USA > Massachusetts > Middlesex County > Arlington > Town of Arlington annual report 1955 > Part 22
Note: The text from this book was generated using artificial intelligence so there may be some errors. The full pages can be found on Archive.org (link on the Part 1 page).
Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 | Part 18 | Part 19 | Part 20 | Part 21 | Part 22 | Part 23 | Part 24 | Part 25 | Part 26 | Part 27
I wish at this time to thank you, the members of the Board of Public Welfare, and all officials, department heads and employees of the town who have assisted me and members of my staff through- out the year. Particularly do I thankfully acknowledge the co-opera- tion of the workers in this department, and the many services rendered by private social agencies, service organizations, church and civic groups and individuals. I feel that we are all dedicated to the proposition that economic insecurity must be replaced by pur- poseful and useful living. It is our biggest problem today.
Respectfully submitted, GEORGE V. MORSE
Agent
259
DEPARTMENT OF PUBLIC WORKS
Annual Report of the Department of Public Works
Mr. Edward C. Monahan Town Manager Arlington, Mass.
Dear Mr. Monahan:
The Department of Public Works herewith submits its Annual Report for the year ending December 31, 1955.
The Department during 1955 constructed Sunnyside Avenue from Broadway to its end; Hamlet Street from Beacon Street to Webster Street; Philips Street from Beacon Street to Webster Street; Edgehill Road from Summer Street to Richfield Road and Farrington Street from Mystic Street to Rangeley Road.
In accordance with Article 44 of the Warrant for 1955, a sidewalk was installed on the South side of Lowell Street from Park Avenue to the Reservoir.
In accordance with Article 45 of the Warrant of 1955, Edgestone and a Granolithic Sidewalk was installed on the North side of Eastern Avenue from Grand View Road to vicinity of Scituate Street. Other sidewalks and edgestones were installed from the Sidewalk and Edge- stone appropriation, Article 43 of 1955.
Sewer mains, water mains and storm drain mains were installed in various locations throughout the Town. All underground structures such as sewer, water and storm drains were maintained and cleaned.
The collection of Rubbish from all residential and business areas was performed on a weekly basis. In connection with this, it was necessary to utilize the area in the rear of the Reservoir, inasmuch as the Fowles Pond area is rapidly becoming filled.
All public roadways and sidewalks were maintained and many roadways received a seal-coating treatment. This program will be continued in 1956 to as great an extent as possible.
During the winter season snow and ice were removed from our highways and sidewalks and every effort made to provide the type of service which Arlington residents have been accustomed to and expect.
Under the provisions of Article 42, Improvement of Volume and Pressure-Water System, many miles of water mains were cleaned. The entire length of Oxford Street was relayed, installing a 10" main and removing an old 6" main which was in bad condition. Many hydrants found leaking, frozen or otherwise obsolete were replaced.
On August 18, 1955 "Diane" struck this area with full force and the resulting water damage was substantial. It was necessary to sand- bag the Reservoir in order to hold back the water. The Boston and Maine Railroad Tracks were inundated, and it became necessary to sandbag the area at Mill Lane and Frazer Road. Working closely with the Fire Department, we pumped out 1185 buildings, both public and privately owned. Roadways were badly gutted and it was neces- sary to make temporary repairs immediately, in order that travel could be continued. At a later date permanent repairs were made to sidewalks and streets damaged.
260
ARLINGTON TOWN REPORT
The Department serviced and repaired all vehicles owned by the Town with the exception of Fire apparatus. This, without question, saved considerable sums due to our nominal charges for labor per- formed and our bulk purchasing of tires, parts, grease, oil and gasoline.
The following are the net expenditures made by the Department of Public Works:
General Administration
$ 65,610.43
Highway Maintenance and General, including Snow & Ice
256,571.13
Capital Outlay
26,000.93
Construction of Ways (1955)
285,995.77
Construction of Ways (1954)
6,280.68
Construction of Ways (1953)
10,445.40
Reconstruction of Streets (1955)
23,080.83
Reconstruction of Streets (1954)
52,221.81
Storm Drains
21,652.53
Sanitation Division
133,192.00
Sewer Extensions
43,608.33
Sewer Maintenance
18,850.85
Water Maintenance
130,314.20
Water - House Connections
15,998.39
Water Maintenance
Capital Outlay Meters for New Services and Re- placements
27,968.28
Water Extensions
41,164.43
Improvement of Volume and Pressure - Water System
25,256.85
Sidewalks and Edgestones
28,228.83
Sidewalks and Edgestones, Lowell Street
4,981.45
Sidewalks and Edgestones, Eastern Avenue
7,269.13
Repairs, Park Avenue Bridge
2,800.00
Adjustment of Cost of Living Compensation
107.38
Group Life Insurance for Town Employees
1,731.55
$1,229,331.18
TABLE I GENERAL ADMINISTRATION
Appropriation
$ 58,606.70
Balance brought forward
240.00
From Finance Committee Reserve Fund
200.00
Credit from Articles 20, 24, 25, 28 and 29
6,848.14
$65,894.84
(Personal Services
$58,458.64
Expenses
5,500.00
Capital Outlay -
Appropriation
1,696.20
Balance brought forward
240.00)
Expenditure (including Accounts Payable)
65,610.43
Balance, December 31, 1955
$ 284.41
Expenditure
Personal Services
$ 58,267.12
Expenses, Office Maintenance and Supplies
5,389.81
Accounts Payable
108.70
Capital Outlay
1,659.80
Accounts Payable
185.00
$65,610.43
261
DEPARTMENT OF PUBLIC WORKS
TABLE II
HIGHWAY DIVISION
Appropriation
$266,552.39
(Maintenance and General Account
$200,000.00
Credit from Articles 28 and 29 21,449.00
Snow and Ice
45,103.39)
Expenditure (Including Accounts Payable)
256,571.13
Balance, December 31, 1955
$ 9,981.26
Expenditure
*Maintenance of Highways
$ 87,719.05
** General Account
130,259.72
*** Snow and Ice Accounts Payable
37,389.56
1,202.80
$256,571.13
*Street Cleaning and Maintenance $57,337.43; Maintenance and Repair of Sidewalks $14,456.62; Maintenance and Repair of Catch Basins and Storm Drains $15,925.00.
** Automotive and Equipment Maintenance, including Accounts Payable (Automobiles, Trucks, Compressors, Mobile Shovel Unit, Power Shovel, Hydraulic Crane, Road Grader, Tractors, Rollers) $10,142.87; Tools and Equipment, including Accounts Payable $26,191.20; Town Yard and Build- ings, including Accounts Payable $19,680.04; Stock, including Accounts Pay- able $10,741.19; Street Signs, $8,207.59; Miscellaneous, including Accounts Payable (Street Lanterns, Work done for Other Departments, etc.) $23,502.36; Sick Leave, $9,470.83; Vacations and Holidays $18,392.75; Assistant Superin- tendent $476.74; Articles 28 and 29, $4,412.19.
*** Maintenance of Snow Removal Equipment, including Accounts Payable, $5,033.48; Plowing Streets, $5,128.11; Plowing Sidewalks, $1,381.33; Removal of Snow $3,514.77; Sanding, $16,598.44; Holiday, $700.35; Salt and Calcium, $5,277.84.
Note - Accounts Payable
Highway $ 958.04
Snow and Ice
244.76
$ 1,202.80
CAPITAL OUTLAY
Appropriation
$ 24,680.00
Balance brought forward
19,370.31
From Finance Committee Reserve Fund
3,100.00
47,150.31
Expenditure
26,000.93*
Balance, December 31, 1955 (Carried forward to 1956)
$ 21,149.38
*1-Wain-Roy Backhoe
$ 3,626.00
1-1/2 ton Pickup-Body Truck
1,425.00
1- Business Coupe
1,570.00
1 - Deluxe Sedan
2,048.78
1 - Electric Time Stamp
172.90
1 - Hydraulic Crane
14,850.00
1- Welding Machine
899.30
1-Thawing Burner
98.22
1-15 gal. Evenheet Wheelable Burner 120.00
2 - Gasoline Pumps
884.18
Lubricating Equipment
306.55
262
ARLINGTON TOWN REPORT
CONSTRUCTION OF WAYS (1955)
Appropriation Expenditure
$407,958.47 285,995.77
Balance, December 31, 1955 (Carried forward to 1956)
$121,962.70
Expenditure
*Arnold Street, from Dundee Road to Hibbert Street Edgehill Road, from Summer Street to Richfield Road Farrington Street, from Mystic Street to Rangeley Road *Gloucester Street from Bailey Road to Lockeland Avenue Hamlet Street, from Beacon Street to Webster Street
$ 26,127.07
13,392.97
6,413.40
8,661.95
*Lancaster Road, from Massachusetts Avenue to and including No. 65
44,453.13
8,772.30
16,572.42
60,814.03
28,524.37
*Wachusett Avenue, from Florence Avenue to Appleton Street *Westmoreland Avenue, from Lowell Street to Westminster Avenue 11,443.46
54,087.79
0
$285,995.77
*These streets constructed by Contract. All others by Department of Public Works.
All streets complete with the exception of Farrington Street and Sunnyside Avenue.
Retained percentages not paid on Contract streets.
CONSTRUCTION OF WAYS (1954)
Balance brought forward $ 92,475.47
Expenditure
6,280.68
Balance, December 31, 1955 (Carried forward to 1956)
$ 86,194.79
Expenditure
Hillcrest Street, from Fisher Road to Glenburn Road
$ 3.28
Huntington Road, from Park Avenue Extension to Wright
Street M'arion Circle, from Marion Road to its end
3.27
Marion Road, from Belknap Street to its end
440.90
Mill Brook Drive, from Mill Street to School Property Morningside Drive, from Hutchinson Road to Melvin Road
3.27
Mountain Avenue, from Overlook Road to Wheeler Lane
56.79
Pleasant View Road, from Jason Street to Hillsdale Road
3.27
Raleigh Street, from Tufts Street to Harlow Street
203.93
Walnut Terrace, from end of accepted portion to Gray Street Westmoreland Avenue, from Westminster Avenue to Crescent Hill Avenue
1,009.01
$ 6,280.68
CONSTRUCTION OF WAYS (1953)
Balance brought forward
$ 43,022.47
Expenditure
10,445.40
Balance, December 31, 1955 (Carried forward to 1956)
$ 32,577.07
6,732.88
Philips Street, from Beacon Street to Webster Street *Renfrew Street, from Hillside Avenue to Cedar Street Sunnyside Avenue, from Broadway to its end
*Williams Street, from Arnold Street to Piedmont Street Land Damages
20.67
1,810.57
2,725.72
263
DEPARTMENT OF PUBLIC WORKS
Expenditure
Blossom Street, from Newland Road to Sunset Road $ 243.50 Chatham Street, from Washington Street to Pheasant Avenue 0
Crosby Street, from Ridge Street to Columbia Road 877.51
Heard Road, from Forest Street to Wright Street 0
Morton Path, from Concord Turnpike to Spring Street 0 Mott Street, from Parker Street to Littlejohn Street Ridge Street, from Mystic Street to Pamela Drive 9,324.39
Rockmont Road, from Oakhill Drive to Richfield Road
0
$ 10,445.40
RECONSTRUCTION OF STREETS (1955)
(RELOCATION, ALTERATION AND WIDENING, CONSTRUCTION OF, SPECIFIC REPAIRS UPON AND IMPROVEMENT OF ALL OR ANY PARTS OF PAUL REVERE ROAD, FOREST STREET AND MYSTIC STREET)
Appropriation
$ 15,043.75
Received from State and County
11,233.93
From Finance Committee Reserve Fund
1,000.00
$ 27,277.68
Expenditure
23,080.83
Balance, December 31, 1955 (Carried forward to 1956)
$ 4,196.85
This expenditure covers Reconstruction of Forest Street from Summer Street to Heard Road; the Widening of Mystic Street from Winslow Street to Massachusetts Avenue; and Reconstruction of Paul Revere Road from Park Avenue to Massachusetts Avenue. The work is not completed and final payments have not been made. This work was done under Chapter 90 of the General Laws, the State contributing 50% and the County 23.01587%.
RECONSTRUCTION OF STREETS (1954) (RELOCATION, ALTERATION AND WIDENING, CONSTRUCTION OF, SPECIFIC REPAIRS UPON AND IMPROVEMENT OF ALL OR ANY PARTS OF APPLETON STREET OR FOREST STREET)
Balances brought forward
Received from State and County
$ 14,417.45 38,173.83
Expenditure
52,221.81
Balance, December 31, 1955 (Carried forward to 1956)
$ 369.47
This expenditure covers the Reconstruction of Appleton Street, from near Ortona Street to the Concord Turnpike and the Reconstruction of Forest Street from Heard Road to the Winchester line.
This work was done under Chapter 90 of the General Laws, the State contributing 50% and the County the sum of $12,000.00.
52,591.28
0
264
ARLINGTON TOWN REPORT
STORM DRAINS
Appropriation $20,000.00
Balance brought forward 23,888.80 Credit from Articles 28 & 29
1,752.00
Expenditure
21,652.53
Balance, December 31, 1955 (Carried forward to 1956)
$23,988.27
DESCRIPTION
Size of Pipe in Inches
Length in Feet
Net Cost
* Apache Trail, from Lantern Lane to
Country Club Drive
12
675
Appleton Street, at Udine Street (started in 1954)
$ 755.38
** Arnold Street, from Lanster Road to
Williams Street and from Hibbert Street to Smith Street
12
306
Browning Road, Property damage
897.01
*Columbia Road, from Crosby Street
12
163
Concord Turnpike, from Lake Street to Spy Pond (not complete) . .
365.23
** Edgehill Road, from Summer Street to Johnson Road
12
270
Hemlock Street, from Governor Road to Yerxa Road
12
324
2,300.40
Kimball Road, from Mystic Valley Park- way to Mystic Street-Relay
24
678
7,416.79
** Lancaster Road, from Woodbury Street to lot No. 165
12
54)
21
666)
24
84)
12
160)
15
158)
*** Lantern Lane, from Hutchinson Road to southwest of Apache Trail
15
190
Mill Brook Culvert (Contract Payment) *Mountain Avenue, from 240 feet north- west of Overlook Road northwesterly *** Nicod Street, from Wollaston Avenue, southeasterly
15
315
Avenue, southeasterly (Relay)
15
146
528.33
*No. Union Street, Private Lands north- westerly
8
233
Plymouth Street, Connect Town-owned Well
5
162
974.55
** Renfrew Street, Hillside Avenue south- easterly, and Cedar Avenue north- westerly
12
371
Summer Street, opposite Brookdale Road at Mill Brook Culvert
15
342
2,857.49
** Sunnyside Avenue, from Marrigan Street southerly to No. 26, and from No. 91 to No. 129
12
1,240
Water Street, from present end to Mill Brook Culvert
15
52
564.53
** Williams Street, from north of No. 33 to Rublee Street
12
881
Wollaston Avenue, Piedmont Street south- erly (Relay)
12
60
746.99
*Wollaston Avenue, Piedmont Street to northeast of Nicod Street-(Recording fee)
12
422)
18
118)
7.58
** Woodbury Street, from Lancaster Road northwesterly
24
140
*Yerxa Road, from Hemlock Street north- easterly
12
394
#General Expense
1,148.57
9,208
$21,652.53
. . . .
*Lantern Lane, from Hutchinson Road to southwest of Apache Trail
2,081.36
Nicod Street, Southeast of Wollaston
15
138
** Wachusett Avenue, from Appleton Street southerly
12
466
northerly
TABLE III
$45,640.80
265
DEPARTMENT OF PUBLIC WORKS
* Installed by Developer.
** Installed in connection with Street Construction
*** Installed by Developer and Town.
# Article 28, $153.85; Article 29, $238.49; Stock, $80.60; Tools and Equipment, $154.39; Holiday, $521.24.
TABLE IV SANITATION DIVISION
Appropriation
$109,000.00
From Finance Committee Reserve Fund
12,000.00
Credit from Articles 28 and 29
12,192.00
$133,192.00
Expenditure
133,192.00
December 31, 1955
0
Expenditure
Ashes, Paper and Rubbish
$116,901.78
Dump Maintenance, etc.
13,755.12
Article 28
839.16
Article 29
1,695.94
$133,192.00
TABLE V
Appropriation
Balance brought forward 32,854.62 Balance Special Appropriation-Extension of Sewerage System Summer Street 5,700.00
Credit from Articles 28 and 29 2,295.50
$67,850.12
Expenditure
43,608.33
Balance, December 31, 1955 (Carried forward to 1956)
DESCRIPTION
| Size of Pipe in Inches
Length in Feet
Net Cost
*** Apache Trail, entire length
8
927
$ 1,503.14
W
Appleton Street, at Wadsworth Road (started in 1954) Contract Payment Appleton Street, at Udine Street (started in 1954)
12
101
1,681.81
** Arnold Street, at Smith Street
8
34
W
*Brattle Street, present end to Woodside Lane Brattle Terrace-Install Lamphole
8
85
W
*Brattle Terrace, from present end easterly
8
75
8
262
520.40
*** Browning Road, from present end to Outlet Sewer (not complete) *Buena Vista Road, from present end to Spring Avenue
8
96
*** Country Club Drive, from Apache Trail to east of Pawnee Drive
8
201
383.17
W
Crawford Street, from present end in an easterly direction to service No. 48
8
106
1,085.78
*Dothan Street, old end northerly
8
169
W
*Harris Circle, from No. Union Street to end
8
114
W
Hemlock Street, old end to Yerxa Road
8
92
1,291.60
W
*** Homer Road, old end northerly Indian Ridge, Inspection, etc.
8
214
878.10
W
** Lancaster Road, at Woodbury Street
8
22
2,127.72
W
*** Mountain Avenue, from
Overlook Road northwesterly
8
391
W
8
42
549.60
8
245
21.92
W
8
161
192.85
W
*** Pawnee Drive, entire length ..
8
669
1,132.68
W
Pine Court, Install Lamphole
54.41
*** Ridge Street, from Pawnee Drive to Osceola Path
8
223
422.01
W
·
.
.
....
·
.. .
*** Lantern Lane, old end southerly *Lovell; Road and M'elvin Road Mountain Avenue, from Overlook Road north westerly
8
175
W
8
240
925.87
Mystic Street, easterly sidewalk to westerly sidewalk at Nos. 322-326 *Nicod Street, Wollaston Avenue, southeasterly (Inspection only)
*** Osceola Path, Ridge Street northeasterly Pamela Drive, old end southwesterly (started in 1954)
1,300.01
W
·
..
266
ARLINGTON TOWN REPORT
5,194.63
W
19.80
W
*** Browning Road, to service lots 19A and 20A
322.42
.
62.79
8
1,228
$27,000.00
SEWER EXTENSIONS
$24,241.79
TABLE V (Continued)
SEWER EXTENSIONS
Size of Pipe in Inches
Length in Feet
Net Cost
Ridge Street, from present end approximately one hundred twenty feet north of Longmeadow Road in a northerly direction, and from Moccasin Path to Oldham Road (started in 1954)
1,047.37
*Rublee Street, Wollaston Avenue southeasterly
120
*Sky Line Drive, Philemon Street northerly
8
367
8
65
910.57
Summer Street, from present end on southerly sidewalk to Lennon Road Summer Street, old end to No. 409
8
73
1,205.44
Summer Street, from present end on south side to Franklin Avenue
8
135
5,763.45
*** Sylvia Street, Udine Street northeasterly
8
385
1,194.58
8
33
8
119
1,508.04
*Yerxa Road, Hemlock Street northeasterly
398
12,308.17
#General Expense
7,567
$43,608.33
Installed by Developer.
** Installed in connection with Street Construction.
*** Installed by Developer and Town.
#Article 28, $225.19; Article 29, $304.73; Stock, $1,629.40;
Tools and Equipment, $4,521.17; Miscellaneous, $5,272.91; Holiday, $354.77.
"W" indicates Water in same trench,
DEPARTMENT OF PUBLIC WORKS
267
. .
** Williams Street, at Smith Street and Rublee Street Woodside Lane, old end northwesterly
8
268
ARLINGTON TOWN REPORT
TABLE VI SEWER MAINTENANCE DIVISION
Appropriation
$ 21,000.00 1,516.00
Credit from Article 28 and 29
22,516.00
Expenditure (including Accounts Payable)
18,850.85
Balance, December 31, 1955
$ 3,665.15
Expenditure
Resurfacing Trenches
$ 405.46
Care and Repair of Particular Sewers
3,042.29
Accounts Payable
5.16
Care, Repair, Cleaning and Flushing Mains
10,450.88
Accounts Payable
342.56
Care and Repair of Sewer Pumps
2,767.69
Tools and Equipment
1,016.89
Holidays
473.34
Articles 28 and 29
346.58
$18,850.85
269
DEPARTMENT OF PUBLIC WORKS
ARLINGTON WATER WORKS Arlington, Middlesex County, Massachusetts
Population by census of 1955, 47,148.
Date of construction low service, 1872; high service, 1894.
By whom owned, Town of Arlington.
Source of supply, Metropolitan Water System.
Consumption
1. Estimated total population at date, 47,148.
2. Estimated population on lines of pipe, 47,500.
3. Estimated population supplied, 47,500.
4. Total consumption for the year, 1,241,070,000 gallons.
5. Percentage of consumption metered, 100 %.
6. Average daily consumption, 3,400,200.
7. Gallons per day per capita, 72.
Distribution (including auxiliary supply from old Reservoir) Mains
Nine thousand, two hundred sixteen feet of new water mains were laid during the year and one thousand four hundred nineteen feet of mains were re-laid during the year and connected with the Metropolitan System. Details of regular water main construction will be found in Table VIII.
1. Kind of pipe; cast-iron, cement and transite.
2. Sizes, from 4 inch to 16 inch.
3. Extended feet during year, 9,216.
4. Number of feet renewed during year, 1,419.
5. Discontinued during year, 1,419.
6. Total now in, use, 113,554.
7. Cost of repairs per mile, $178.39.
8.
Length of pipe less than 4 inches in diameter, 0.
9. Number of hydrants added during year, 25.
10. Number of hydrants now in use, 1,205.
11. Number of stop gates added during year, 81.
12. Number of stop gates now in use, 2,791.
13. Average pressure on mains at center of Town, 110 high system, 80 low system.
Services
Two hundred fifty new services have been added during the year and two were abandoned. There are for all purposes, 4,162 on the low, 6,629 on the high, and 4 on the old reservoir system. On the Metro- politan water supply there are 79 services for municipal purposes, 37 sprinkler services, and 44 for sewer flushing purposes included in the above. On January 1, 1956, 240 services were temporarily out of use.
1. Kind of pipe: copper, cement-lined, black wrought iron and lead, 3 inch to 6 inch cast iron.
2. Sizes, 1 inch to 6 inch.
270
ARLINGTON TOWN REPORT
3. Number of service taps added during year, 250.
4. Number of services abandoned during year, 2.
5. Number of services now in use, 10,795.
6. Percentage of services metered, 100%.
Meters
Two hundred fifty meters were set during 1955 on services in- stalled in 1954-1955. The total number of meters in use, January 1, 1956 - 10,795.
TABLE VII WATER MAINTENANCE DIVISION
Appropriation 1955
$132,000.00 6,325.00
Articles #28 and #29
$138,325.00
Expenditures including Accounts Payable
130,314.20
Balance 12/31/55
$ 8,010.80
DISTRIBUTION OF EXPENDITURES
Maintenance
Expenditures
Renewal of Services & Mains
$ 4,299.64
Services-Care & Repair
37,527.31
Meters-Care, Repair and Reading 23,568.36
Shop
4,378.45
Tools & Equipment
7,501.76
Hydrants & Gates-Care & Repair
9,535.32
Mains-Care & Repair
10,411.05
Calgon Chamber
1,690.74
Reservoir and Great Meadows
1,464.93
Water Pressure Survey
647.20
*General Expense
29,289.44
$130,314.20
*Stock $10,063.86; Sick Leave $4,073.07; Holidays $2,905.35; Vacations $5,819.91; Miscellaneous $5,112.96; Article #28, $426.58; Article #29, $887.71.
EXTENSION OF SERVICES - HOUSE CONNECTIONS
Appropriation 1955
$ 14,000.00 2,000.00
From Reserve Fund
$ 16,000.0
Expenditure 1955
15,998.39
Balance 12/31/55
$ 1.61
*Bills
$ 5,354.89
Extension of Service
10,575.79
** General Expense
67.71
$ 15,998.39
*Installation on private property-reverts to Town Treasury ** Holidays $67.71.
271
DEPARTMENT OF PUBLIC WORKS
CAPITAL OUTLAY - METERS
Balance 1/1/55 $ 12,096.71
Appropriation 1955 16,800.00
28,896.71
*Expenditure 1955
27,968.28
Balance 12/31/55 $ 928.43
*Includes $11,607.20 for 1954 purchases
EMERGENCY VALVE INSERTIONS
Balance 1/1/55
$ 470.92
Expenditure 1955
000.00
Balance 12/31/55 $ 470.92
TABLE VIII
Balance 1/1/55
$10,601.13
Appropriation 1955
44,400.00
Article 28 and 29
1,768.00
$56,769.13
Expenditure 1955
41,164.43
Balance 12/31/55
$15,604.70
DESCRIPTION
Size of Pipe in Inches
Length in Feet
Hydrants
Gates
Total Cost
3 Apache Trail - entire length
S
8
921
3
2
$ 2,991.25
Appleton St. - at Homer Rd.
5 Arnold St. - at Smith St.
S
8
39
4 Brattle St. - old end to Woodside Lane
S
8
85
1
298.69
3 Brattle Terr. - old end to lot #7
S
8
67
Campbell Rd. - at Dow Ave.
S
8
440
3
3
1,267.16
Crosby St. - Hydrant Installations
S
8
166
5
1,172.36
S
8-12
99
1
1,730.25
4 Homer Rd. - old end northerly
S
8
213
1
730.48
1 Indian Ridge
S
8
1220
4
4,508.79
3 Melvin Rd. and Lovell Rd.
S
8
174
1
2
987.42
3 Mountain Ave. - old end northwesterly ....
S
8
504
1
1
2,056.94
3
Nicod St. - Wollaston Ave. southerly
S
8
240
1
2
1,191.94
3
Osceola Path - Ridge S't. northeasterly
S
8
159
2
475.76
Pamela Dr. - old end southwesterly
S
8
8
670
2
2
2,265.74
3 Ridge St. - Pawnee Dr. to Osceola Path ...
S
8
231
1
2
1,065.07
1 Ridge St. .
S
8
120
1
416.65
3 Rublee St. - Wollaston Ave. southerly
S S
8
365
1
1,491.61
3 Sky Line Dr. - Philemon St. northerly Summer St. - old end to Franklin Avenue Summer St. - old end to #409
S S
8
158
1
1,123.31
3 Sylvia St. - Udine St. northeasterly . ..
S
8
381
1
3
2,042.77
3 Sylvia St. - old end southwesterly ...
8
55
300.69
5 Wachusett Ave. - 300' so. of Appleton southerly ....
8
110
1
3
558.16
3 Country Club Dr. - Lantern Lane to Apache Trail
...
.
..
.
...
.....
3 Pawnee Dr. - entire length
S
. . .
.
8
66
922.07
Highland Ct. - Sprinkler Serv. to 905 Mass. Ave.
6
86
1
2
4 Dothan St. - old end northerly Forest St. - Gate Installations Hemlock' St. - old end to Yerxa Rd.
8
55
534.42
3 Lantern Lane - old end southwesterly
.
..
8
32
1
357.85
385.04
8
16
3
1.144.75
6
51
ARLINGTON TOWN REPORT
272
753.00
8
237.70
1
EXTENSION OF HIGH SERVICE SYSTEM
EXTENSION OF HIGH SERVICE SYSTEM TABLE VIII (Continued)
DESCRIPTION
Size of Pipe in Inches
Length in Feet
Hydrants
Gates
Total Cost
5 Williams St. - laterals 1955 constr.
S
8
105
2
5
3,040.99
Woodside Lane - old end northwesterly ..
S
8
115
1
1,974.40
S
8
394
1
25
1,923.76
TOTAL HIGH SERVICE SYSTEM
8061
24
75
$37,949.02
EXTENSION OF LOW SERVICE SYSTEM
4 Harris Circle - entire length
S
120
1
136.27
6 Oxford St. - Raleigh St. to Broadway
10
606
1
3
5 Philips St. - Webster St. to Beacon St.
8
429
TOTAL LOW SERVICE SYSTEM
1155
1
6
136.27
TOTAL EXTENDED
9216
25
81
$38,085.29
RENEWALS - HIGH SERVICE SYSTEM'
Appleton St. - Ortona St. to Udine St.
10
516
-
3
- 3,079.14
RENEWALS - LOW SERVICE SYSTEM
6 Oxford St. - Mass. Ave. to Raleigh St.
10
903
5
TOTAL RENEWALS . .
1419
8
3,079.14
TOTAL RENEWALS AND EXTENSIONS ...
10635
25
89
$ 41,164.43
1-To complete 1954 work
2-Installed under House Connections
3-Excavation and backfill by developer
4-Entire installation by developer
5-Installed by 1955 Street Construction