We are most appreciative of the courtesy and cooperation received from the Police Department, Fire Department, Board of Selectmen, School Department, Town Counsel, Town Accountant and other town officials during the past year. The Board is grateful also for the patience and understanding of the general public who experienced some inconvenience during the construction periods of this past year.


In preparing the budget for 1962, the Board of Public Works has been cognizant of the burden that budgetry requirements place upon the taxpayer and we believe that the following report merits your care- ful and deliberate consideration.


To: Hon. Board of Public Works


From: Director of Public Works, Arthur J. Bilodeau


Subject: Fourth Annual Report


REPORT FOR 1961


I. Master Highway Program 1961


A. Broad St., Spring St. to Broad St. Pl. 3,000'


B. Commercial St., Railroad to Railroad 1,600


C. Spring St., (Level and Resurface) 900


5,500'


The original construction plan for 1961 included a section of Com- mercial St. from Unicorn Ave. to Madison St. This would have avoided the double detour in one section of town; however, the sewer installa- tion in the vicinity of Putnam St. to Madison St. involved a cut of 22 feet through solid ledge.


Broad and Spring St .- Contractor Walter Reed Cor- poration - Cost $115,000.00


Commercial St. - Contractor E. T. Dwyer Company-


Cost $110,000.00 (Chapter 90)


238


II. Master Drainage Program 1961


A. Phillips Creek Part II


Pearl St. to and including North St. Contractor-DiMascio Bros .- Cost $33,000.00


B. Phillips Creek Part III


North St. to Rinaldo to Shaw to Neck St.


Contractor-DiMascio Bros .- Cost $45,000.00 Contract 50% complete.


Part III of Phillips Creek will complete all master drainage in the watershed from Fore River to Back River in the Phillips Creek Valley.


C. Back River Flood Control Project


The Town in 4 years has appropriated $440,000.00 making a total of $880,000.00 with State Participation.


At this writing a contract for the first phase is ready for bid. This work will include channel work at the Wool Scour- ing Plant, a new bridge, additional twin 120" culverts under railroad, channel to Broad St. and stilling basin at Broad St. This project estimates at approximately $400,000.00. The second phase is 75% designed and should be bid in the year 1962. This project has been delayed during 1961 be- cause of the workload within the Division of Waterways State Department of Public Works.


III. Shore Protection and Beach Facilities


A. In 1961 the Town took six cottages along River St., five of which have been demolished and cleaned up. This is in preparation for future Beach facilities.


B. The Wessagusset Beach Parking Lot was extended, utilizing approximately 30,000 yards of material on the site. This material should set and compact for at least one year. Cost $ 5,000.00


C. Marina - The mooring basin scheduled under Phase I of the Marina development was dredged and the material pumped into the saltmarsh for future parking facility. Contractor-Ercon Construction Corporation Cost $11,000.00


D. Beach Road Seawall 25% Complete - Contractor - John Cashman


Cost $ 5,000.00


IV. Master Sewer Program - 1961


A. Federal Aid North Weymouth Pumping Station and Force Mains.


1. Force Main and Outfalls-Complete Contractor-Power Construction - Cost $160,000.00


2. Pumping Stations - 50% Complete Contractor-Ralph Civitarese - Cost $160,000.00


239


B. Contract 42 - Sewers in Various Sections of Town . Contractor-DiMascio Bros. Cost $125,000.00


C. Contract 43 50% Complete Sewers in Various Sections of Town Contractor-D'Amico & Sons Cost $148,000.00


V. Master Water Program


A. Reinforcing and Miscellaneous Piping


1. Weymouth Trucking Corporation


960'


2. Mulcahy Bros. 4,613'


3. E. T. Dwyer Company 2,300'


4. Water Division 1,140


Total 9,013'


VI. Sidewalk Program - 1961


A. New Construction


1. Fogg Road


2. Essex Street


3. Prospect Street


B. Repair Construction


1. Jackson Square at new Post Office


2. Jackson Square (Concrete)


3. North St.


4. Bridge St. (3000')


5. Pratt School


6. Pearl St. (Bicknell Sq. end)


DIVISIONAL BUDGETS AND CAPITAL OUTLAY ARTICLES


1961 - PROPOSED - 1962


VII. Budgets - Divisional 1961-1962


A. Public Works Office


1961


Proposed 1962


1. Personnel


$32,795.00


$43,040.80


2. Operation Expenses


2,100.00


2,500.00


3. Gasoline & Diesel Oil


10,200.00


12,500.00


4. Miscellaneous Expenses


100.00


100.00


5. Commissioners' Expenses


350.00


525.00


6. Sundries


800.00


800.00


7. Building Maintenance


15,000.00


16,650.00


8. Out of State


600.00


600.00


Totol


$61,945.00


$76,715.80


B. Engineering Division


1. Personnel


$78,721.00


$86,074.40


2. Consulting Fee


3. Supplies-(Field & Of.)


3,500.00


3,500.00


4. Assessors' Plans


1,500.00


1,500.00


5. Misc. Operation & Exp.


2,800.00


2,600.00


240


6. Zoning Map Printing


7. Atlas Printing 1958 =$2100


3,000.00


$86,521.00


$96,674.40


C. Park Division


1. Personnel


$38,443.00


$40,881.80


2. General Maintenance


4,400.00


3,750.00


3. Building Maintenance


1,500.00


1,500.00


4. Equipment Maintenance


1,500.00


5. Miscellaneous


(Sand)


*3,725.87


3,500.00


$48,068.87


$51,181.80


* Transfer for sanding Wessagusset Beach


D. Highway Division


1. Personnel


$308,804.00


$320,337.60


2. General


6,500.00


6,500.00


3. Maintenance


14,500.00


18,000.00


Street Oiling


25,000.00


25,000.00


5. Snow Removal


30,000.00


35,000.00


6. Drainage & C. B. Constr.


10,000.00


10,000.00


7. Supplies & Mat. - Tires, Welding, Iron, Storm Gear, etc.


6,000.00


6,750.00


8. Misc. Sundries


9. Traffic


6,500.00


7,000.00


Total


$407,304.00


$428,587.60


E. Tree Division


.1 Personnel


$43,553.00


$45,028.80


2. Tree Planting


4,000.00


4,000.00


3. Miscellaneous


6,600.00


6,800.00


4. Out of State


See D.P.W.


Total


$54,153.00


$55,828.80


F. Water Division


1. Personnel


$205,012.00


$213,986.00


2. Office & Bldg. Expense


34,865.00


31,000.00


3. Water Works Supplies


59,000.00


60,500.00


4. Maintenance


42,400.00


43,700.00


5. Bonds


73,600.00


85,712.00


6. Construction


45,000.00


45,000.00


7. Out of State


150.00


150.00


Total


$460,027.00


$480,048.00


G. Sewer Division M. & O.


1. (510) Salaries Adim.


$ 7,271.00


$ 7,590.00


2. (520) Salaries Engrs.


3. (530) Labor-Equip. Maint.


5,100.00


5,504.00


241


4. (540) Labor-Maint. Sewer


System


26,970.00


27,000.00 7,200.00


5. (550) Holidays, etc.


6,200.00


6. (600) Mileage


200.00


100.00


7. (710) Equip .- Engrs.


8. (720) Equip, Const. Maint. and Trans.


1,400.00


1,400.00


9. (800) Supplies-Office


700.'00


2,260.00


10. (810) Supplies-Engr.


11. (820) Supplies-Dept. Equipment


6,700.00


7,000.00


Sewer System


3,200.00


4,600.00


13. (730) New Equipment


......


Totol


$57,741.00


$62,654.00


H. Equipment


A. Public Works Office


$ 1,489.00


$ 6,850.00


B. Engineering Division


3,300.00


450.00


C. Park Division


6,050.00


D. Highway Division


53,150.00


52,700.00


E. Tree Division


600.00


800.00


F. Water Division


11,000.00


16,300.00


G. Sewer Division


4,225.00


Total


$ 69,539.00


$ 87,375.00


Grand Total-Article 1


$1,245,298.87


$1,339,065.40


VIII. Capital Outlay Articles 1961-1962


Appropriation 1961


Request 1962


1. Private Ways


$ 37,168.00


$


46,610.00


2. Highways-Chapter 90


96,000.00


96,000.00


3. Highways-Master


250,000.00


250,000.00


4. Sidewalks


40,000.00


40,000.00


5. Particular Sewers


125,300.00


120,000.00


6. Common Sewer


348,500.00


443,900.00


7.


Mountain View Road


None


18,500.00


8. Dutch Elm


10,000.00


None


9. Master Drainage-Chapter 91


110,000.00


60,000.00


10. Master Drainage


90,000.00


75,000.00


11. Smelt Brook


15,000.00


None


12. Ft. Point & Driftway Seawall


None


None


13. Regatta Rd. Seawall


10,000.00


None


14. River St. Seawall


None


10,000.00


15. Sewer Easement


None


None


16. Libby Industrial Parkway


None


None


17. P. W. Garage Jurisdiction


None


None


18. Ledge Hill Rd. & Commercial St.


None


None


19. Shore & Marina Protection


None


10,000.00


20. Park Construction Item


16,364.00


14,030.00


242


12. (830) Supplies-Maint.


21. Incinerator Article


22. Chlorinator Facility


23. Taking of Tide Flats


None


12,500.00 None


Others


Construction of Oak Cliff Rd.


6,800.00


None


Grading of Parking Lot


5,000.00


None


Wells - Water Division


40,000.00


None


Water Mains-Water Division


100,000.00


None


Dredging Yacht Basin


15,000.00


None


$1,315,132.00


$1,206,040.00


IX Summary - Financial Analysis 1961-1962


Appropriation 1961


Propose 1962 $1,339,065.40 1,206,040.00


Total


$2,560,430.87


$2,545,105.40


1. Increase in Budgets


$93,766.53


7.4%


2. Decrease in Capital Outlay


109,092.00


9.0%


3. Net decrease Total


15,325.47


.58%


Note: For accounting purposes all personnel figures are predicted on a 53 week year for 1962. The total of this differential is $13,291.20.


X. Proposed Sewer Program-1962


Particular


Common


Other


A. Commercial St .- Short section to be constructed during road build- ing-State (From vic. Church & Jaffrey to North).


$ 1,000


$ 4,000


B. Winter St. New cut-off to Middle St. and portion of Middle St. to Hanover (To be constructed dur- ing road bldg.)


7,000


67,000


Madison St. to Jackson Square


5,000


30,000


D. Middle St .- From Lake and Essex St. to Washington St.


7,000


55,000


E. Maintenance & Operation-Approx. Account 510 - 830


F. Account 400 - 430


G. Account 440, 500


78,000


H. South Weymouth


Trunk-Ex-


pansion


10,500


43,500


I. North Weymouth Pumping Area


20,000


120,000


J. Town Hall-High School Chard to Middle


8,000


45,000


K. North Weymouth - Critical-


13,000


36,000


L. Off Pond St. - Hilldale, Lake- wood and Pine Circle


9,500


23,400


$159,000


$446,900


$ 63,000 $668,900


Total


243


None None


9,500.00


Budgets Divisional


$1,245,298.87


Capital Outlay


1,315,132.00


C. Commercial St. Vicinity of


$ 63,000 23,000


North, Sea, Pearl and others


Particular Sewer Funds to carry from 1961 modifies figures


$120,000 $443,900 $ 62,65-


XI. Proposed Highway Program-1962


Chapter 90


Master Highway


Total $626,554


Total


1. Commercial St. Church to North


$96,000


$ 96,000


2. Commercial St. Unicorn to Madison


$195,000


195,000


3. Winter St.


Main St. to Middle & Washington


200,000


200,000


4. Commercial St, Madison to Jackson Sq. 96,000


96,000


$587,000


Commercial St .- Church to North St. is in the design stage with the State at the present time. The monies ($96,000) were appropriated in 1961 and are held earmarked for this project.


Commercial St .- Madison to Jackson Sq. will have sewer installed under the 1962 Sewer Program. The $96,000 requested this year (Chap- ter 90) will authorize State design in 1962 for 1963 construction.


Commercial St .- Unicorn to Madison is in design at present time --- to be let out for bid early spring. Completion of this project will be scheduled to coincide with the occupancy of the new High School.


Winter Street is in preliminary design at the present time. This work should be planned to tie in with the new construction underway on State Route 18 (Main St.)


Following is an up-to-date chart of the status of the Master High- way Program including the latest traffic counts of various streets.


244


DEPARTMENT OF PUBLIC WORKS - TOWN OF WEYMOUTH MASTER HIGHWAY PROGRAM


Location


Traffic Counts 24 hrs. Date


To Date


Prop. 1962 Future Total


Remarks


1. Academy Ave.


Broad St. to Sutton St.


1393


1961


1550


100% Sewered


Sutton St. to Middle St.


1725


1961


1500


No Sewer


3050


2. Broad St.


Front St. to Foye Ave.


5626


1958


2450


100% Sewered


Foye Ave. to Spring St.


5869


1961


2000


100% Sewered


Spring St. to Broad St. Pl.


4020


1961


2700


100% Sewered


245


Broad St. to Jackson Sq.


6589


1961


5600


15% Sewered (At Jackson son Sq.)


12750


3. Church St.


Commercial to North St.


3521


1961


1350


10% Sewered


1350


4. Columbian St.


Route 128 to Main St.


4098 1961


2100


No Sewer


Main St. to Columbian Sq.


6705


1961


1500


100% Sewered


3600


5. Commercial St.


Washington St. to R.R.


900


100% Sewered (Repaved 1955)


R. R. to R. R.


7676


1960


1400


100% Sewered


R. R. to Church St. (Webb)


6008


1961


4400


100% Sewered


Construction Schedule


246


Washington St. to Summer St.


5538


1961 2000


100% Sewered


Summer St. to Kingman St.


1000


100% Sewered


Kingman St. to Winter St.


2576


1961


5200


No Sewer


Winter St. to West St.


. 1865


1961


4100


No Sewer


12300


8. Green St.


North St. to Sunrise Drive


3139


1961


3600


100% Sewered


Sunrise Drive to Shaw St.


2855


1961


2000


100% Sewered


Shaw St. to Bridge St.


1000


100% Sewered (Class B. Construction.


6600


9. Middle St.


Commercial St. to Central Sq.


6245


1961


2900


No Sewer


Central Sq. to Lake St.


6397


1961


3400


No Sewer


To . Date


Prop.


1962. Future Total


Remarks


Church St. to .North St.


1325


1961


1300


Sewer to be installed with construction.


North St. to Unicorn


4999


1961


2500


No Sewer


Unicorn Ave. to Madison St.


4935


1961


2900


100% Sewered - New High School


Madison St. to Broad St.


6277


1961


1300


Sewer 1962


14700


6. Evans St.


Bridge St. to Pearl St.


6027


1961 3300


100% Sewered


3300


7. Front St.


Location


Traffic Counts 24 hrs. Date


Construction Schedule


Location


24 hrs.


Traffic Counts Construction Schedule To Date


Remarks


Lake St. to Washington St.


11610


1961


3100


1962 Sewer


Washington St. to Hanover


5782


1961


1000


1962 Sewer


Hanover St. to Expressway


1300


No Sewer


Expressway to Main St.


2100


No Sewer


13800


10. Neck St.


Bridge St. to Shaw St.


1604


1961 950


100% Sewered (Class B. Construction).


Shaw St. to North St.


1890


1956


1300


100% Sewered


Bridge St. to River St.


2913


1961


3000


Sewer Complete 1962


5250


247 11. North St. Wessagusset Rd. to Bridge St.


2400


No Sewer


Bridge St. to Commercial St.


7138 1961


6000


Partial Sewer


8400


12. Norton St.


Pearl St. to North St.


6649


1961


2600


Partial Sewer


2600


13. Pearl St.


Sea St. to North St.


6510


1961


3000


No Sewer-Partial 1962


3000


14. Pleasant St.


Main St. to Columbian Sq.


7523


1961


1350


No Sewer-1962 Constr.


Columbian Sq. to Rosemary Lane


7846


1961


6700


100% Sewered


Rosemary Lane to Lovell's Corner


6542


1961


3200


No Sewer


Lovell's Corner to Water St.


5540


1961


6100


No Sewer


Date


Prop. 1962


Future Total


Traffic Counts 24


Construction Schedule


Location


hrs.


Date


To Date


Prop. 1962 Future Total


Remarks


Water St. to Broad St.


4253


1961


1100


No Sewer


18450


15. Pond St.


Main St. to Main St.


6457 1961


7400


Partial Sewer


Main St. to Abington Line


2000


No Sewer


9400


16. Sommer St.


Front St. to Welland Rd.


2037 1961


2000


100% Sewered


Welland Rd. to Expressway


3400


No Sewer


Expressway to West St.


4100


No Sewer


9500


248


17. Union St.


Air Base to May Terrace


5700


No Sewer


May Terrace to Colombian Sq.


8242


1961


2500


Partial Sewer


.


8200


18. Wessagusset Rd. (Beach)


Massasoit Rd. to North St.


750


Sewer Planned for


Parking Lot.


750


19. West St.


Braintree Line to Sunnyplain Ave. 2541


1961 2600


Sewer Available


Sunnyplain Ave. to Main St.


3472


1961


2200


Sewer Available


4800


20. Winter St.


Main St. to Washington St.


3760


1961


2800


Partial Sewer - Finish


During Construction


2800


TOTAL 48550


8000


88050 144600


Summary MASTER HIGHWAY PROGRAM


Footage


Miles 27.38


Per Cent 100%


Total Master Program Including Chapter 90 144,600


Constructed to Date (1961)


48,550


9.20


33.6%


Proposed 1962


8,000


1.52


5.6%


Total Completed & Proposed


56,550


10.72


39.2%


Total Remaining in Program


88,050


16.66


60.8%


249


XII. Proposed Drainage - 1962


A. Weymouth Back River Flood Control


B. Essex Street Drain


$60,000 75,000


$135,000


The request for $60,000 in 1962 for Flood Control of Whit- man's Pond and Back River will make a total of $500,000 that has been appropriated by the Town. The State is matching this fund, making a total of $1,000,000.


The 1955 estimate of the Consultants for the project was $1,250,000. Two sections to be bid in 1962, will indicate closer what the final total cost will be. Due to changes in conditions caused by Massachusetts Electrical Company relinquishing their rights, it is predicted that the final cost will be more economical that the origi- nal estimate.


The request for $75,000 for supplementary drainage indicated on the Drainage Master Plan in the Essex Street area will alleviate flooding conditions and open up proper drainage in an area from Clapp Memorial to Spring Street.


Following is a Progress Analysis of Master Drainage from 1956 to and including proposed 1962.


250


PROGRESS ANALYSIS OF MASTER DRAINAGE PROGRAM 1956 TO PRESENT (METCALF & EDDY MASTER DRAINAGE REPORT)


DATE


TITLE


GENERAL DESCRIPTION & REMARKS


STATUS


APPROPRIATION & MATCHING FUNDS


1956


Rindge St. Drain


1204'-36" Pipe (Rindge, Jeffrey & Commer_ cial St.) Miscellaneous side drainage 1000'-8' Earth Channel-Dam work and miscellaneous side drainage


1962 Const.


7,100


Libby Field Drain


1140'-54" Pipe, 170'-42" Pipe, 356'-36" Pipe 483''-24" Pipe. Tunnel under R.R., - 1900' Earth Channel & Miscellaneous side drainage


Complete


135,000


$192,100


251


1957 Kensington Road Drain


One Contract


Complete


10,500


Shaw School Drain


183'-36" Pipe, 1027'-30" Pipe, 1778'-24" Pipe, 1233'-18" Pipe, 1946'-15" Pipe, 8046'- 12" Pipe 2150' - Earth Channel and Mis- cellaneous Side drains


Complete


12,000


Neck Street Drain Sea Street Drain


Complete


112,000


Complete


32,625


167,125


1958


Weymouth Back River Flood Control


Chapter 91-Funds to be matched by State- To accumulate for several years for large section contract Front St. 2-8x512 Reinforced Concrete Bridge Culvert


Future


110,500


110,500 (State)


East Street Drain & Front Street Box Culvert


39,260


-


Middle St. 2-7x8 Reinforced Concrete Bridge


Complete


Culvert Broad St. 5x4 Reinforced Concrete Bridge Culvert


Complete


$50,000


Cranberry Pond


PROGRESS ANALYSIS OF MASTER DRAINAGE PROGRAM 1956 TO PRESENT (METCALF & EDDY MASTER DRAINAGE REPORT)


DATE


TITLE


GENERAL DESCRIPTION & REMARKS


APPROPRIATION & MATCHING FUNDS


East St. 538'-30" Pipe, 309'-24" Pipe, 145-18" Pipe. 250'-12" Pipe & Misc. Side drainage


260,260


1959 Weymouth Back River Flood Control


Mill River, Mill Street To & Includ. West Street


Chapter 90-Funds to be matched by the State-To accumulate for several years for large section contract 2-8x512 Reinforced Concrete Bridge Culverts, 2380' of Channel Excavation, 3 Stilling Basins


Future


110,000


110,000 (State)


Complete


77,863


252


$297,863


1960 Weymouth Back River Flood Control


Chapter 91-Funds to be matched by the State-To accumulate for several years for large section contract.


Future


110,000


110,000 (State)


Phillips Creek From Back River & Hinston Road, Area I. Wessagusset Parking Lot


1251'-30" Pipe, 1740'-18" Pipe, 3205'-12" Pipe Tunnel thru Naval Embankment


Complete


90,000


625'-36" Pipe, 248'-24" Pipe and Miscellaneous Side Drainage


Complete


20,000


330,000


1961


Weymouth Back River Flood Control


Chapter 91-Funds to be matched by the . State-To accumulate for several years for large section contract


Future


110,000


110,000 (State)


Phillips Creek II From Fore River to North


1-7x5 Reinforced Concrete Bridge Culvert, 2285' Earth channel, 432'-18" Pipe, 309'-12" Pipe and miscellaneous other drainage


Complete


90,000


STATUS


PROGRESS ANALYSIS OF MASTER DRAINAGE PROGRAM 1956 TO PRESENT (METCALF & EDDY MASTER DRAINAGE REPORT) GENERAL DESCRIPTION & REMARKS STATUS


DATE TITLE


APPROPRIATION & MATCHING FUNDS


Phillips Creek III North to Green Street Area Smelt Brook


Approx. 3000' Earth Channel, 80'-42" Pipe 500'-18" Pipe, 400'-15" Pipe, 700'-12" Pipe and miscellaneous side drainage


In Progress


Flood control-Weymouth-Braintree & State Chapter 91. 10x9 Reinforced Concrete Bridge Culvert under R.R. to alleviate Landing flooding


Future


30,000 (State) 15,000 (Braintree) 15,000 (Weymouth)


370,000


Proposed 1962


Weymouth Back River Flood Control


Chapter 91-Request of $60,000 with State Share Totals $1,000,000. First section to be bid early 1962-Second section later 1962 Approx. 1100'-66" pipe, 400'-54" pipe, 900'-12" Pipe and miscellaneous side drainage


Future


60,000


253


60,000 (State)


Essex & Broad Street Drain


Proposed 1962


75,000


$195,000


TOWN OF WEYMOUTH PUBLIC WORKS DEPARTMENT SUMMARY MASTER DRAINAGE PROGRAM 1956-PRESENT 1960 220,000 TOWN 110,000 330,000 TOTAL STATE AID DATE


APPROPRIATION


1956


$ 192,100


$ 192,100


1957


167,125


167,125


1958


149,760


$110,500


260,260


1959


187,863


110,000


297,863


1961


215,000


110,000 State


30,000 State


15,000 Braintree


370,000


TOTAL


$1,131,848


$485,500


$1,617,348


PROP. 1962


135,000


60,000


195,000


$1,266,848


$545,500


*$1,812,348


*$1,000,000 of total is committed to Weymouth Back River Flood Project to be commenced in 1962.


254


XIII. SUMMARY OF CAPITAL OUTLAY PROGRAMS 1958 TO AND INCLUDING 1962.


Following is a charted summary of Capital Outlay as executed by the Public Works Department 1958-1962.


DEPARTMENT OF PUBLIC WORKS, TOWN OF WEYMOUTH CAPITAL OUTLAY 1958-Proposed 1962


I. HIGHWAYS


1958


1959


1960


1961


Prop. 1962


A. Chap. 90 (State Aid)


58,000


50,000


80,000 250,000


96,000


96,000


B. Master Highway


100,000


250,000


250,000


250,000


158,000


300,000


330,000


346,000


346,000


II. DRAINAGE


255


A. Chap. 91 (State Aid) Back River Smelt Brook


110,500


110,000


110,000


110,000 15,000


60,000


B. Supplementary


77,862 (Mill River) 90,000


(Phillips Creek)


Creek & Mill River) Essex St.


110,500


187,862


200,000


215,000


135,000


III. SHORE PROTECTION & BEACH IMPROVEMENTS A. Sea Walls


4,400


10,000


10,000 (River St.)


B. Beach Improvements


66,100


20,000


12,500


C. Other


1. Parking Lot (Beach)


53,250 (Land)


20,000


5,000


2. Marina


4,000 (Land)


3,500 (Plans)


11,000


10,000


3. Dredging


15,000


74,500


76,750


53,500


20,000


20,000


90,000 (Phillips


75,000


DEPARTMENT OF PUBLIC WORKS, TOWN OF WEYMOUTH CAPITAL OUTLAY 1958-Proposed 1962


1958


1959


1960


1961


Prop. 1962


IV. SEWERS


A. Common


323,968


328,500


293,242


348,500


446,900


B. Particular


100,800


104,700


126,400


125,300


159,000


C. Other (Fed. Aid)


325,000


424,768


433,200


744,642


473,800


605,900


V. WATER DIVISION


A. Well Fields


15,000 100,000


256


C. Land-Great Pond


25,000


D. Land-Whitman's Pond


20,000


E. Land-Winter St.


20,000


F. Wells & Mains


90,000


40,000


G. Reinforcing


100,000


H. Chlorinating Facility


12,500


115,000


155,000


None


140,000


12,500


GRAND TOTALS


$882,768


$1,152,812


$1,328,142


$1,194,800


$1,119,400


B. Stand Pipes


1


XIV. DIVISIONAL REPORTS


A. Engineering Division-Continued.


3. Special Layouts and Projects.


a. Layout, line and grade for Highway Division street construction of Albert Rd., Edith Rd., Fairway St., Friend St., Gibbens St., Gilbert Rd., Oakcliff Rd., Primrose Lane, Spring St., Sutton St., Winstred Rd., and Wright St.


b. Surveys, plans and descriptions for takings of widening and relocation of portions of River St., Liberty Square, Fogg Rd., Union St., Gilbert Rd., and Common Land on Church St.


c. Topography and profile of Rockway Ave. for develop- ment of town gravel pit in conjunction with proposed Armory construction.


d. Titile reference and descriptions of (17) seventeen streets submitted for acceptance at A. T. M. 1961.


e. Land Court Survey, plan description and petition for Wituwamat Sewer Pumping Station.


f. Revision and production of master plans for Drainage, Highway, Sewer and Sidewalk Programs.


g. Layout and study for drainage easements for Essex St. Drain from Commercial Street to Colonial Acres.


h. Survey, design, contract plans and specifications for proposed Cranberry Pond Drainage Improvements-to be let out for contract in early Spring.


i. Survey, design, contract plans and specifications for proposed Highway Program 1962, proposed reconstruc- tion of Commercial, Middle and Winter Streets.


j. Layout and design of Master Drainage Trunk Lines for the Rindge Street Drain and High Street Drain.


Through cooperative planning, the private developer of the Heritage Lane Subdivision was required to install a section of the Master Drainage Program from Rindge Street to Cornish Street at no cost to the Town-a saving of approximately $30,000 to the Town. The design and layout of the sewer, in- stalled by the developer, has made it possible for the Town to reach abutting trouble areas many years sooner than expected at very little cost to the Town.


The proposed construction of the new First National Stores Shopping Center at Lower Jackson Square will require the installation of a section of the Master Drainage Program, a 48" drain line from Commercial Street to High Street at no cost to the Town-a saving of approximately $15,000 to the Town.


257


XIV. DIVISIONAL REPORTS


A. Engineering Division-Continued.


4. Miscellaneous


a. For the year 1961, $308.00 was turned over to the Town Treasurer for the sale of contracts and plans.


The transfer of the Sewer Engineers into the Engineering Division to form one Engineering Division for the Town under one roof with modern working conditions, has provided more flexibility of service to all departments and the Division has been able to increase the quantity of work and still maintain a high quality.


Following is a summary of Drainage, Roadway and Costs -1961 as engineered by the Department Division.


DEPARTMENT OF PUBLIC WORKS, TOWN OF WEYMOUTH XIV. DIVISIONAL REPORTS


A. Engineering Division


Town Engineer, Frank S. Lagrotteria


Asst. Engineer, John H. Morse


Senior Clerk, Alice Welsh


1. General Functions


1960


1961


a. Stone Boundary, Markers Set


87


99


b. Street Lines Established


46


64


c. House Sill Grades


140


136


d. Line & Grade-Sidewalks


8


7


e. Assessor's Transfers Tabulated


1150


1240


f. New Structures Mapped


480


370


g. Traffic Counts


35


57


h. Descriptions, Tax Title, Easements


13


91


i. Drain Easements, Plans Surveys


15


24


j. Police Survey & Plans