Town annual report of Andover 1910-1914, Part 38

Author: Andover (Mass.)
Publication date: 1910
Publisher: The Town
Number of Pages: 892


USA > Massachusetts > Essex County > Andover > Town annual report of Andover 1910-1914 > Part 38


Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).


Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 | Part 18 | Part 19 | Part 20 | Part 21 | Part 22 | Part 23 | Part 24 | Part 25 | Part 26 | Part 27 | Part 28 | Part 29 | Part 30 | Part 31 | Part 32 | Part 33 | Part 34 | Part 35 | Part 36 | Part 37 | Part 38 | Part 39 | Part 40


Pryce, Richard. Jezebel. Richmond, G. L. S. Mrs. Red Pepper.


*Ridge, W. P. Name of Garland.


*Ridge, W. P. Thanks to Sanderson. Rinehart, M. R. Window at the White Cat.


Runkle, Bertha. Scarlet rider.


Sedgwick, A. D. Fountain sealed. Sheehan, P. A. Miriam Lucas. Sidgwick, Ethel. Promise. Sidgwick, Ethel. Succession. .


Silberrad. U. L. Keren of Lowbole.


Spearman, F. H. Mountain divide.


Stevenson, B. E. Gloved hand.


Stockton, F. R. Kate Bonnet. Straus, Ralph. Prison without a wall. Terrell, D. à B. Sister-in-chief. Tompkins, J. W. Ever after.


*Vachell, H. A. Blinds down.


Vaizey, Mrs. J. B. An unknown lover.


Van Slyke, L. B. Eve's other children.


Walpole, Hugh. Fortitude.


Watts, M. S. Nathan Burke. Watts, M. S. Van Cleve.


Webster, Jean. Daddy-long-legs.


Webster, Jean. When Patty went to college.


Wharton, Edith. Custom of the country.


White, S. E. Gold. Whitechurch, V. L. Left in charge.


Wiggin, K. D. Story of Waitstill Baxter.


Woolley, E. M. Cub reporter. Wylie, I. A. R. The native born.


CHILDREN'S BOOKS-NON-FICTION.


973 A129 Abbot, W. J. Story of our navy for young Ameri- cans. Allen, N. B. Industrial studies.


600 A42 917.1 B36 Bealby, J. T. Canada. 973 B57C Blaisdell & Ball. Child's book of American history.


128


REPORT OF BOARD OF PUBLIC WORKS


To the Citizens of the Town of Andover:


Your Board of Public Works submit their first annual report, (actual service from May 5, 1913) including the continuance of the old Board of Public Works in this year, the twenty-fifth of the Water System, and the seventeenth of the Sewer System, for the year ending January 12, 1914.


INSTITUTION


The present Board of Public Works was created by the accept- ance, March 3, 1913, of the provisions of Chapter 345 of the Acts and Resolves of 1912; but on account of an error in the method of acceptance, caused by the mis-interpretation of Section 4 of Chapter 345, the acceptance was in doubt. A special Act of Legislature was required to legalize and ratify the acceptance of Chapter 345 of 1912, on March 3, 1913, and to authorize the Town to call a special town meeting for the election of officers for the new Board of Public Works. This Act, also, ratified the acts of all the officers of the departments involved. This Act passed April 15, 1913, and is known as Chapter 493, of the · Acts and Resolves of 1913. The officers of the new Board of Public Works were elected May 3, ,1913, and immediately en- tered on their duties. The election resulted as follows: Lewis T. Hardy, Barnett Rogers for three years; Andrew McTernen, Willis B. Hodgkins for two years; and Thomas E. Rhodes for one year.


ORGANIZATION


The first meeting of the new Board of Public Works was held Monday, May 5, 1913. The organization of the Board was


5


as follows: Chairman, Lewis T. Hardy; Secretary, Thomas E. Rhodes; Treasurer, Willis B. Hodgkins.


WATER AND SEWER DEPARTMENTS


Your Board found the Water and Sewer Departments in excellent condition. These departments were well organized and working efficiently. These departments possessed a complete record of the business of the past, a good accounting system, a knowledge of their equipment and capacity, and always ready for action. The resignation of Mr. F. L. Cole is to be regretted, as we believe that he has been a capable and efficient Superin- tendent and an economical executive of these departments ..


THE WATER DEPARTMENT


For a detailed account of the Water Department see the report of the Superintendent of Water and Sewers. The failure of the Town to authorize the Board of Public Works to sell $10,000.00 worth of water bonds, restricted the amount of water- main extensions. Two petitions for water-main extensions were necessarily refused, viz: the extension on Woburn Street and the other on Bellevue Road.


THE REMOVAL OF THE HIGH PRESSURE PUMPING PLANT


There has been a request to your Board for the removal of the high pressure pumping plant on Bancroft Street to some place that will eliminate the nuisance to the neighborhood. The Board has considered the matter with those interested and are of the opinion that something should be done. The development of this part of the town seems to depend on the removal of this nuisance, and recommend it for your consideration.


THE WATER BONDED DEBT


The bonded debt of the Water System is now $184,000.00, of which amount $50,000.00 is redeemable by sinking funds which amount to $28,083.63. The balance of the bonded debt is paid by annual appropriations by the Town. An appropriation of $750.00 is asked for the sinking funds account.


6


WATER SYSTEM COSTS AND REVENUE


Our present mileage of water mains is 47.70 miles, a gain of .71 miles for the year 1913. With this increase of mileage of water mains there follows an increase of revenue, net mainten- ance, cost of pumping, gallons pumped, number of service-pipes in use, number of meters in use, number of hydrants, and a decrease, in the unit cost per million gallons, with a greater increase of the unit revenue per million gallons. See the Com- parative Table.


The unit cost per million gallons in 1912 was $57.06, the unit revenue per million gallons was $95.99, leaving a profit per million gallons of $38.93. In 1913, the unit cost per million gallons was $56.42, the unit revenue per million gallons was $99.58, leaving a unit profit per million gallons of $43.16, or an increase of profit per million gallons of $4.23.


This is not to be considered as indicating a permanent gain, for if one will examine the Comparative Table he will find more or less fluctuation along these lines. But our increased cost in the item of pumping per million gallons is caused, at least in part, by the fact that the water department, in order to comply with the labor laws of the State; was forced to engage another engineer at the pumping station. This will, of course, affect the cost of pumping in the future.


THE SEWER DEPARTMENT


THE ABBOTT AND MARLAND VILLAGE SEWER PROPOSITION


In accordance with a vote of the Town to recommit the Abbott Village and Marland Village sewer proposition to the old Board of Public Works and report at the next town meeting, the same has been considered. We find that the old Board did go on record March 13, 1913, at their meeting of that date, as recom- mending the adoption and construction of the sewer system according to the plan of McClintock and Woodfall.


Your present Board have not received any petition nor been approached by the parties interested. It is the opinion of the


7


Board, as there has been no demand for it, that the demand should be urgent and necessary to a large part of the community, or that the Board of Health should recommend its construction for the public health, before the proposition should receive serious consideration by the Town. We recommend the dis- missal of the whole proposition.


THE SEWER BONDED DEBT


At the beginning of the year 1913, the bonded debt was $53,000.00 ; $20,000.00 in bonds matured in July, 1913, leaving the bonded debt now $33,000.00. The Sinking Fund is $11,153.85, leaving a net bonded debt of $21,845.15. In 1919, there will mature $3,000.00 of these bonds, and in 1928, the balance of $30,000.00, and an appropriation of $1,000.00 is asked for to be applied to this account.


SEWER EXTENSIONS


The only sewer-main extension this year was a short length on Chestnut Street. There was one applicant for sewer exten- sion on Avon Street, but as the Town had not voted to extend a sewer main on Avon Street, your Board deemed it wise to wait for your authority.


The Board believe that some authority should be given them to extend sewer mains where demanded if practical, and some criterion should be established whereby sewer mains may be extended along streets where only a part of the abutters desire it. It puts the Board in a peculiar position when they have to judge whether or not to extend sewer mains where there is a conflict of interests and no unanimity of demand. The question naturally arises, how many of the abutters should be considered as a sufficient warrant to extend sewer mains along any street. Or should the question be judged by the financial interests on the street? There may be many abutters on a street whose collective expense or tax for the extension of the sewer may be much less than a single abutter who has no use for it. These are questions that the Town should determine and make some rule to govern such cases. This is the opportune time to con-


8


sider this question, for sewer extensions will be constantly de- manded as building increases.


THE HIGHWAY DEPARTMENT


Your Board found the Highway Department in a state of dis- organization. A department without a home, without records, without a system of bookkeeping, and without an inventory of equipment. Its integrity as a specific department was apparent and not real. This department was practically without small tools such as shovels, picks, rakes, etc., and the machinery was mostly located on private property and most of it in a state of needed repairs.


The Board's first consideration was to secure a temporary superintendent of streets, and Daniel Webster was appointed. A system of bookkeeping similar to the Water and Sewer Depart- ment was adopted. After considering several applicants for superintendent of streets, the Board finally engaged Mr. G. W. Wood.


The inadequate facilities for sheltering the highway depart- ment's equipment was, in the opinion of the Board, urgent and a necessary step towards economy and efficiency. A building was erected for that purpose on the land adjacent to the building of the water and sewer departments below Lewis Street.


With the housing of the highway department's equipment, with a good system of bookkeeping, and a probable adoption of a method of collecting and recording data of the nature of work done, where done, when it is done, and costs data, the Board has taken the initial step towards organization, economy, and efficiency. Time, the great factor in the measurement of results, will be required to prove the workableness of the reorganization of the highway department.


HIGHWAY CONDITION


Our highways are in a deplorable condition ; in a state of slow starvation. Many portions are water-logged because of poor drainage, and many more are mere water-ways in stormy


9


weather. There are unmistakable evidences that our yearly ap- propriations have been insufficient to replace wear and tear for many years, and a gradual deterioration has been the result. Our parsimony has borne fruit. Radical methods are now neces- sary to bring the roads to a condition required by present traffic. It would require an appropriation of $50,000.00 per year for a period of five years to bring them to the present demand of travel. But this method would be too burdensome and unwise. Why not build our roads as we build our water and sewer system ?- Issue highway bonds and put the work out to contractors. This would be less burdensome and would be more equable. But here we are against the fact that highway bonds can be issued only for ten-year periods, which practically means a "pay as you go " policy. This gives us but little relief, increased appropria- tion is inevitable if good roads are demanded. But good roads are more economical than poor ones; a macadam road is more economical than gravel; oiled gravel more than unoiled gravel. Good roads should be the slogan. We recommend an impartial and unprejudiced consideration of this whole problem at the coming town meeting.


WORK ON THE HIGHWAYS


The work on the highways has been extensive, reaching from the North Andover line on Tucker Street, Highland Road, Elm, Haverhill Street, from the Lawrence line on Union Street, Corbett Street, and the River Road to the Tewksbury line. Under the charge of J. Wagner nearly all streets (44) east of Lincoln Street, Bannister Road, and Woburn Street received some re- pairs, besides the general jobbing, non-street work, and moving the crusher. Under the charge of John A. Haggerty all streets within the Ballard Vale fire limit were cared for. Mr. Joseph Bourdelais had charge of all repairs in the western part of the town to the River Road and to the Tewksbury line. The town has I21 streets containing 175 miles of roadway; it is no ex- aggeration to say that 85 per cent of these streets have received some kind of repairs. This does not mean 85 per cent of the mileage, of course. The character of the repairs has of neces-


IO


sity been surface work; no real constructive repairs could be made without sacrificing much necessary surface repairs. What the town needs is constructive repairing, the elimination of the causes that are destructive to our highways. For years the storms have worked destruction in the same places; the same process of repairs goes on every year. These places should be made storm proof.


THE MAPLE AVENUE PROBLEM


In the year of 1912, a Mr. Samuel Walker built a house oppo- site the culvert on Maple Avenue and caused the water-way to be dammed and turned the water on the roadway, causing much damage. This, also, was a material cause of the washout on Harding Street June 20, and again on August 27. Although this condition was known before last town meeting, nothing was done to provide means for the remedy. Your Board was in- formed of this condition soon after their duties began, and were informed that there was no redress for the Town. Your Board decided to remedy the condition, although the money was much needed on the highways, by carrying the water from the culvert on Maple Avenue under the street in a 15-inch pipe to a point on High Street at the culvert near the residence of Mrs. Katherine McNally. This dra n is connected with eleven catch-basins and manholes. The work began July 28, and was completed Septem- ber 16. The approximate costs, including washout repairs, was $2500.00 This drain, with further extensions on Walnut Avenue, Maple Avenue, and High Street, and eight more catch- basins added, would complete the surface drainage of these streets, and with paved gutters make washouts almost impossible. The Boston and Maine Railroad Company have built two catch- basins and laid large pipes to the brook, thus providing for the drainage above the bridge on Harding Street. If Harding Street was furnished with curbstones and the roadway macadamed from curbing to curbing, washouts on Harding Street would be almost impossible. This would be the most economical solution of this old problem.


II


WHY THE HIGHWAY DEPARTMENT HAS A BALANCE OF $1073.70


It is the opinion of the Board that some means should be adopted whereby the Board may have the knowledge of all money available for the Highway Department in season to complete all repairs within the revenue. It was the belief of the Board, from the authority of the Selectmen, that the funds available for high- ways were nearly exhausted early in November, which caused a curtailment in highway work. Had the Board the knowledge that this amount, $1073.70, was available, they would have been able to complete the work contemplated, viz: the macadamizing of Brook Street, Harding Street above the railroad bridge, and the building of two catch-basins, much needed, on Park Street. If this condition exists every year and the balance is not avail- able for the following year, it follows that such revenue is use- less to the Highway Department and cannot be considered as a highway revenue, although intended for the Highway Department.


DUST LAYING


It is the opinion of the Board that the most efficient and economical method of laying the dust on our streets is with oil. But it would be poor policy to oil worn-out streets. The streets to be oiled should first be put in good condition and shape, for the oil would preserve the street as well as lay the dust. The first and second years would require two coats of oil, but after that one coat would, no doubt, do. The following extract, taken from the Massachusetts Highway Commission's Report for 1912, is self-explanatory and verifies our belief in the efficiency and economy of oil :


AVERAGE DAILY TRAFFIC


Light teams


Heavy teams one horse


Heavy teams, two or more horses


Automobiles a day


A good gravel road will wear reasonably well and be economical with Needs to be oiled with Oiled gravel fairly good either hot or cold oil I-2 gallon coating (cold oil must be used yearly)


50 to 75


25 to 30


Io to 12


100 to 150 over 150


75 to 100


30 to 50


20


500 to 700


12


The cost of laying dust on our streets exceeds the revenue by $1115.87, or 100 per cent. The assessment for dust-laying must, therefore, be doubled if it is to be borne by those receiving the benefit.


COMPARATIVE TABLE OF EXPENDITURE AND REVENUE FOR 1912 AND 1913


1912


1913, May 1


Items


Revenue


Expenditure


Revenue


Expenditure


Highways and Bridges


$4000 00


$7136 57


$8265 25


$14127 85


Drains


2235 36


Sale of stone


158 60


Street sprinkling


I198 88


1151 42


984 44


Oil for streets


I282 85


Railroad Taxes


4155 23


4659 56


Macadam.


3000 00


4753 96


2954 69


1417 82


Andover Street


3000 00


2992 26


Salem Street


2000 00


1999 76


Elm Square


597 57


608 09


Horses and Drivers


2295 00


2295 00


2790 55


Salary


I200 00


I200 00


850 00


Miscellaneous


450 00


Sidewalks


1500 00


1649 65


2000 00


1507 04


Oil wagon, etc.


1500 00


1409 30


Snow


1000 00


781 24


455 25


420 59


Sidewalk revenue


143 65


Balances


$24248 93 $23416 53 $25077 27 832 40


$23385 25


1692 02


LOWELL STREET CONDITION


The reconstruction of Lowell Street is absolutely necessary, but it is beyond the means of the town to do it thoroughly. Your Board has caused repairs to be made on a large part of the street to the value of about $1000.00, but this is insufficient to make any noticeable result. From Main to Lincoln Street the highway has been resurfaced and well drained. Two new catch-basins were built and all culverts made workable, and one new culvert built.


Your Board is of the opinion that the State should take over this street as a state highway, and some influence should be brought to bear on the Highway Commission to take possession of it.


13


COLLECTING AND RECORDING MAINTENANCE DATA BY STREETS


The idea of collecting and recording data of work done by streets each day, has been independently carried out by the secretary of the Board on his own responsibility and expense. Its practicability and value, in the opinion of the secretary, is unquestionable, and but little time is required in collecting and recording the data of each day's work. It gives an intelligent survey of the work done each day, and the deductions that can be drawn are many.


The collection of cost data in the actual process of construction is a necessary factor in measuring economy and efficiency. " Comparison of unit cost is the only criterion by which to judge the economic merit of a structure, a machine, or a method of doing work." The data is a record of the past work and costs from which to measure the life of repairs on the highways, and will aid the Board in making estimates for the budget. A sum- mary of the year's work, as given in the table below, gives the taxpayer an intelligent idea how, for what, and where his money is spent.


The method of collecting and recording the data is shown in the forms below. The first is the daily collecting sheet, the second the recording sheet for loose-leaf binder :


Date Sept. 3.


ELM .


Name of Street


Repairs


GRAVEL MAC. PAV.


*


Length 420


Amt Material 24, Stone


New Roads


GRAVEL MAC. PAV.


Water


Sidewalks


GRANOLITHIC CONCRETE GRAVEL


Oiling 1200 Gals.


Bridges


No. Men 8


Gutters


Total Hrs. 86


Walls


No. Teams


Fences


Total Hrs. 38


Culverts


Catch Basins


Roller Hrs. 9


Remarks :


*Tarvia binder on #2 stone.


I4


ANDOVER PUBLIC WORKS-ROAD DEPARTMENT


ELM.


Name of Street


REPAIRS


NEW ROADS


GUTTERS


WALLS


FENCES


BRIDGES


GRAVEL


CON.


GRAN


CATCH BASIN8


GRAVEL


MAC.


PAV.


GRAVEL


MAC.


PAV.


*


DATE


LENGTH


AM'T MATERIAL


WATER OILING


NO. MEN


TOTAL HRS.


NO. TEAMS


TOTAL HRS.


ROLLER HRS.


$


C


REMARKS


/


Sept. 3


420f


24 S


1200g


8


86


4


38


9


217


69


Tarvia binder on #2 stone


.


SIDEWALKS


CULVERTS


SUMMARY TABLE OF MAINTENANCE BY STREETS


Abbot


Sept.


Gravel


Cleaning gutters


$ 15 96


Andover


July


Macadam


Putting Tarvia blanket on


211 60


Argilla


July


Gravel


Scraping and filling


24 00


Avon


Sept.


Macadam


Scraping and taking off waste


29 68


Bancroft


Nov.


Gravel


Repairing culvert


19 12


Bartlet


Nov.


Macadam


Cleaning and repairing culvert


39 46


Brook


Sept.


Gravel


Repairing washout


8 84


Central


Oct.


Gravel


Scraping and cleaning gutters


53 19


Chestnut


Sept.


Gravel


Scraping and repairing sidewalks


159 12


Corbett


Aug.


Gravel


Scraping and raking stones


50 00


Cuba


Aug.


Gravel


Changing grade, excavating bould- ers


Elm


Aug.


Macadam


297 07 Resurfacing, blanket, patching, side- walks


2154 02


Essex


Oct.


Macadam


Cleaning gutters and patching


49 40


Harding


Aug.


Gravel


Repairing washout


60 08


Haverhill


Oct.


Gravel


Patching


45 04


Highland


Sept.


Gravel


Scraping and taking off waste


108 50


High'


Sept.


Gravel


Patching, cleaning, repairing gut-


ters 45 40


Holt


Oct.


Gravel


Patching


6 42


Locke


Nov.


Macadam


Cleaning


3 80


Lowell


July


Gravel


Resurfacing culverts, catch-basins


878 72


Main


June


Macadam


Resurfacing, patching, blanket, cleaning


1620 45


Morton


Sept.


Gravel


Scraping and cleaning


70 90


Orchard


Dec.


Gravel


Taking out stones


2 20


Park


Oct.


Macadam


Cleaning out gutters


19 14


Pearson


Oct.


Gravel


Cleaning and repairing gutters


14 04


Phillips


Aug.


Gravel


Washout, repairing gutters, clean- ing


36 16


Porter


Sept.


Gravel


Washout, scraping and patching


70 24


Poor


Aug.


Gravel


Scraping and raking off stones


43 28


Punchard


Oct.


Macadam


Draining


5 12


Red Spring


Sept.


Gravel


Cleaning out gutters


I 88


Salem


Nov.


Macadam


Cleaning


33 18


School


Nov.


Macadam


Cleaning gutters and culverts


27 62


Shawsheen


Sept.


Gravel


Repairing gutters


8 12


Stevens


Dec.


Gravel


Cleaning out gutters


14 28


Summer


Sept.


Gravel


Scraping, cleaning, sidewalks, fence


Tucker


Sept.


Gravel


Repairing washout and patching


100 30


Union


Oct.


Macadam


Resurfacing


897 00


Wolcott


Dec.


Gravel


Sidewalks


12 24


Walnut


Aug.


Gravel


Washout, paving gutters, sidewalks


498 61


Washington


Oct.


Gravel


Scraping and taking off waste


52 60


Whittier


Oct.


Gravel


Cleaning, repairing sidewalks


3 54


Florence


Dec.


Gravel


Cleaning, repairing sidewalks


12 84


Burnham


Dec.


Gravel


Cleaning


4 20


Jobbing


Aug.


Cleaning catch-basins, and general work


167 23


Crusher


Nov.


Moving


32 80


Non-street work


I21 06


Total


$8242 23


16


The dates in summary indicate when recording commenced or work began. The data is necessarily incomplete and was done as an experiment before presenting to the Board for considera- tion. It covers only part of the work done under the foreman, Mr. J. Wagner, and is only approximately correct. By carefully collecting and recording data, accuracy may be reached, and by adding from time to time features that will suggest themselves to the department, valuable records of our highways will result.


SIDEWALKS


Our sidewalks are in a deplorable condition, especially those we call gravel, which are but mud walks in the spring of the year, or in the frequent periods in winter when the frost tem- porarily leaves the ground.


Your Board is of the opinion that the most economical walk, when measured in the life of the walk, is the granolithic. Al- though the first expense is much greater, the long life of the granolithic more than compensates the difference in costs. But as extensive construction of this kind of walk seems impossible at present, we believe that a coating of cinders put on our present gravel walks would make a great improvement.


ELM SQUARE IMPROVEMENT


Because of some demand for the improvement of Elm Square, your Board has caused surveys to be made, plans drawn, esti- mates of cost made, and present them, by an article in the War- rant, for your consideration. Although your Board has not taken action as to their attitude on the proposition, they do agree that the Town should have the opporunity to consider and dis- cuss the question and determine if the time is opportune for the improvement.


THE PARK DEPARTMENT


Your Board found this department, as in the Highway De- partment, without records, account books, or schedule of its tools. Accounts were opened and are kept in the Board of Public Works, as in all the other departments under their charge.


17


The upkeep of the Park for the past year has been up to past standards. But little improvement has been done to the Park this year. Your Board purchased twelve seats, which were much needed and were well patronized. Your Board caused to be rebuilt thirty feet of the brook wall, which caused the removal of several trees that were in the way. The culvert on Whittier Street was made wider at this point, and therefore eliminated a dangerous condition.


Your Board investigated the proposition of reconstructing the pond as was voted at the last town meeting. After a survey had been made and the problem thoroughly considered the conclusion was that the appropriation was insufficient to do the work in a satisfactory manner. But the Board have caused a plan to be made, and submit it for your consideration and have estimated the cost ($1200.00) for its construction.




Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.