15,370.15 671.72


....


·


$35,271.50


SEWER EXTENSION ORDERED IN 1931, COMPLETED IN 1932


Lancaster Road ($4,847.08 expended in 1931) Total cost of mains


15


994


4,855.67


$40,127.17


*General Expense


...


... .


10,440.55


$50,567.72


Credit received from other departments


667.63


Credit for stock


94.07


Totals


5.643


$49,806.02


...


. .


.


.


.


..


..


.. .


384


* Stock, $268.01; particular sewers, $3.69; tools and equipmen, $843.51; miscellaneous, $1,968.51; Saturday afternoons, $2,577.90; vacations, $2,217.85; holidays, $1,501.50; automobile $47.86; timekeeper, $665.27; stockkeeper, $346.45. "W" indicates sewer and water in same trench.


385


REPORT OF THE BOARD OF PUBLIC WORKS


TABLE V.


SEWER MAINTENANCE DIVISION


Appropriation for 1932


$4,560.50


Transferred from Reserve Fund


60.00


$4,620.50


Expenditure


4,619.74


Balance, Jan. 1, 1933


$0.76


Expenditures


Repairing, flushing and cleaning mains.


$3,581.11


Care and Repair of Particular Sewers.


168.46


Miscellaneous


317.19


*General Expense


552.98


Total


$4,619.74


*Tools and Equipment, $99.11; Saturday afternoons, $277.85; Holiday, $58.42; Vacations, $58.50; Timekeeper, $59.10.


SUMMARY OF SEWERAGE STATISTICS


General


Population by census of 1930, 36,089.


Total area of town, 5.5 square miles.


Area served by sewerage system, 4.5 square miles.


Collection System


For sewerage only, 71.08 miles, includes 5.64 miles Metropolitan sewer.


For sewerage and surface water, 0 miles.


For surface water only, 28.13 miles.


Method of disposal, sewerage into Metropolitan sewer, surface water into brooks.


386


ARLINGTON TOWN REPORT


Collection


Mains. (Everything but house and catch basin con- nection.)


For Sewerage For Surface only only


1. Lineal feet pipe. 375,296


148,502


2. Lineal feet extended during year 5,643 6,382


3. Number of inverted siphons, 2.


4. Number of manholes, 1,801, and 32 combination sewer and storm drain manholes.


5. Method of flushing: Water service at manhole ends of lateral lines.


6. Method of cleaning: By a special brush drawn from manhole to manhole.


7. Number of automatic flushing tanks, 0.


8. Number of direct connections with water mains for flushing, 40.


9. Number of flushings of system during the year, entire system once.


10. Cost of flushing per mile


11. Cost of cleaning per mile $51.15


12. Number of stoppages, 10.


13. Method of ventilation, manhole covers.


14. Electric pump chambers, 2.


House Connections


1. By whom made: All connections made under the direction of the Sewer Division, Board of Public Works.


2. Sizes, 5, 6, 8, 10, 12 and 15 inches.


3. Number made during year, 129.


4. Lineal feet laid during year (drain layers), 6,493.8.


5. Lineal feet discontinued during year, 0.


6. Total miles in use, 55.73.


7. Number of stoppages coming to attention of De- partment, 15.


387


REPORT OF THE BOARD OF PUBLIC WORKS


Discharge of Sewer


1. Estimated population using sewer system, 32,500.


2. Number of buildings connected, 6,110.


3. Daily discharge for year .*


4. Daily discharge for each user .*


5. Daily quantity of factory waste .*


6. Daily leaking into sewers .*


7. Daily leaking per mile of sewers .*


8. Are quantities given under 3 to 7 estimated or measured ?*


*Note-See Metropolitan Sewerage Board Report.


General


Total cost of collecting mains, $1,055,558.63.


Debt outside of limit, $100,000.00.


Sinking Fund, $85,868.86.


Serial Notes, $34,000.00.


Average rate of interest on bonds outstanding, 4 per cent.


Proportion of cost of extensions assessed on abutters this year, 53.27 per cent.


Yearly assessment for maintenance, none.


Method of assessing abutters and rate of assessment, as specified by the acts of 1930, chapter 140.


WATER DIVISION


Six thousand, two hundred and seventy-five feet of new water mains were laid during the year and connected with the Metropolitan system, and one thousand eight hundred and eighty-two feet of mains were renewed dur- ing the year. Details of regular water main construction will be found in Table 6.


388


ARLINGTON TOWN REPORT


SERVICES


One hundred forty-four new services have been added during the year and twelve services abandoned. There are for all purposes, 3,249 on the low, 4,054 on the high, and 3 on the old reservoir system. On the Metro- politan water supply there are 40 services for municipal purposes, 32 sprinkler services, 2 for street watering standpipes, and 40 for sewer flushing purposes included in the above. On January 1, 1933, 281 services were tem- porarily out of use.


METERS


One hundred forty-four meters were set during 1932 on services installed in 1929, 1930, 1931 and 1932. The total number of meters in use January 1, 1933, is 7,232.


WATER MAINS NOW IN SERVICE


LOW SERVICE SYSTEM


HIGH SERVICE SYSTEM


RESERVOIR SYSTEM


Size


Cement-lined Pipe


Cast Iron Pipe


Cast Iron Pipe


Cement and Cast Iron Pipe


Inches


Length Feet


Hyd.


Gates


Length Feet


Hyd.


Gates


Length Feet


Hyd.


Gates


Length Feet


Hyd.


Gates


16


2,388


..


12


6,791


29,104


7,392


389


10


13,864


22,848


270


8


37,449


55,191


1,576


6


185


101,020


152,494


2,267


4


373


616


1,620


Totals


558


2


5


159,740


311


451


262,025


528


980


13,125


12



TABLE VI.


WATER EXTENSIONS


Appropriation


$42,977.00


Balance from 1931 forwarded


1,023.85


$44,000.85


Expenditure


38,974.88


Balance, Jan. 1, 1933


$5,025.97


EXTENSION OF HIGH SERVICE SYSTEM


LOCATION


.


Size of Pipe in Inches


Length in Feet


Number of Hydrants


Number of Gates


Total Cost


Cost per Foot


Totals


Aberdeen Road (Argyle Road to Roslin Street)


8


223.70


2


$654.11


$2.92


S


Bradley Road (Winchester Road to Walsh property)


8


555.27


1


4


1,726.73


3.11


S


Crosby Street (ordered in 1931, completed in 1932)


8


48.20


... .


1.


191.76


3.98


Endicott Road (old end to Gray Street).


8


348.53


1


2


1,854.96


5.32


.....


.. .


8


537.90


2


4


1,630.94


3.03


Hemlock Street (old end to 170 ft. north of Governor Rd.)


10-12


450.82


1


3


1,415.73


3.14


S


Jason Street (old end to service No. 172) .


8


68.00


352.04


5.18


S


Kenilworth Road (Hawthorne Avenue to No. 39)


12


298.00


1


1


1,284.66


4.31


S


Madison Avenue (Westmoreland Avenue southerly) .


8


347.10


1


2


1,309.03


3.77


Massachusetts Avenue (cross between high and low service at Menotomy Road)


10


27.35


2


742.08


.


Massachusetts Avenue (cross between high and low service at Grove Street)


10


64.70


4


893.19


·


. ..


8


265.90


1


.


1


1,087.33


4.09


Perth Road (old end to No. 16) .


- 8


207.60


1


2


732.88


3.53


.. . ...


Radcliffe Road (old end to Cutter Farm)


8


118.70


. ...


1


286.23


2.41


Shawnee Road (old end to No. 29) .


6


134.20


.


366.71


2.73


·


.


8


158.60


·


1


930.06


5.86


... . ...


S


Gray Street (survey for proposed main)


. ...


. . ..


·


7.19


Heard Road (Forest Street to Wright Street)


... .


·


. .


1


135.13


Massachusetts Avenue (installing gate at Mt. Vernon Street) Park Avenue (Appleton Street to No. 155)


.....


..


390


.. .


......


S


Governor Road (Hemlock St. westerly) .


.


...


EXTENSION OF HIGH SERVICE SYSTEM-(Continued)


LOCATION


Size of Pipe in Inches


Length in Feet


Number of Hydrants


Number of Gates


Total Cost


Cost per Foot


Totals


Sunset Road (old end to No. 93, ordered in 1931, completed in 1932)


75.20


1


1


486.63 96.02


6.47


Sunset Road (old end to No. 98) ..


32.00


Temple Street (Lockeland Avenue to No. 50)


8


486.68


1


2


2,040.95


4.19


S


Valentine Road (Dow Avenue to No. 29) ..


8


266.40


1


1


1,202.12


4.51


Valley Road (old end to lot 7B) .


8


96.80


1


310.91


3.21


S


Winchester Road (old end to No. 92).


8


185.75


1


3


956.94


5.15


S


.


....


.. .


4,997.40


13


39


$20,694.33


$20,694.33


391


EXTENSION OF LOW SERVICE SYSTEM


1


Burch Street (Dorothy Road to Osborne Road)


S


259.82


1


471.72


1.82


S


Massachusetts Avenue (install hydrant between Grove Street and Brattle Street) .


6


7.00


3


1


406.43


..


.


8


9.70


2


154.61


. . .


.


8


18.00


....


1


110.99


·


... .


.


.. .


3


... .


. ....


.


.


.


... .


2


11


.


TOTAL EXTENSIONS.


...


5,291.92


18


61


$21,838.08


.


3.00


. ..


. . .


......


.


. Medford Street (at Compton Street) . Beacon Street (new gates installed by Water Maintenance) Park Street (new gates installed by Water Maintenance) New gates and hydrants installed with renewal of mains. See tables below.


294.52


$1,143.75


$1,143.75


. .


. . .


. .. .


3


Massachusetts Avenue (at Prentiss Road)


... .


.


......


RENEWALS-HIGH SERVICE


LOCATION


Size of Pipe in Inches


Length in Feet


Number of Hydrants


Number of Gates


Total Cost


Cost per Foot


Totals


*Dudley Court (Dudley Street southerly). Massachusetts Avenue (relocate hydrant between Grove and Brattle Street)


6


176.50


..


3


464.44


5.12


. .


.


6


81.70


. .. .


... .


794.60


....


.


.


RENEWALS-LOW SERVICE


Massachusetts Avenue (Relay 6 in. with 8 in. at Wyman Street) Massachusetts Avenue (Renew hydrant Lake Street to Elmhurst Road) . Massachusetts Avenue (renew hydrant Winter Street to Oxford Street) Medford Street (relocate hydrant at Warren Street). .


8


63.90


....


1


324.88


5.08


6


3.00


1


92.75


...


. .


6


15.40


.. .


. .


· .. .


6


17.00


... .


....


. . . . .


. ..


.


99.30


.. .


$576.97


...


· .. ..


....


258.20


....


$1,259.04


. .


392


21.67


.


1


137.67


RENEWALS-RESERVOIR SERVICE


LOCATION


Size of Pipe in Inches


Length in Feet


Number of Hydrants


Number of Gates


Total Cost


Cost per Foot


Totals


Medford Street (Massachusetts Avenue to Lewis Avenue)


S


1,365.50


2


5


2,978.48


2.18


.


. .


1,723.00


2


11


4,814.49


Total high and low extension.


.. .


. .. .


....


... .


21,838.08


.


. . . ... .


.


....


....


26,652.57


26,652.57


Extensions of service


... .


...


...


. ..


.... .


Service installation private property.


. .. .


. . .


. .


. . .


... . . .


** General expense. .


11,950.05


... .


..... .


Credit for stock used.


5,381.86


.


* Cost per foot based on 176.50 ft .- $338.58 expended in Water Maintenance and $464.44 in Water Extension, total, $803.02.


** Includes tools and equipment, $1,311.45; miscellaneous, $4, 547.82; automobile, $49.18; Saturday afternoons, $1,809.20; vaca- tions, $2,320.74; holidays, $459.60; timekeeper, $648.53; stockkeeper. $803.53.


"S" indicates sewer in same trench.


WATER MAINS AND HYDRANTS-WRIGHT STREET


Balance, Jan. 1, 1933


$85.74


LOCATION


Size of Pipe in Inches


Length ill Feet


Number of Hydrants


Number of Gates


Total Cost


Cost per Foot


Totals


Wright Street (Heard Road to Thomas Street)


8-12


983.72


3


5


$3,914.26


$3.98


$3,914.26


.


.


... .


. .


.


. . .


Expenditure


$38,974.88


..


.


393


Appropriation Expenditure


$4,000.00


Total renewals


. .. .


.... .


Total extensions and renewals.


. .. .


·


4,032.58


1,721.54


3,914.26


394


ARLINGTON TOWN REPORT


TABLE VII.


WATER MAINTENANCE DIVISION


Appropriation for 1932


$30,531.00


Transferred from Reserve Fund


3,788.61


$34,319.61


Expenditure


34,319.61


Balance, January 1, 1933 0.00


DISTRIBUTION OF EXPENDITURES


Gross Ex-


Net Ex-


Maintenance


penditures Credits penditures


Services, care and repair .. $8,841.40


Meters, care, repair, read- ing and inspection


11,237.19


Mains, care and repair.


606.31


Hydrants and Gates, care and repair


3,193.33


Turning water off and on


53.05


Shop


510.15


Tools and Equipment.


681.60


*General Expense


4,907.16


Reservoir and Great Meadows


108.05


Renew Services, Massa-


chusetts Avenue 1.051.37


Renew Services, Beacon Street 559.40


Renew Services, Medford Street


241.99


Renew Services, Park


Street 810.22


Dudley Court, renewal.


338.58


395


REPORT OF THE BOARD OF PUBLIC WORKS


Replacing hydrants, Bea-


con Street 366.42


Replacing hydrants, Park


Street 287.94


Renew Reservoir


Main,


Massachusetts Avenue


at Central Street


525.45


Total $34,319.61


Total Maintenance Cost.


$34,319.61


*Saturday afternoons, $1,917.96; Vacations, $515.25; Holidays, $671.90; Automobile, $52.53; Miscellaneous, $1,357.43; Time and Stockkeeper, $392.09.


RECEIPTS FOR WATER CONSUMED


Year


1922


$73,830.02


1923


76,144.32


1924


84,390.12


1925


89,741.62


1926


113,656.95


1927


110,178.74


1928.


108,477.44


1929


138,158.19


1930


162,283.18


1931


158,301.98


1932


161,355.72


ARLINGTON WATER WORKS Arlington, Middlesex County, Mass.


Population by census of 1930, 36,089. Date of construction, low service, 1872; high service, 1894.


By whom owned, Town of Arlington. Source of supply, Metropolitan Water System.


396


ARLINGTON TOWN REPORT


Consumption


1. Estimated total population at date, 37,000.


2. Estimated population on lines of pipe, 35,950.


3. Estimated population supplied, 36,050.


4. Total consumption for the year, 705,208,800


gallons.


5. Percentage of consumption metered, 100 per cent.


6. Average daily consumption, 1,926,800 gallons.


7. Gallons per day to each inhabitant, 48.


8. Gallons per day to each consumer, 48.


Distribution


(Including auxiliary supply from old reservoir.)


Mains


1. Kind of pipe, cast iron and cement.


2. Sizes, from 4 inch to 16 inch.


3. Extended feet during year, 6,275.


4. £ Discontinued, 1,882.


5. Total now in use, 82.43 miles.


6. Cost of repairs per mile, $46.97.


7. Length of pipe less than 4 inches in diameter, 2,555.


8. Number of hydrants added during year (pub- lic), 18.


9. Number of hydrants (public and private) now in use, 853.


10. Number of stop gates added during year, 61.


11. Number of stop gates now in use, 1,442.


12. Average pressure on mains at center of Town, 100 high system, 60 low system.


Services


16. Kind of pipe, cement-lined, black wrought iron and lead, 3 inch to 6 inch cast-iron.


397


REPORT OF THE BOARD OF PUBLIC WORKS


17. Sizes, 1 inch to 6 inch.


21. Number of service taps added during year, 144.


22. Number of services now in use, 7,232.


25. Number of meters added, 144.


26. Number of meters abandoned, 12.


27. Number now in use, 7,232.


28. Percentage of receipts from metered water, 92.16 per cent.


29. Percentage of services metered, 100 per cent.


General Administration Expenses


Total Appropriations $15,350.50


Distribution


Salaries and Expenses


Board of Public Works


$2,000.00


Sewer Maintenance


289.50


Sanitary Division


1,930.00


Highway and Bridges


1,447.50


Water Maintenance


4,665.50


Sewer Extensions


1,930.00


Water Extensions


2,123.00


Storm Drains


... 965.00


$15,350.50


Expenditures 15,266.07


Balance, Jan. 1, 1933


$84.43


Sewer Extension Appleton Street et al.


$27,000.00


Appropriation


Expenditure 1931 (See 1931 Report) 25,840.30


Expenditure 1932 (work completed)


1,159.53


Balance, Jan. 1, 1933 $0.17


1


398


ARLINGTON TOWN REPORT


Arlmont Street Sewer, Water and Storm Drain


Appropriation $28,363.50


Expenditure 1931 (See 1931 Report) 24,622.62


Expenditure 1932 (work completed) 3,740.46


Balance, Jan. 1, 1933. ..


$0.42


1931 Street Construction


Appropriation


$49,391.74


(Carried forward from 1931)


Expenditure


41,438.77


Balance, Jan. 1, 1933. *$7,952.97


*Balance carried forward to 1933.


Massachusetts Avenue Widening


Appropriation


$687.07


Carried forward from 1931


55.48


$742.55


Expenditure


737.55


Balance, Jan. 1, 1933 $5.00


Alteration of Franklin Street at Broadway


Appropriation


$153.41


(Carried forward from 1931)


0


Balance, Jan. 1, 1933 $153.41


Alteration of Mill Street and Summer Street


Appropriation


$63.96


(Carried forward from 1931)


Expenditure


0


Balance, Jan. 1, 1933.


.. $63.96


... ....


...


Expenditure


399


REPORT OF THE BOARD OF PUBLIC WORKS


1930 Street Construction


Appropriation $571.18


(Carried forward from 1930)


Expenditure 500.00


Balance, Jan. 1, 1933 *$71.18


*Balance carried forward to 1933.


Alteration of Ways-Franklin Street and Lewis Avenue


Appropriation


$131.01


(Carried forward from 1931)


Expenditure


0


Balance, Jan. 1, 1933 $131.01


Street Construction-Old Mystic Street


Appropriation


$71.74


(Carried forward from 1931)


Expenditure


0


Balance, Jan. 1, 1933. $71.74


Street Construction-Schouler Court


$689.63


Appropriation


(Carried forward from 1931)


Expenditure 0


Balance, Jan. 1, 1933 $689.63


400


ARLINGTON TOWN REPORT


Sidewalks Summer Street Boulevard


Appropriation $1,746.99


(Carried forward from 1931)


Expenditure 0


Balance, Jan. 1, 1933 *$1,746.99 *Balance carried forward to 1933.


Alteration of Mill Street and Massachusetts Avenue


Appropriation


$234.68


(Carried forward from 1931)


Expenditure 0


Balance, Jan. 1, 1933. *$234.68


* Balance carried forward to 1933.


1931 Easement of Land


Appropriation $2,000.00


(Carried forward from 1931)


Expenditure 0


Balance, Jan. 1, 1933 $2,000.00


1929 Street Construction


Appropriation $101.35


(Carried forward from 1929)


Expenditure 62.90


Balance, Jan. 1, 1933 *$38.45 *Balance carried forward to 1933.


401


REPORT OF THE BOARD OF PUBLIC WORKS


1931 Accounts Payable


Balance carried forward $5,198.47


Payment 5,104.91


Balance, Jan. 1, 1933. $93.56


Respectfully submitted,


WALTER F. ROBINSON, EDWARD T. RYAN, RALPH ADAMS,


Board of Public Works.


REPORT OF THE JOINT BOARD OF SELECTMEN AND BOARD OF PUBLIC WORKS


To the Honorable Board of Selectmen, Arlington, Mass.


Gentlemen :


The Joint Board of Selectmen and Board of Public Works respectfully submits its twenty-ninth annual re- port for the year ending December 31, 1932.


At the Annual Town Election held March 7, 1932, Mr. Leonard Collins was elected a Selectman for a term of three years and Mr. Ralph Adams was elected a mem- ber of the Board of Public Works for a term of three years, and by virtue of such elections became members of this Board.


The Board organized with Mr. William O. Hauser, Chairman, and Mr. John A. Easton, Clerk.


The Board made the following appointments for the year ending April 1, 1933: Town Counsel, Paul M. White; Town Engineer, James M. Keane; Superintend- ent of Wires, William E. Mason.


NEW STREETS


Applications were filed with this Board by owners of property on twenty streets who desired the construc- tion of said streets. After holding the necessary hear- ings, the Board recommended the acceptance and con- struction of the following streets: Bailey Road, Brooks


402


403


REPORT OF THE BOARD OF PUBLIC WORKS


Avenue, Edmund Road, Egerton Road, Glen Avenue, Gloucester Street, Margaret Street, Melrose Street, Mil- ton Street, Peter Tufts Road, Philips Street, Quincy Street and Scituate Street.


The Finance Committee, after careful consideration, and with due regard to the existing financial depression, recommended that the Town appropriate no money for the construction of new streets in 1932, and the Town Meeting members supported the recommendations of the Finance Committee. Therefore, for the first time in a long period of years no streets were constructed.


STREET LIGHTS


The street lighting schedule has been continued through the year, and additional lights have been in- stalled on public and private ways where required.


SIGNAL SYSTEMS


The Fire Alarm and Police Signal Systems have been maintained in good working order.


New signal boxes have been installed, where needed, and existing boxes have been relocated at points where, in the judgment of the Chief of the Fire Department, they would be of the greatest service.


NEW BOARD OF SURVEY PLANS


The Board took favorable action upon the following Board of Survey plans presented for approval: Chestnut Street, Arlington Heights, Dover Place; Franklin Ave- nue, Lancaster Road, Madison Avenue, Medford Street, Peck Avenue, Pine Ridge Road, Pond Lane, Pond Ter- race, Wilbur Avenue, Wollaston Avenue, and Wright Street.


404


ARLINGTON TOWN REPORT


ITEMS OF GENERAL INTEREST


The New England Telephone and Telegraph Com- pany of Massachusetts, Edison Electric Illuminating Company of Boston and the Boston Elevated Railway Company have filed, during the course of the year, vari- ous petitions for permission to locate, relocate, and re- move poles in and from the public ways of the Town, and attach all necessary wires and fixtures thereto; also to construct conduits and manholes in Massachusetts Ave- nue, Broadway, Medford and Chestnut Streets.


Hearings have been held, when required by law, and necessary orders adopted.


The Arlington Gas Light Company was granted per- mission to install gas mains in various public ways upon petition.


BOSTON ELEVATED RAILWAY CAR SERVICE


The matter of improving the car service was taken up by the Board in conjunction with the Planning Board. The State Board of Public Works was invited to assist in making a careful survey and study of the situation, for the purpose of making a recommendation or recommen- dations which would relieve traffic congestion, provide more adequate and satisfactory car service.


This work was undertaken by Mr. Williams, one of the traffic engineers of the State Department. After several months of thoughtful study, a report was filed by him with this Board, setting forth in the order of their merit, several sites for the location of a loop to be used by the Boston Elevated Railway Company.


This report is now before the Board for further study.


405


REPORT OF THE BOARD OF PUBLIC WORKS


Medford Street has been reconstructed with rein- forced concrete from Massachusetts Avenue to Warren Street. The State, County and Town shared in the ex- pense of this improvement.


The elevated car tracks on Medford Street were re- moved and buses substituted for the electric cars.


The members of the Board take this opportunity to thank all those who have cooperated either as indi- viduals or as members of other Boards and committees, in assisting them in the work of this Board.


WILLIAM O. HAUSER, ARTHUR P. WYMAN, LEONARD COLLINS,


WALTER F. ROBINSON, EDWARD T. RYAN, RALPH ADAMS,


Joint Board of Selectmen and Board of Public Works.


REPORT OF FINANCE COMMITTEE


The Finance Committee of 1932-33 was organized with 14 members, one from each precinct, and has held frequent meetings with an average attendance of 131/2 members.


The Committee has given consideration to all Ar- ticles in the Warrants, and has transferred various amounts from the $15,000.00 reserve fund as provided in the Town By-Laws and State regulations.


The following transfers were made from the reserve fund in 1932:


Sept. 30. Collector. Expenses $298.14


Board of Health. Other Salaries- part-time clerk 36.00


Police Department. Automobile


Equipment and Maintenance.


1,000.00


Traffic Signals. Maintenance of Equipment and Traffic Lines ...... 500.00


Oct. 28.


Treasurer. Postage


100.00


Water Department. Maintenance


of Water System on Medford St. 500.00 Highway Maintenance 1,000.00


Nov. 16.


Water Maintenance


1,630.00


Water Maintenance 750.00


Removal of Ashes, Offal and Rub- bish


4,500.00


406


407


REPORT OF FINANCE COMMITTEE


Dec. 16.


Highway Division, Repair of Town


Car


100.00


Sewer Division. Maintenance. 60.00


Dec. 30. Town Hall. Other Salaries-extra service 20.00


Maintenance of Building


30.00


State and Military Aid.


28.00


Menotomy Hall. Maintenance.


50.00


Water Maintenance


500.00


Police Department. Automobile Equipment and Maintenance. 444.06


Water Maintenance


408.61


Removal of Snow and Ice.


816.23


Aged Citizens' Assistance.


1,434.06


$14,205.10


The work of the 1932-33 Finance Committee is handled by the following sub-committees :


Schools, Libraries, Health, Planning Board, Cemeteries


William J. Atwood, Chairman


Precinct 2


Arthur O. Davidson


Precinct 1


John L. Murphy


Precinct 11


Selectmen and Incidentals


Harold M. Estabrook, Chairman


Precinct 14


Daniel W. Flynn


Precinct 5


George T. Hagerman


Precinct 10


John E. Mitchell


Precinct 7


Public Works and Parks


D. Herbert Buttrick, Chairman


Precinct 8


T. Gordon Smith


Precinct 12


Francis A. O'Hearn


Precinct 3


408


ARLINGTON TOWN REPORT


Joint Board and Other Departments


Archibald C. Loveys, Chairman


Precinct 9


Edward D. Buckley


Precinct 4


Joseph C. Ohlund


Precinct 13


ERNEST W. DAVIS, Chairman HAROLD M. ESTABROOK, Vice Chairman


ARTHUR O. DAVIDSON, Secretary.


TOWN ENGINEER'S REPORT


February 3, 1933.


To the Honorable Joint Board of Selectmen and Board of Public Works, Arlington, Mass.


Gentlemen :


I respectfully submit my report as Town Engineer for the year ending December 31, 1932.


In the early part of 1932 seven employees were dropped from the force and we were able to carry on the work with the remaining members until October, when it was necessary to reemploy one man for the balance of the year.


Following is a brief summary of the work done:


· Investigated, made measurements, took pictures (made plans in some cases) and submitted reports on 22 claims filed against the Town for personal injuries and damages to property. In connection with this work 554 pictures were taken.


Street lines and grades were given on 19 public ways, and surveys made, profiles plotted and grades given for 10 sections of street reconstruction and final quantities measured and calculated.


Surveys, estimated cost and estimated betterment assessments were made on 19 streets petitioned for acceptance in 1933 and benefited area and acceptance plans were prepared on 13 streets.


409


410


ARLINGTON TOWN REPORT


Two hundred forty-one new buildings and altera- tions of existing buildings were located and plotted on block plans and sewer assessment plans and 262 water service box location cards were drawn as were 127 par- ticular sewer locations.


Plots X, Y, and Z were staked out in Mt. Pleasant Cemetery, final plans draughted and printed.


For Park Department tennis courts were staked out at Meadow Brook Park, boundary lines were set and grade stakes marked in area at end of Linwood Street, taking plan was made for passage from Summer Street to Warren A. Peirce Field, topographical survey and plan was made of area bounded by Spy Pond, Boston & Lowell Railroad, Linwood Street and Middlesex Sportsman's Association, and stakes were set for grading between High School and Boston & Lowell Railroad.




Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.