Carter Bros. installed 1,000 feet of storm drain pipe in the Jason Heights development. There was 1141/2 feet of 4 inch drain pipe installed as a collecting drain in Varnum Street.
292
ARLINGTON TOWN REPORT
TABLE III SANITARY DIVISION
Appropriation for 1933.
$78,268.40
Expenditure
78,185.44
Balance, Jan. 1, 1934
$82.96
Net Expense
Ashes
24,620.22
Offal
32,999.72
Paper and Rubbish.
13,931.29
Repairs
363.54
Sundries and Supplies
267.68
Miscellaneous
353.95
*Salaries
3,358.68
** Automobile
2,290.36
Total
$78,185.44
*Superintendent of Sanitary Division, $2,700.00; Timekeeper, $658.68 ($459.00, salary; use of auto, $199.68).
** Includes cost of new car and part of purchase price on new truck.
SEWER DIVISION
Three thousand, nine hundred and twenty-nine feet of main sewer were laid during the year.
Eighty-six connections were made with the mains.
Details of regular sewer construction and mainten- ance will be found in Tables 4 and 5.
TABLE IV
SEWER CONSTRUCTION
Appropriation for 1933.
$18,268.40
Balance from 1932 forwarded.
4,030.89
From Reserve Fund
1,000.00
$23,299.29
Expenditure
23,184.24
Balance, Jan. 1, 1934 ..
$115.05
(Carried forward to 1934)
LOCATION
Size of Pipe in inches
Length in Feet
Net Cost
Cost per foot
Alpine Strcet (Summer Street to No. 87)
8
389
$1,368.45
$3.52
W
Clark Street (To service No. 24) ..
8
110
248.30
2.26
Davis Avenue ('To service No. 5)
8
50
225.50
4.51
Forest Stret (To service No. 258)
8
140
667.64
4.77
Grand View Road ( To service houses Nos. 35 and 44)
8
469
2,339.89
4.99
Hartford Road (To service No. 5)
8
221
636.00
2.88
W
Hillside Avenue (From Wachusett Avenue to Waverley Street)
8
87
150.21
1.73
W
Hilton Street (Install lamphole at end of main)
8
40
212.05
5.30
W
Locke Street ( From Metropolitan sewer to No. 20)
8
127
328.25
2.58
W
Lockeland Avenue (to service Lot 54)
8
149
371.86
2.50
W
No. 16 Mystic Lake Drive ( water-proof cover on manhole)
11.26
Mill Street (To service No. 87)
8
176
1,363.31
7.75
W
Mystic Valley Parkway (To service No. 300-02)
6
160
445.15
2.78
W
Newland Road ( From Summer Street to No. 73)
8
426
1,906.10
4.47
W
Park Avenue Extension (To service Nos. 108-112)
8
221
1,310.61
5.93
Pleasant Street (Opposite Brunswick Road)
8
35
316.30
9.04
Piedmont Street ( From Ortona Street to Williams Street)
8 201
638.77
3.18
W
Summer Street
592.31
BOARD OF PUBLIC WORKS
293
30.96
Huntington Road (From old end to No. 44).
Wall Street (From Arlmont Street easterly) Williams Street (From Piedmont Street to Rublee Street)
8
145
987.57 842.36
6.81 3.86
W
294
SEWER EXTENSION ORDERED IN 1932, COMPLETED IN 1938
Summer Street (From Park Avenue Extension to Summit Street) Total cost of mains. *General Expense ...
8-12-15
562
3,773.43
$35.12
18,766.28
5,311.09
Credit for stock
$24,077.37 893.13
Totals ..
3,929
$23,184.24
...
*Particular sewers, $1,656.07; tools and equipment, $346.67 ; miscellaneous, $1,013.51; Saturday afternoons, $1,304.79; vacations. $343.50 ; holidays, $624.74 ; automobile, $21.81.
#Cost per foot arrived at by including cost of extension as shown by 1932 report.
"W" indicates water in same trench.
ARLINGTON TOWN REPORT
W
8
218
$14,992.85
295
BOARD OF PUBLIC WORKS
TABLE V SEWER MAINTENANCE DIVISION
Appropriation for 1933.
$5,220.00
Expenditure
5,158.31
Balance, Jan. 1, 1934.
$61.69
Expenditures
Repairing, flushing and cleaning mains.
$3,509.13
Care and repair of particular sewers.
695.06
Miscellaneous
179.75
*General expense.
774.37
Total
$5,158.31
*Tools and equipment, $382.70; Saturday afternoons, $267.65; holidays, $58.15; Timekeeper, $65.87.
SUMMARY OF SEWERAGE STATISTICS
General
Population by census of 1930, 36,089.
Total area of town, 5.5 square miles.
Area served by sewerage system, 4.5 square miles.
Collection System
For sewerage only, 71.82 miles, includes 5.64 miles Metropolitan sewer.
For sewerage and surface water, 0 miles.
For surface water only, 35.35 miles.
Method of disposal, sewerage into Metropolitan sewer, surface water into brooks.
296
ARLINGTON TOWN REPORT
Collection
Mains. (Everything but house and catch basin con- nection.)
For sewerage For surface only
only
1. Lineal feet pipe
379,225
186,648
2. Lineal feet extended during year 3,929 8,624
3. Number of inverted siphons, 2.
4. Number of manholes, 1816, and 32 combination sewer and storm drain manholes.
5. Method of flushing: Water service at manhole ends of lateral lines.
6. Method of cleaning: By a special brush drawn from manhole to manhole.
7. Number of automatic flushing tanks, 0.
8. Number of direct connections with water mains for flushing, 40.
9. £ Number of flushings of system during the year, en- tire system once.
10. Cost of flushing per mile )
11. Cost of cleaning per mile S $49.37
12. Number of stoppages, 3.
13. Method of ventilation, manhole covers.
14. Electric pump chambers, 2.
House Connections
1. By whom made: All connections made under the di- rection of the Sewer Division, Board of Public Works.
2. Sizes, 5, 6, 8, 10, 12 and 15 inches.
3. Number made during year, 86.
4. Lineal feet laid during year (drain layers), 4525.6.
5. Lineal feet discontinued during year, 0.
6. Total miles in use, 56.59.
7. Number of stoppages coming to attention of Depart- ment, 41.
297
BOARD OF PUBLIC WORKS
Discharge of Sewer
1. Estimated population using sewer system, 32,900.
2. Number of buildings connected, 6,196.
3. Daily discharge for year .*
4. Daily discharge for each user .*
5. Daily quantity of factory waste .*
6. Daily leaking into sewers .*
7. Daily leaking per mile of sewers .*
8. Are quantities given under 3 to 7 estimated or meas- ured ?
* Note-See Metropolitan Sewerage Board Report
General
Total cost of collecting mains, $1,077,742.87.
Debt outside of limit, $100,000.00.
Sinking Fund, $91,149.13.
Serial Notes, $25,000.00.
Average rate of interest on bonds outstanding, 4 per cent.
Proportion of cost of extensions assessed on abutters this year, 23.33 per cent.
Yearly assessment for maintenance, none.
Method of assessing abutters and rate of assessment, as specified by the acts of 1930, chapter 140.
WATER DIVISION
Three thousand, five hundred and twenty feet of new water mains were laid during the year and connected with the Metropolitan system, and one thousand two hundred and forty-three feet of mains were renewed during the year. Details of regular water main construction will be found in Table 6.
298
ARLINGTON TOWN REPORT
SERVICES
Ninety-two new services have been added during the year and no services were abandoned. There are for all purposes, 3,262 on the low, 4,131 on the high, and 3 on the old reservoir system. On the Metropolitan water supply there are 40 services for municipal purposes, 32 sprinkler services, and 40 for sewer flushing purposes included in the above. On January 1, 1934, 288 services were tempo- rarily out of use.
METERS
Ninety-two meters were set during 1933 on services installed in 1927, 1931, 1932, and 1933. The total number of meters in use January 1, 1934 is 7,324.
WATER MAINS NOW IN SERVICE
LOW SERVICE SYSTEM
High Service System
RESERVOIR SYSTEM
Size
Cement-lined Pipe
Cast Iron Pipe
Cast Iron Pipe
Cement and Cast Iron Pipe
Inches
Length Feet
Hyds.
Gates
Length Feet
Hyds
Gates
Length Feet
Hyds
Gates
Length Feet
Hyds
Gates
16
2,388
12
6,791
30,516
7,392
10
13,864
22,848
270
8
37,629
57,390
2,156
6
185
101,121
152,112
1,687
4
373
616
1,620
Totals
558
2
5
160,021
312
472
265,254
534
1,007
13,125
12
17
BOARD OF PUBLIC WORKS
299
TABLE VI
WATER EXTENSIONS
Appropriation
$18,095.24
Balance 1932.
5,025.97
Transfer from Highway Division
3,000.00
$26,121.21
Expenditures,
1933
26,018.70
Balance, Jan. 1, 1934.
$102.51
EXTENSION OF HIGH SERVICE SYSTEM
Description
Size of Pipe in Inches
Length in Feet
Number of Hydrants
Number of Gates
Total Cost
Cost per Foot
Totals
Alpine Street (old end to Summer Street)
8
178
1
2
$617.80
$3.47
S
Arlr ont Street (old end to No. 20) ..
8
80
209.53
2.62
Crosby Street (old end to Upland Road West)
8
260
583.22
2.24
Hartford Road-Winchester Road to No. 5.
8
229
1
781.00
3.41
S
Hillside Avenue-Wachusett to Waverley.
8
245
3
715.92
2.92
S
Huntington Road (old end to Lot B) ..
8
38
186.50
4.91
S
Installing Reducing Valves, Brattle and Gray Streets ..
8-10
265
10
1,195.51
4.51
· Locke Street, Peirce Street to northerly end ..
8
188
1
2
669.87
3.56
S
Lockeland Avenue-Temple to Gray Street ...
6-8
309
2
839.50
2.72
S
Mill Street-Crosby Farm to No. 87 ..
12
102
2
1,334.51
3.32
S
Newland Road (old end to Summer Street)
12
230
1
1,002.11
4.36
S
Piedmont Street, Ortona to Williams.
8
230
1
2
778.02
3.38
S
Pleasant Street, Installing Gates ..
8
30
3
375.85
12.53
Sunset Road (old end to No. 102) ....
8
140
1
2
730.19
5.22
Upland Road West-Crosby Street, southerly.
8
167
1
1
648.31
3.88
S
8
195
2
853.26
4.38
S
3,263
6
27
$11,655.46
$11,655.46
ARLINGTON TOWN REPORT
300
8
77
134.36
1.75
Wall Street-Arlmont Street, northerly.
Williams Street-Piedmont Street to Rublee Street.
EXTENSION OF LOW SERVICE SYSTEM
Description
Size of Pipe in Inches
Length in Feet
Number of Hydrants
Number of Gates
Total Cost
Cost per Foot
Totals
Hilton Street-Install hydrant at end of main ..
6
20
1
Margaret Street-Eliminate dead ends ..
6
57
1
132.38 251.39
6.62 4.41
Medford Street to Medford line and Mystic Valley Parkway ..
8
180
4
772.72
4.29
*Decatur Street
1
Harlow Street.
1
Hillside Avenue ..
1
Medford Street.
2
North Union Street ..
I
Pleasant Street.
7
Robbins Road ..
2
Thorndike Street.
257
1
21
$1,156.49
$1,156.49
Total Extensions.
3,520
7
48
$12,811.95
S
1
BOARD OF PUBLIC WORKS
301
RENEWALS-HIGH SERVICE
Description
Size of Pipe in Inches
Length in Feet
Number of Hydrants
Number of Gates
Total Cost
Cost per Foot
Totals
Gray Street-Mt. Vernon to Walnut
** Hillside Avenue .. Pleasant Street ... Robbins Road ..
6-8-12
663
5
4,871.15
7.35
1
5
1
Summer Street ...
1
RENEWALS-LOW SERVICE
Decatur Street ..
Harlow Street ..
1
Medford Street.
2
North Union Street.
1
RENEWALS-RESERVOIR SERVICE
*** Pleasant Street.
8
580
2
Total renewals. Total high and low extensions.
1.243
15
5
4,871.15 12,811.95
Total extensions and renewals ..
$17,683.10
$17.683.10
Extensions of service ..
3,678.74
1.059.98
Service installation private property. ¿General expense ...
6.241.29
Credit for stock used.
2.644.41
Expenditure
$26.018.70
*Following new gates installed by Water Maintenance.
** Following gates and hydrants renewed by Water Maintenance. *** Cost of renewing reservoir main in Pleasant Street paid for under Water Maintenance ($1,889.42) . #Includes tools and equipment. $838.62 ; miscellaneous. $1,284.39 ; Saturday afternoons, $1.267.75 ; vacations, $2.485.00 ; holidays. $365.53.
. "S" Indicates sewer in same trench.
ARLINGTON TOWN REPORT
302
1
T
...
303
BOARD OF PUBLIC WORKS
TABLE VII.
WATER MAINTENANCE DIVISION
Appropriation for 1933 $38,749.20
Transferred from Reserve Fund 2,000.00
Expenditure
$40,749.20 $40,745.94
Balance January 1, 1934. $3.26
DISTRIBUTION OF EXPENDITURES
Gross Ex- Net Ex-
Maintenance
penditures Credits penditures
Services, care and repair .. $9,008.69
Meters, care, repair, in-
spection and reading ...... 11,040.12
Turning water off and on .. 28.43
Shop
535.26
Tools and equipment.
399.52
Hydrants and Gates, care and repair
1,456.57
Mains, care and repair.
925.48
*General Expense 7,547.91
Reservoir and Great Meadows
1,139.56
Renew Services, Margaret Street 309.80
Renew Services, Medford Street
1,905.89
Replacing Hydrants, Med- ford Street 189.60
Renew Services, Pleasant Street 3,681.91
Replacing Hydrants ,
Pleasant Street 687.78
304
ARLINGTON TOWN REPORT
Renew Reservoir Main, Pleasant Street
1,889.42
Total
$40,745.94
Total Maintenance Cost
$40,745.94 * Vacations, $687.38; Holidays, $861.41; Saturday afternoons, $1,921.92; Automobile, $28.30; Miscellaneous, $3,649.15; Time- keeper, $65.85; Stockkeeper, $333.90.
RECEIPTS FOR WATER CONSUMED
Year
1923
$76,144.32
1924.
84,390.12
1925
89,741.62
1926
113,656.95
1927
110,178.74
1928
108,477.44
1929
138,158.19
1930.
162,283.18
1931
158,301.98
1932.
161,355.72
1933
163,426.20
ARLINGTON WATER WORKS Arlington, Middlesex County, Mass.
Population by census of 1930, 36,089.
Date of construction, low service, 1872; high service, 1894.
By whom owned, Town of Arlington.
Source of supply, Metropolitan Water System.
Consumption
1. Estimated total population at date, 38,000.
2. Estimated population on lines of pipe, 37,000.
3. Estimated population supplied, 37,100.
4. Total consumption for the year, 774,336,900 gallons.
305
BOARD OF PUBLIC WORKS
5. Percentage of consumption metered, 100%.
6. Average daily consumption, 2,120,900 gallons.
7. Gallons per day to each inhabitant, 50.
8. Gallons per day to each consumer, 50.
Distribution
(including auxiliary supply from old reservoir)
Mains
1. Kind of pipe; cast iron and cement.
2. Sizes, from 4 inch to 16 inch.
3. Extended feet during year, 3,520.
4. Discontinued, 1,243.
5. Total now in use, 83.1 miles.
6. Cost of repairs per mile, $28.90.
7. Length of pipe less than 4 inches in diameter, 2,100.
8. Number of hydrants added during year (public), 7.
9. Number of hydrants (public and private) now in use, 860.
10. Number of stop gates added during year, 48.
11. Number of stop gates now in use, 1,490.
12. Average pressure on mains at center of Town, 10€ high system, 60 low system.
Services
16. Kind of pipe; cement-lined, black wrought iron and lead, 3 inch to 6 inch cast-iron.
17. Sizes, 1 inch to 6 inch.
21. Number of service taps added during year, 92.
22. Number of services now in use, 7,324.
25. Number of meters added, 92.
26. Number of meters abandoned, 0.
27. Number now in use, 7,324.
28. Percentage of receipts from metered water, 90.94% .
29. £ Percentage of services metered, 100 per cent.
306
ARLINGTON TOWN REPORT
Highway Equipment
Appropriation $700.00
(Carried forward from 1932)
Expenditure 0
Balance, Jan. 1, 1934 $700.00
Sewer and Water Mains-Medford and Pleasant Streets
Appropriation (from Reserve Fund) $ 3,000.00
Expenditure *3,000.00
Jan. 1, 1934 0
*This sum transferred as follows:
Sewer Extensions-Particular Sewers, $1,000.00
Water Maintenance-Renew Services, Medford Street 500.00 Water Maintenance-ditto, Pleasant St. 1,500.00
General Administration
Appropriation $15,043.00
Expenditure 14,637.37
Balance, Jan. 1, 1934. $405.63
1931 Street Construction
Appropriation $ 7,952.97
(Carried forward from 1931)
Transferred to 1933 Street Construction 7,500.00
$452.97
Expenditure
52.96
Balance, Jan. 1, 1934. *$400.01
*Balance carried forward to 1934.
307
BOARD OF PUBLIC WORKS
1930 Street Construction
Appropriation $ 71.18
(Carried forward from 1930)
Expenditure
33.50
Balance, Jan. 1, 1934 $37.68
1929 Street Construction
Appropriation $ 38.45
(Carried forward from 1929)
Expenditure 0
Balance, Jan. 1, 1934
$38.45
Sidewalks, Summer Street Boulevard
Appropriation $ 1,746.99
(Carried forward from 1931)
Expenditure 0
Balance, Jan. 1, 1934 *$1,746.9
*Balance carried forward to 1934
Sale of Building, Great Meadows
Appropriation $ 100.00
Expenditure 100.00
Jan. 1, 1934 0
Alteration, Mill Street and Massachusetts Avenue
Appropriation $ 234.68
(Carried forward from 1931)
Expenditure 0
Balance, Jan. 1, 1934. $234.68
308
ARLINGTON TOWN REPORT
Alteration of Medford Street
Appropriation $ 690.00
Expenditure 15.01
Balance, Jan. 1, 1934. *$674.99
*Balance carried forward to 1934.
Alteration of Warren Street
Appropriation $ 200.00
Expenditure 7.53
Balance, Jan. 1, 1934 *$192.47
*Balance carried forward to 1934.
Brooks Avenue Construction
Appropriation
$14,978.30
Expenditure 11,298.09
Balance, Jan. 1, 1934. $3,680.21
Egerton Road Construction
Appropriation
$ 4,965.94
Expenditure 3,280.90
Balance, Jan. 1, 1934 $1,685.04
Margaret Street Construction
Appropriation
$16,710.33
Expenditure 19,075.93
Deficit, Jan. 1, 1934 $2,365.60
309
BOARD OF PUBLIC WORKS
Melrose Street Construction
Appropriation $ 4,996.77
Expenditure 3,966.60
Balance, Jan. 1, 1934. $1,030.17
Milton Street Construction
Appropriation
$ 4,971.59
Expenditure 3,119.34
Balance, Jan. 1, 1934. $1,852.25
Respectfully submitted,
EDWARD T. RYAN,
RALPH ADAMS, JOHN E. MITCHELL,
Board of Public Works.
REPORT OF THE JOINT BOARD OF SELECTMEN AND BOARD OF PUBLIC WORKS
To the Honorable Board of Selectmen, Arlington, Mass.
Gentlemen:
The Joint Board of Selectmen and Board of Public Works respectfully submits its thirtieth annual report for the year ending December 31, 1933.
At the Annual Town Election held March 6, 1933, Mr. George H. Lowe, Jr., was elected a Selectman for a term of three years, and Mr. John E. Mitchell was elected a member of the Board of Public Works for a term of three years, and by virtue of such elections both be- came members of this Board.
The Board organized with Mr. Arthur P. Wyman, Chairman.
The following appointments were made for the year 1 ending April 1, 1934: Secretary, James J. Golden, Jr .; Town Counsel, John L. Murphy; Town Engineer, James M. Keane; Superintendent of Wires, William E. Mason.
NEW STREETS
Applications were received requesting estimates for the construction of nineteen streets. Seven of this num- ber were recommended by the Board for construction.
310
JOINT BOARD OF SELECTMEN AND PUBLIC WORKS 311
At the Annual Town Meeting the following were ac- cepted for construction :
Brooks Avenue Egerton Road
Margaret Street Melrose Street
Milton Street
The sum of money appropriated for this purpose was $46,622.93.
STREET LIGHTS
The Street Lighting schedule has continued as in previous years, and additional lights have been installed on private and public ways where it was deemed neces- sary.
SIGNAL SYSTEMS
On July 1, 1933, Lester W. Cameron took over the duties of Superintendent of the Fire and Police Signal System, succeeding Daniel B. Tierney, Chief of the Fire Department, who had asked to be relieved of this added responsibility.
This department had been under the control and supervision of Chief Tierney for several years and the results obtained were most satisfactory.
The System continues in good working order, addi- tional signal boxes have been installed, and several ex- isting boxes have been re-located to points where they would serve more efficiently.
SIDEWALKS AND EDGESTONES
The Finance Committee after careful consideration, and with due regard to existing conditions, recommended that no money be appropriated for the construction of permanent sidewalks and the installing of edgestones in
312
ARLINGTON TOWN REPORT
1933. This recommendation was supported by the Town Meeting Members at the Annual Town Meeting. For the first time in years there were no sidewalks constructed or edgestones installed.
NEW BOARD OF SURVEY PLANS
The Board took favorable action on the following plans presented for approval: Appleton Place and Central Street and Warren Street.
The Board recommended that alterations be made on Medford and Warren Streets which was accepted by the Town Meeting Members at the Annual Town Meeting.
The names of the following streets were changed by the Board upon petition of property owners :
Meadow Street, from Summer Street to Berkeley Street, to Arthur Road.
Cutter Avenue, from Summer Street to Mill Street to Richfield Road.
ITEMS OF GENERAL INTEREST
Hearings have been given on petitions from the New England Telephone and Telegraph Company of Massa- chusetts and the Edison Electric Illuminating Company of Boston for pole locations and underground conduits, and the Arlington Gas Light Company requests for loca- tions for gas mains in various public ways have been granted.
Medford Street, from Warren Street to the Medford line and Pleasant Street, from Arlington Centre to the Belmont line have been reconstructed with bituminous
JOINT BOARD OF SELECTMEN AND PUBLIC WORKS 313
concrete. The State, County and Town shared in the expense of these improvements.
The Board has given careful study and consideration to all matters coming before it for action, and has en- deavored to promote the best interests and welfare of the Town.
ARTHUR P. WYMAN, LEONARD COLLINS, GEORGE H. LOWE, JR., EDWARD T. RYAN, RALPH ADAMS, JOHN. E. MITCHELL,
Joint Board of Selectmen and Board of Public Works.
REPORT OF FINANCE COMMITTEE
The Finance Committee of 1933-1934 was organized with fourteen members, one from each precinct, and held nine meetings to December 31, 1933, with an average at- tendance of thirteen.
The Committee gave consideration to all Articles in the Warrants, and has transferred the amount of its Reserve Fund, $15,000, as provided in the Town By-laws and State regulations to the various town departments.
The following transfers were made from the Reserve Fund in 1933: 1933
May 29. Selectmen's Contingent Fund $ 140.00
Robbins Memorial Town Hall 525.00
June 19. Sewer and Water Extensions. 3,000.00
Park Department 450.00
Police Department 1,476.00
Sept. 29. Repairs to Town Houses 89.09
Elections and Town Meetings 309.73
Public Welfare 500.00
Tree Warden 50.00
Nov. 17. Collector of Taxes 250.00
Elections and Town Meetings. 7.64
Police Department 670.00
Sealer of Weights and Measures. 149.50
Tree Warden 50.00
Repairs to Houses Owned by Town .. 84.50
314
315
REPORT OF FINANCE COMMITTEE
Nov. 24. Unemployment 500.00
Nov. 28. Unemployment 4,000.00
Town Meetings and Elections. 200.00
Board of Appeal
35.00
Dec. 15.
Repairs to Town Houses
7.59
Traffic Signals 60.00
Police Department 265.00
Elections and Town Meetings. 1,000.00
State and Military Aid. 120.00
Dec. 30.
Elections and Town Meeting's
449.15
Police Department 280.00
Traffic Signals
15.00
Welfare Department
316.80
The work of the 1933-34 Finance Committee is handled by the following sub-committees :
Public Works and Parks
D. Herbert Buttrick, Chairman
Arthur O. Davidson
A. Clifford Hudson
Leo A. Murphy
Precinct 8
Precinct 1
Precinct 7
Precinct 2
Schools, Library and Welfare Departments Archibald C. Loveys James F. Younie Francis A. O'Hearn
Selectmen, Police, Fire and Cemeteries Harold M. Estabrook T. Gordon Smith Edward D. Buckley
Precinct 9
Precinct 11 Precinct 3
Precinct 14
Precinct 12 Precinct 4
316
ARLINGTON TOWN REPORT
Miscellaneous Departments Joseph C. Ohlund
George T. Hagerman Daniel W. Flynn
Precinct 13
Precinct 10
Precinct- 5
ERNEST W. DAVIS, Chairman
HAROLD M. ESTABROOK, Vice-Chairman
ARTHUR O. DAVIDSON, Secretary
REPORT OF THE TOWN ENGINEER
To the Honorable Joint Board of Selectmen and Board of Public Works, Arlington, Mass.
Gentlemen:
I respectfully submit my report as Town Engineer for the year ending December 30, 1933.
As has been customary, this department is required to render services to all Town departments when required. We have, during the year, performed such services when called upon, and we have been exceptionally busy.
I will not attempt to enumerate the many and de- tailed accomplishments during the past year, but will re- view only in a general way what has been done by this branch.
All necessary estimates on construction work have been made. Numerous lines and grades have been given for street, sidewalk, sewer, and drain construction.
Record plans were made of all new streets laid out, and all sewer, water, and drains laid ; also all assessments were furnished for sidewalk, curb, sewer, and street as- sessments.
From November 15 to December 30 it was necessary to devote the time of 50% of the employees of this de- partment to Civil Works Administration projects which
317
318
ARLINGTON TOWN REPORT
included draughting plans showing proposed construc- tion, lines and grades for sewer mains, etc., and general inspection and supervision of this work.
I feel deeply grateful to my assistants and all others who have given their help and hearty co-operation throughout the year, and it has been a pleasure working under such ideal conditions.
Annexed to this report is a table of general statistics pertaining to the Town, and a list of the public and pri- vate streets.
Respectfully submitted,
JAMES M. KEANE, Town Engineer.
319
TOWN ENGINEER'S REPORT
TABLE SHOWING THE LOCATION, LENGTH AND WIDTH OF PUBLIC AND PRIVATE STREETS
Name
Location
Width
Date of Acceptance
Public
Private
¡Abel Road.
Winchester Line, southerly, near Hucthinson Road.
50
335
Aberdeen Road.
45 Tanager Street to 71 Dundee Road
40
362
430
March 24, 1919; March 26, 1930
Academy Street ..
734 Massachusetts Avenue to 40 Irving Street.
40
1520
April 2, 1866; September 20, 1875
Acton
Street.
21 Appleton Street to Junior High West ..
510
November 2, 1886
Adams Street ..
319 Massachusetts Avenue to 216 Broadway.
40
928
March 28, 1923
Addison Street.
106 Pleasant Street to Spy Ponl.
40
800
March 9, 1891
Aerial Street.
169 Forest Street, 288 Washington Street.
40
375
750
March 25, 1931
Albermarle Street ..
50 Walnut Street to 35 Mt. Vernon Street.
40
392
March 20, 1916
Alfred Road.
97 Lake Street to Spy Pond Parkway.
40
568
March 24, 1927
Allen Street ..
339 Massachusetts Avenue to 70 Warren Street .. 26 Park Avenue Ext., northerly.
40
1335
Alpine
Street ..
580 Summer Street, southerly.
40
105
Alpine Street ...
583 Summer Street to 49 Huntington Road.
40
380
Alton Street.
295 Boadway to 158 Warren Street.
40
731
April 3, 1929
Need help finding more records? Try our genealogical records directory which has more than 1 million sources to help you more easily locate the available records.