell av .


62.59


31.30


21


Salt & Allmon


3 and 7 Cass street


87.13


43.57


22


J. J. Garrett


11-15-19 Cass street .


119.59


1164.84


27


Chas. C. Swett.


132 Rowe street.


35.20


17.60


28


Dr. J. S. Clark


Malvern street ..


45.75


22.88


29


Wm. J. Bowser


Malvern street.


34.50


** 16.13


30


James Pope.


219 W. Emerson street ..


90.59


45.30


31


C. D. Cecca.


51 Upham street.


30.97


15.49


32


Geo. W. Burke


Green street ..


33.89


16.95


33


A. C. M. Currier


Main street, cancelled .


119.49


++63.23


Totals


$2,251.43


$1,130.48


NOTE .- In amount assessed. $19.73 is included for work done inside, all of which was charged to the abutter, and is not included in the column of cost.


NOTE .- In the column of cost, $30.08 is included, none of which is assessable.


Owing to fractions the amount assessed is 8 cents larger than one half the cost.


* $2.91 paid for inside work.


+ $4.50 paid for inside work.


# $3.80 paid for inside work.


¿ $13.92 credit for old concrete walk.


| $5.04 paid for inside work.


** $1.12 credit for old concrete walk.


+1 $3.48 paid for inside work.


23


Emery Close


234 West Emerson st .


45.00


22.50


25


M. F. Eastman


480 Lebanon street.


40.51


20.26


26


A. F. Evers ..


Ferdinand street .


166.59


83.30


17


Robert Philpot


76 Dell avenue. .


24


Olive W. Allen


264 Grove st., cancelled .


34


Mrs. S. C. Gwynne


Botolph street


241


PUBLIC WORKS DEPARTMENT.


NEW INDIVIDUAL WALKS.


Appropriation, . $700 00 66 (Order No. 1250), 1,000 00


16


1871), 500 00


--- $2,200 00


Cash receipts paid treasurer


July 16, 1901, . $500 00


Cash receipts paid treasurer Oct.


28, 1901, 350 00


Cash receipts paid treasurer Jan. 4, 1902, 239 97


Cash receipts paid treasurer Feb. 1I, 1902, 26 08


1,116 05


Cash from sewer division for


brick, . $25 80


Cash from new concrete walks,


(error in P. R.), 23 78


49 58


$3,365 63


Expended :


For labor as per pay rolls, . $680 94


curbing, F. E. Newhall, . 1,409 27


66 66 L. A. Dow, 44 62


brick, Frederick Stocker, 169 63


" concrete work, C. L. Hoffman, 276 88


Robert Philpot, 3I II


laying brick, Eugene McCarthy, 46 83


" cement, sewer division,


5 55


66 teams and crushed stone, highway division, 37 22


For car fares,


95


" printing and incidentals,, I2


75


2,715 75


Cash balance in treasury,


$649 88


242


PUBLIC WORKS DEPARTMENT.


Continuous Walks.


This appropriation was made in two parts, one to com- plete sidewalks begun, but owing to lack of funds, not com- pleted in 1900, the other for such walks as might from time to time be ordered by the Board of Aldermen. A state- ment of the receipts and expenditures of each part of the appropriation is given separately, but the work done is re- ported on as a whole.


STATEMENT OF RECEIPTS AND EXPENDITURES.


TO COMPLETE CONTINUOUS WALKS BEGUN.


Appropriation, . Expended :


$800 00


For brick, Frederick Stocker, $240 45


" laying brick, Eugene McCarthy, IIO 85


curbing, F. E. Newhall, 28 09


.6 sand, C. L. Hoffman, 56 47


66 £ Highway teams, 2 34


labor as per pay rolls, 73 59 653 79


Amount transferred to treasury, (Order No. 1424) $146 21


NOTE: - Of the amount expended as above ($653.79), there was ex- pended to complete Main street, from Green street to Highland avenue $519.02; Chester street, Florence to Trenton street, $56.47, and Lake avenue, Emerson street, north, $78.30.


STATEMENT OF RECEIPTS AND EXPENDITURES.


NEW CONTINUOUS WALKS.


. $1,000 00


Appropriation, . (Order No. 1250.) 500 00 66 .. I 366.) 669 00


$2,169 00


Expended :


For curbing, F. E. Newhall, $781 10


6. concreting, C. L. Hoffman, . 335 27


" Highway Div. teams and stock, 26 91


" new indiv. walks (error in pay roll. ) 23 78


" car fares and team, 1 80


labor as per pay rolls, . 256 69


$1,425 55


Cash balance in treasury,


$743 45


243


PUBLIC WORKS DEPARTMENT.


COST OF WORK IN DETAIL, TOGETHER WITH THE AMOUNT ASSESSED ON EACH ABUTTER.


Ferdinand Street, east side from Franklin street, to walk of Towle. (Order No. 225).


Total cost :


413.90 linear feet, straight curb @ 40 cts., . . $165 56


287.50 linear feet, curved curb @ 60 cts., 172 50


701.40 linear feet, setting @ 20 cts., 140 28


463.18 square yards, concrete, @ 35 cts., 162 II


30.CI square yards concrete, @ 15 cts., 4 50


Guard rail :- Labor, $43 67


Stock, 49 03


92 70


Retaining wall, .


115 00


Grading :- Labor, $24 75


Stock,


4 20


28 95 $881.60


Cr. by work charged to high- way appropriation:


Guard rail, $92 70


Retaining wall, 115 00


Grading,


28 95


236 65


Cr. by work charged to Side- walk Division ( not assess- able):


C. H. Prescott (old


walk replaced), . $13 99


Joseph Moore, (old walk replaced ), 14 17


Geo. E. Towle, (old walk replaced), 87 29 03 265 68


Less one-half paid by city,


$615 92


307 96


· Amount carried forward, $307 96


244


PUBLIC WORKS DEPARTMENT.


Amount brought forward, $307 96 Assessed upon abutters as follows:


C. H. Prescott, $44 645


Harry Bickford,


47 83


Abel R. Renton,


36 08


A. E. Pingree,


29 60


Joseph Moore,


16 875


John W. Nowell,


46 765


Geo. H. Towle, .


44 50


Willard Welch, .


41 67


- $307 965


Main Street, east side from Green street to


Highland avenue, (Order No. 296),


Total cost :


684.64 linear feet, straight curb


@ 40 cts., . $273 86


64.98 linear feet curved curb @ 60 cts., 38 99


27,500 brick @ $10.75, 295 62


Laying “


3.50, 96 25


Setting 749.62 linear feet curb @ 2013% cts., . 152 13


Grading walk, 44 37


35 double loads sand, @ $1.20, 42 00


943 22


Cr. by work not assessable, 14 62


$928 60


Less am't paid by city 1/2 cost, $464 30


Less one-half cost inside work, 2 13


462 17 466 43


Assessed upon abutters as follows :


James F. Fernald, $ 37 08


Eliza J. Sawyer, 35 67


Georgianna I. Nyman, 31 35


Amts. carried forward, $104 10


$774 39


245


PUBLIC WORKS DEPARTMENT.


Amts. brought forward, $104 10


$774 39


M. G. Cochrane,


28 06


Alice I. Calkins,


54 82


Adelaide L. Burke,


37 92


Warren Hapgood,


75 95


Charles A. Kennedy,


37 92


Matthew I. Lans,


127 66


$466 43


Chester Street, north side from Trenton street to Flor- ence street, (Order No. 273.) Total cost :


252.12 linear feet, straight curb @ 40c. $100 85


6.00 linear feet, curved curb @ 60c. 3 60


166.10 square yards. concrete @ 34C. 56 47


Setting 258.12 linear feet


I4C. 36 14


$197 06


Less one-half paid by city, 98 53


98 53


Assessed upon abutters as fol-


lows:


Sarah H. Sprague, . $ 23 98


Cordelia E. Dickinson, 19 33


Anna D. Hayden, 19 33


Andover Savings Bank,


35 89


$98 53


Lake Avenue, Emerson street, north, (Order No. 341.) Total cost :


152.00 linear feet straight curb (1, 40C. $60 80


12.50 linear feet curved curb (@ 60c. 7 50


Amts. carried forward,


$68 30


$872 92


246


PUBLIC WORKS DEPARTMENT.


Amts. brought forward, $68 30 $872 92 Setting 164.50 linear feet curb.


@ 20c. 32 90


Grading, 29 17


4,170 brick @ $10.75, 44 83


Laying brick @ $3.50,


14 60


$189 80


All of which abuts on city land.


Lebanon Street, east side, (Order No. 488 1/2 ).


Total cost:


65.99 linear feet straight curb @ 45C.


$29 69


Setting 65.99 linear feet curb @ 21c. . 13 88


46.00 square yards concrete @ 34c. 15 64


$59 21


Less one half paid by city,


29 61


29 60


Assessed upon abutter :-


Estate George Lynde. $29 60


West Linden Street, north side from Green to Main street, (Order No. 410).


Total cost:


442.16 linear feet straight curb @ 45 cts., . $198 98


29.76 linear feet curved curb, @ 65 cts. . 19 34


29.17 linear feet curb for steps, . 13 12


471.92 linear feet setting @ 15% cts., 71 74


Amounts carried forward,


$303 18


$902 52


247


PUBLIC WORKS DEPARTMENT.


Amounts brought forward, $303 18 415.91 square yards concrete @ 34 cts., I4I 4I


Grading banks of abutters,


22 86


Steam roller, 3 00


Teaming and labor, .


76 85


Water services and pipes,


16 48


$563 78


Cr. by work charged to Highway Appropriation:


Grading banks of abut- ters, . $22 86


Steam roller, .


3 00


Teaming,


IO 63


Labor as per pay roll, .


66 22


29.17 linear feet curb for


steps, 13 12


$115 83


Cr. by work charged to Water Appropriation :


Lowering water services and re- laying pipe, 16 48


Cr. by work charged to new concrete walks:


94.46 square yards concrete .


@ 34 cts.,


32 12


164 43


$399 35


Less one-half paid by city, .


199 67


$199 68


Assessed upon abutters as follows:


Lucy P. Coffin, . $90 18


C. F. Smith,


20 95


F. A. Smith,


41 71


Georgianna B. Everson, 46 84


$199 68


Amount carried forward,


$1,IC2 20


$902 52


248


PUBLIC WORKS DEPARTMENT.


Amount brought forward, $1,102 20


Lebanon and Lynde Streets, (Washington School, Order No. 981).


Total cost:


304.82 linear feet straight curb @ 45 cts., . $137 17


71.96 linear feet curved curb


@ 65 cts., 46 77


Setting 376.78 linear feet curb


@ 17 cts., 64 07


Grading and surfacing walk, 43 25


Rebuilding stone catch-basin and changing drain, 16 17_


307 43


Cr. by work charged to new concrete walks, . 16 17


$291 26


Less one-half paid by city,


145 63


145 63


Assessed upon abutter as follows:


City of Melrose, School Depart- ment, $145 63


Franklin Street, north side from Main street to Howie court, (Order


No. 1320).


Total cost:


168.83 linear feet straight curb @ 45 cts., $75 97


50.94 linear feet curved curb @ 65 cts., 33 10


Setting 219.77 linear feet curb @ 21.79 cts., 47 88


Repairing paved gutter, 6 12


Amount carried forward, 163 07


$1,247 83


249


PUBLIC WORKS DEPARTMENT.


Amounts brought forward, $163 07 $1,247 83 Cr. by work charged to Highway Appropriation :


Repairing paved gutter, $6 12


Existing curb, 15.64 feet @ 45 cts., 7 04


13 16


Less one-half paid by city,


$149 91 74 96


74 95


Assessed upon abutters as follows:


Daniel H. Howie, $20 33


Seamen's Savings Bank, 15 35


Emma L. Wood,


39 27 $74 95


Malvern Street, south side, from No. 103 to Meridian street, (Order No 551).


Total cost :


183.73 square yards concrete @ 34 cts.,


62 47


Less one-half paid by city, 31 24


31 23


Assessed upon abutters as follows:


J. S. Clark, $18 99


J. S. and Eliza I. Clark, IO 23


Mary C. Barton, 2 0I $31 23


East Foster Street, from No. 185 to No. 203, (Order No. 1270).


Total cost:


163 linear feet straight curb @ 45 cts., $73 35


12.67 linear feet curved curb @ 65 cts., 8 23


161.70 square yards concrete @ 34 cts., 54 98


Amts. carried forward,


$1 36 56


$1,354 OI


250


PUBLIC WORKS DEPARTMENT.


Amts. brought forward, $136 56 $1,354 OI Setting 173.67 linear feet curb


@ 12100 cts., 21 63


158 19


Cr. by work charged to new con- crete walks, 9 square yards concrete @ 34 cts., 3 06


$155 13


77 57


Less one-half paid by city, 77 56


Assessed upon abutters as follows:


M. E. Buck, $26 28


T. R. Rhodes,


24 82


Elizabeth E. Knox,


26 46 $77 56


West Foster Street, (Order No. 1356).


Total cost:


168.7 linear feet straight curb @ 45 cts.


$75 92


Setting 168.7 linear feet curb @ II 59 cts., 19 56


180.3 square yards concrete


@ 34 cts., .


61 30


Labor removing trees, 3 33


Repair catch-basin (labor and material ), IO 12


$170 23


Cr. by work charged to trimming and removal of trees, . $3 33


Cr. by work charged to new con- crete walks and not assess- able, 17 28


Cr. by work charged to catch- basins and drains, IO 12


30 73


Amounts carried forward, . $139 50 $1,431 57


251


PUBLIC WORKS DEPARTMENT.


Amounts brought forward, . $139 50 $1,431 57 Less one-half paid by city, 69 75


69 75


Assessed upon abutters as follows:


Wm. Bogle estate, $69 75 Total charged to abutters, . $1,501 32


RECAPITULATION.


Repair of present walks, appropriations and receipts, $1,463 44


New individual walks, appropriations and receipts, 3,365 63


To complete walks already begun, appro- priations and receipts, 800 00


New continuous walks,


2,169 00


.


$7,798 07


CONTRA.


Curbing, . $2,263 08


Concreting,


. 1,990 92


Labor,


. 1,099 09


Printing and advertising,


14 25


Brick,


510 08


Laying brick,


157 68


Cement,


5 55


Sand,


42 00


Car fares,


2 75


Teaming and stock from yard, 66 47


6,151 87


Unexpended balances, $1,646 20


Total expenditures, .


$6,151 87


Total receipts, .


. $1,329 07


Assessments levied, . 1,5Q1 32


2,830 39


Net cost to the city,


$3,321 48


252


PUBLIC WORKS DEPARTMENT.


STREET WATERING.


This work is done under the provision of Chapter 24 of the city ordinances. No appropriation is made ; the treas- urer is authorized to pay the bills in anticipation of the col- lection of the assessments. 1617 assessments were levied on the abutting estates, and certified to the assessors, the amount of assessments being as follows:


Vacant land,


Occupied land,


$ 283.78 3,624 67


$3,908 44


Expended:


Robert Philpot, sprinkling,


$ 104 62


C. L. Hoffman,


2,746 54


Labor and inspection, pay rolls,


300 82


Repairs to watering carts,


199 24


Repairs to stand pipes,


145 03


Teams, highway division,


4 38


Making schedules for assess- ment,


35 00


Advertising and printing,


6 75


Expressage,


15


3,542 51


Surplus of assessment over expense, in 1901, . $ 365 93


Statement of Street Sprinkling Fund, February 1, 1902.


Amount of 1899 assessment


(uncollected January I, 1900) .


$1,552 97


Amount of assessment 1900, .


3,925 92


Amount of assessment 1901,


3,908 44


$9,387 33


Expended :


Deficiency, January 1, 1900,


$1,183 79


Expended 1900,


4,334 60


Expended 1901,


3,542 51


9,060 90


Surplus,


$ 326 43


253


PUBLIC WORKS DEPARTMENT.


On April 5, 1901, the board of aldermen passed Order No. 1103, authorizing the following named streets sprinkled:


Lin. ft.


Ashland st., from Melrose st. to Highland av. 1,241


Adams st., from Wyoming av. to Russell st. . 827


Batchelder st., from Bellevue av. to Porter st. 869


Bellevue av., from Linden st. to Upham st. 2,442


Berwick st., from Foster st. to Wyoming av. . 1,230


Botolph st., from Franklin st. to West Hill av. 373


Cottage st., from Foster st. to Wyoming av.


1,140


Emerson st., from Poplar st. to Orient ave 4,773


Essex st., from Emerson st. to Main st. 1,897


Florence st., from Foster st. to Russell st.


2,132


Foster st., from Vinton st. to Larrabee st. 4,784


Franklin st., from Main st. to Stoneham line 4,847


Green st., from Main st. to Porter and Lebanon sts.


2,834


Greenwood st., from Franklin st. to Woodland av.


1,147


Grove st., from Berwick st. to Sixth st. 4,697


Herbert st., from Berwick st. to Myrtle st.


379


Howard st., from Green st. to M. G. Cochrane's


1,244


Hurd st., from Cottage st. to B. & M. R. R. ..


776


Hillside av., from Bellevue av. to argle in street


336


Highland av., from Sargent st. to Cliff st


609


Lake av., from Emerson st to Tremont st.


1,224


Lebanon st., from Porter st. to Beech av.


3,459


Lynde st., from Main st. to Summer st. 1,234


Laurel st., from Lebanon st. to Gooch st. 664


Main st., from Greenwood line to Malden line 11,994


Malvern st., from Potter street to Meridian st.


1,325


Meridian st., from Grove st. to Beech av.


737


Melrose st., from Vinton st. to Belmont st. 654


Melrose pl., from Melrose st. 284


Myrtle st., from Grove st. to Emerson st. . 2,227


North av., from Walton pk. to Stoneham line 693


Orris st., from Vinton st. to Walton pk. 1,090


Orient av., from Porter st. to Emerson st. 1,015


Pleasant st., from Wyoming av. to Ashmont st. 1,361


Rowe st., from Emerson st. to Upham st. 563


Tremont st., from Emerson st. to J. P. Deering's


Tremont st., from Franklin st. to Melrose st ..


848


Upham st., from Main st. to Sewall st. .


2,511


Wyoming ave., from Stoneham line to East line G. T. Brown Est. . 4,446


Walton pk , from Franklin st., to Orris st. 832


Warren st , from Franklin st. to Orris st. 614


Youle st., from Vinton st. to Leeds st. 892


During the year certain others were added as follows :


June 1st, Dell av., from Upham.st. to Winter st. 362


July 3rd, Howard st., in front of No. 134 250


Total 85,862


Advertisements were inserted in the local papers asking for bids; six bids or proposals were received and opened April 22, 1901, which are given below.


566


Trenton st., from Foster st. to Washington st.


2,560


Vinton st., from Franklin st. to Foster st. 4,880


254


PUBLIC WORKS DEPARTMENT.


CANVASS OF BIDS FOR SPRINKLING ABOUT 85,000 FEET OF STREETS, OPENED APRIL 22, 1901.


C. L. Hoffman


$32.75 per 1,000 ft. per season


$2,783.75


Philip Keating


35.00 66


2,975.00


Norris & Co. .


36.27 66


3,082.95


Robert Philpot


42.00


. 4


3,570.00


F. A. Pratt.


.44.70


3,799.50


J. Gibbons


46.80


3,986.50


The bid of C. L. Hoffman was accepted. He signed a contract and gave a bond of $1,000 for its faithful perfor- mance. By the terms of this contract, the city paid for each 1,000 feet sprinkled during the months of


May


$3.75


September $5.00


June


5.00


October


4.00


July


6.00


November


3.00


August


6.00


December 0.00


Total for 8 months $32.75


Early in the season, numerous complaints were received that the work was not satisfactory. An inspector was em- ployed to look after this and see that the provisions of the contract were complied with, after which few complaints were received and the work was more satisfactorily performed.


STREET LIGHTING.


The city is lighted by contract with the Malda Electric Light Company, which supplies 52 arc lanips of 2,000 candle power and 522 incandescent lamps of 25 candle power. These are burned each dark night troth ilask until 12.15 o'clock a. m., and the arc lights are also lamed from 5 o'clock a. m. until daylight during the morin of Novem- ber, December, January, and February, the pice by con- tract being $73.68 per year for arc lights and! $15.50 per year for incandescent lights.


This contract expired August 4th, 1901, and the lights were continued at the old schedule price naul the end of the year, January 31, 1902. No new lights have been added during the year


The Malden Electric Company has taken up the slack


255


PUBLIC WORKS DEPARTMENT.


in all of their wires and renewed all dangerous poles; some of the lines were entirely reconstructed, and are more satis- factory; still other lines need to and probably will be re- built the coming season.


Appropriation,


order No. 1449,


$11,000 00 1,025 00


12,025 00


Expended :


Paid for advertising, . $10 58


" Malden Electric Company,


11,955 51


11,966 09


Balance in treasury, $58 91


PARKS.


All of the small public grass plots within the city, includ- ing the grounds around City Hall, were fertilized and the grass kept cut.


New seats were placed on the edge of Ell Pond at Main street.


PARK MAINTENANCE.


Appropriation, .


$200 00


Receipts paid to treasurer, 1 00


$201 00


Expended :


For labor and teams, A. W. Lynde, $78 78


seats at Ell Pond, W. A. Goodno, II 25


zincing “ Brock Bros. II 36


lumber, seats at Howard street, L. C. Hoyt, .


4 42


preparing and planting bed of tulips, C. Casey, I 50


113 16


Cash balance in treasury,


$87 84


256


PUBLIC WORKS DEPARTMENT.


CITY HALL.


On July 9, 1901, the board of aldermen passed Order No. 1290, appropriating $5,500.00 for repair of the outside of the City Hall building and for improvements in the audi- torium ; later this appropriation was increased by $300.00.


The work was advertised, bids received and contracts made as follows: . for slating, tinning and metal work $233.00; scraping and pointing brick work $240.00 ; two new balconies $88.00 each; repair of wood-work on outside of building $225.00 ; relaying floor of auditorium $493.70 and for all additional floors 12 cents per square foot ; for all plastering 40 cents per square yard ; for all painting inside and out $835.00; for decorating the city auditorium $800.00 ; for electric wiring and fixtures $650.00; for new seats in the auditorium $1,537.50. Lewis A. Dow, architect, was em- ployed to look after the work; a contract was made with William Morss for doing all work except wiring and fix- tures and new seats; wiring was done and fixtures furnished by John A. Cameron & Co. of Gloucester and seats were purchased of Heywood Brothers and Wakefield Company, they agreeing to keep the same in repair for a term of ten years.


In addition to this work, arrangements were made later with Mr. Morss for changing the appearance of the stage by erecting two wooden columns on either side, connecting them by an elliptical arch, greatly improving the appear- ance of the auditorium.


In addition to repairs on the outside of the building and improvements of the city auditorium, still other repairs should be made, principal of which is the cementing of the basement, renovating of the plumbing and erection of shelves in the room over the auditorium for the storage of books, etc. The cost of this work would not be great, but · the amount appropriated annually for the running expenses of the building has been so small that, notwithstanding the most rigid economy, it has been exceeded each year.


-


257


PUBLIC WORKS DEPARTMENT.


CITY HALL IMPROVEMENT.


Appropriation,


. $5,500 00


(Order No. 1421.) . 300 00


Expended:


John A. Cameron & Co., con- tract hall, . $650 00


John A. Cameron & Co., con- tract stage, . 12 25


John A. Cameron and Co.,


switch and plugs. 2 20


John A. Cameron & Co., extra work, . ,97 96


$762 41


Wm. Morsson architect estimate $768 60


66 66


810 00


66 66 66 66


1,424 10


3,002 70


Wm. Morss, extra work,


201 12


L. A. Dow, architect,


168 73


Brock Brothers, contract, . 66


· $35 22


2 34


37 56


Advertising,


12 38


Typewriting contracts,


58 50


70 88


R. M. Gibson, painting new arch,


12 00


4.255 40


Balance in treasury, .


The receipts for use of auditorium have been less than usual, which is due to the fact that it was undergoing re- pairs from the middle of August to the first of January. It has been engaged only twenty seven times, for eight of which no charge was made.


$1,544 60


.


258


PUBLIC WORKS DEPARTMENT.


LIST OF ENGAGEMENTS.


Rehearsals, 4,


$40 00


Payment of expense, I, .


II I7


Afternoon, 2, .


10 00


Full charge;


12, .


240 00


Free,


8, .


Totals,


27


$301 17


STATEMENT OF COLLECTIONS.


DR.


To rent of city auditorium, .


$301 17


sale of old seats,


100 45


sale of plans by Larrabee & Stearns, 2 25


$403 87


CR.


By cash paid treasurer, rent of auditorium $256 17


sale of old seats, . 76 75


am't uncollected, rent of auditorium, 45 00


sale of old seats, 23 70


" paid treasurer, sale of plans, 2 25


403 87


JANITOR SERVICE.


Appropriation, . Expended :


$750 00


C. J. Wing, 12 months' salary, $720 00


5 28


725 28


Balance in treasury, $24 72


HEATING.


Appropriation, . Expended :


$275 00


C. B. & F. H. Goss, for coal, 44 50


S. E. Benson & Co., " "


230 00


274 50


Balance in treasury, .


$ 50


Labor moving seats,


259


PUBLIC WORKS DEPARTMENT.


LIGHTING.


Appropriation,


$775 00


Expended :


Malden & Melrose Gas Light Co. . .


$489 12


Malden Electric Co. 360 89


850 OI


Deficiency,


75 0I


$850 01 $850 OI


Bills in hand of auditor, unpaid.