Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 | Part 18 | Part 19 | Part 20 | Part 21 | Part 22 | Part 23 | Part 24 | Part 25 | Part 26 | Part 27 | Part 28 | Part 29 | Part 30 | Part 31 | Part 32 | Part 33 | Part 34 | Part 35 | Part 36 | Part 37 | Part 38 | Part 39 | Part 40 | Part 41 | Part 42 | Part 43 | Part 44 | Part 45 | Part 46 | Part 47 | Part 48 | Part 49 | Part 50 | Part 51 | Part 52 | Part 53 | Part 54 | Part 55 | Part 56 | Part 57 | Part 58 | Part 59 | Part 60


It should be said that the use of concrete reservoirs, which are not buried in the earth, and which carry a considerable head of water, is of recent date. I believe, however, that with the moderate pressure which will be carried by the proposed reser- voir, with careful design and construction, it can be depended upon for successful and permanent use.


The cost of the entire high service improvements, including the piping, is given in Estimates IV and V, the former giving the cost with a steel stand pipe, and the latter with a concrete reservoir.


I7


SUMMARY.


The following is a summary of the cost of the different plans proposed :


I. The development of the Purgatory Brook source as a supplementary supply, to be used only when the Buckmaster Pond source is insuffi- cient or unsatisfactory in quality or appearance. First cost, $28,045 00


Addition to annual maintenance expenses, 2,100 00


II. The development of the Purgatory Brook source as the principal supply, holding the Buck- master Pond plant as an auxiliary only. First cost, 59,763 00


Addition to annual maintenance expenses, 3,300 00


III. Development the same as above, but with a gas producer plant instead of a steam plant for pumping. First cost, 64,363 00


Addition to annual maintenance expenses, 3,350 00


IV. High service improvements with steel stand


pipe 50 feet in diameter and 60 feet high, 22,941 00


V. High service improvements with concrete reser- voir, 29,966 00


The above estimates do not include anything for land or water damages.


Owing to the fact that there are other questions than those of engineering and economics involved, this is one of those cases where it is difficult for an engineer to make a positive recom- mendation in regard to the most desirable method of develop- ment. The development under Plan I is certainly the economic one, as it entails a first cost of but $28,000, as compared with $60,000 for Plan II, and an addition to the annual expenses of but $2, 100, as against $3,300.


From my knowledge of Buckmaster Pond, gained only by


IS


recent studies made in the preparation of this report, I believe that that supply can generally be used with satisfaction. There will no doubt be times when vegetable growths, that occur occa- sionally in all surface waters, may render the water unattractive and unpalatable. At such times, and at other times when the supply is short, the water can be pumped from the new source. I believe that the water of Buckmaster Pond is perfectly safe from a sanitary standpoint. It may be, however, that after the consumers have used the well water for a time, the return to the use of the other supply will cause dissatisfaction and complaint, and an insistent demand that the supply be taken entirely from the well system. There is nothing to prevent doing this under Plan I. It would, however, increase the annual cost of fuel from $500 to $1,000, and, as respects annual expenses, very materially reduce the economic advantage which this plan has over Plan II. It would, however, under this condition, still be a less expensive plan.


If, as has been suggested as possible, the town should at some time install a municipal electric lighting plant, the machin- ery in Plan I could be adapted for driving by electricity, by simply installing a motor connected to the pump shaft, and, perhaps, in this way reduce the pumping expenses. There is but one real advantage which Plan II has over this, and that is in case of a very large fire covering several hours, in which the water in the stand pipe would be seriously lowered, a much larger amount of water could be pumped directly into the mains than with this plan. This objection to this plan is met by the fact that the Buckmaster Pond will, under either plan, be kept ready to run at all times, and can be started within an hour. In the meantime the reservoir or stand pipe will furnish sufficient water without serious loss of head, the pump at the wells supply- ing water for two fire streams.


Otherwise than this, Plan I will give as good service in every way as Plan II. If it is believed, however, that the water will all, or most of it, be taken from the new source, I am of


.


19


the opinion that the piping through Ellis avenue and Washing- ton street should be of the same size as recommended under Plan II. This will provide an ample pipe capacity for any additions which may be made to the plant, at an additional cost of $5,000, making a total cost of about $33,000.


I believe, it may fairly be said, that Plan I will furnish a satisfactory service entirely from the new source, if desirable, provide for the economic installment of any necessary additions to itself, as consumption increases, that within about ten years another pumping unit and more wells must be put in at a further cost of about $8,000 (the building will be built of proper size for the second pump), at a present cost of $33,000, and that Plan II will provide for all needs for the next twenty or twenty- five years, and at the end of that time can be increased by the addition of more wells, and perhaps a second pump to avoid the necessity of running more than ten hours per day, at a present cost of about $60,000.


When I say that I am inclined to advise the less expensive plan on the principle that, when there is reasonable doubt, it is better to adopt the plan involving the least expenditure, I have perhaps done all that an engineer can to aid you in your decision of a matter .in which other than engineering questions are in- volved.


As regards the high service improvements, either Plan IV or V will be satisfactory, but I recommend the plan with the steel stand pipe, on the ground of a lower expenditure and lack of experience with concrete structures of that type.


If Plan I and Plan IV are adopted, the total cost (exclusive of land and water damages), will be about $51,000, or, if the larger piping is laid, $56,000.


If Plan II and Plan IV are adopted, the total cost (exclusive of land and water damages), will be about $82,700.


Respectfully submitted,


FREEMAN C. COFFIN.


I


20


ESTIMATE I.


ESTIMATE OF COST OF DEVELOPMENT OF PURGATORY BROOK SOURCE AS A SUPPLEMENTARY SUPPLY.


Driven well system, $7,082 00


Pumping station, 3,000 00


Pumping machinery, 6,000 00 °


Ellis avenue, 10" pipe from Pumping station to Washington street, 3,595 00


Washington street, 10" pipe from Ellis avenue to end of S" pipe, 4,719 00


$24,396 00


Add 15 per cent. for engineering and contin- gencies, 3,659 00


$28,045 00


ESTIMATE OF ANNUAL COST OF MAINTENANCE OF ABOVE PLANT IN EXCESS OF PRESENT EXPENSES.


Interest at 4 per cent. on $28,045, $1,121 80


Depreciation at 1 1-2 per cent. on $28,045, 420 67


Fuel,


400 00


Supplies and repairs,


150 00


No increase in cost of attendance,


000 00


$2,092 47


The above estimate is based upon the use of fuel oil. If gasolene is used, it would be increased about $375 per year.


21


ESTIMATE II.


ESTIMATE OF COST OF DEVELOPMENT OF THE PURGATORY BROOK SOURCE AS A MAIN SUPPLY WITH STEAM PUMPS.


Driven well system, $12,074 00


Pumping station, 8,000 00


Boilers, 2,000 00


Pumping machinery,


10,000 00


Ellis avenue, 14" pipe from Pumping station to Washington street, 5,570 00


Washington street, 14" pipe from Ellis avenue to Prospect street, 5,786 00


Washington street, 12" pipe from Prospect street to end of 8" pipe, 1,310 00


Prospect street, 10" pipe from Washington to Casey street, 4,952 00


Prospect street, 6" pipe from Nahatan to Prospect avenue, 1,838 00


Casey street, from end of present 6" pipe to Prospect street, 438 00


$51,968 00 Add 15 per cent. for engineering and contin- gencies, 7,795 00


$59,763 00


ESTIMATE OF ANNUAL COST OF MAINTENANCE OF ABOVE PLANT IN EXCESS OF PRESENT EXPENSES.


Interest at 4 per cent. on $59,763, $2,390 52


Depreciation at 1 1-2 per cent. on $59,763, 896 44


240 tons coal at $5, 1,200 00


Amount carried forward, $4,486 96


22


Amount brought forward, $4,486 96 Supplies and repairs, 300 00


No increase in attendance,


000 00


$4,786 96


Deduct cost of coal under present conditions, 300 tons at $5, 1,500 00


Net increase in expenses,


$3,286 96


ESTIMATE III.


COST OF DEVELOPMENT OF THE PURGATORY BROOK SOURCE AS A MAIN SUPPLY, USING A GAS PRODUCER PLANT FOR POWER.


Driven well system, $12,074 00


Pumping station, 6,000 00 18,000 00


Pumping machinery,


Ellis avenue, 14" pipe from pumping station to Washington street, 5,570 00


Washington street, 14" pipe from Ellis avenue to end of S" pipe, 5,786 00


Washington street, 12" pipe from Prospect street to end of S" pipe, 1,310 00


Prospect street, 10" pipe from Washington to Casey street, 4,952 00


Prospect street, pipe from Nahatan to Prospect avenue, 1,838 00


Casey street, Prospect street to end of pipe, 438 00


$55,968 00 Add 15 per cent. for engineering and contin- gencies, 8,395 00


$64,363 00


23


ESTIMATE OF ANNUAL COST OF MAINTENANCE OF ABOVE PLANT IN EXCESS OF PRESENT EXPENSES.


Interest at 4 per cent. on $64,363, $2,574 52


Depreciation at 1 1-2 per cent. on $64,363, 965 44


200 tons coal at $5, 1,000 00


Supplies and repairs,


300 00


Attendance no increase in cost,


000 00


$4,839 96


Deduct cost of coal under present conditions, 300 tons


at $5, 1,500 00


Net increase in expenses,


$3,339 96


ESTIMATE IV.


COST OF HIGII SERVICE IMPROVEMENT WITH STEEL STAND PIPE 50 FEET IN DIAMETER.


Stand pipe, fountain and roof, $16,800 00


6-inch pipe line on Prospect street, from Prospect avenue to Nahatan street, 1,838 00


6-inch pipe line on Casey street, 438 00


6-inch pipe line on Nichols street, 348 00


6-inch pipe line connecting Howard and Myrtle streets, 525 00


$19,949 00 Add 15 per cent. for engineering and contin- gencies, 2,992 00


$22,941 00


24


ESTIMATE V.


COST OF HIGH SERVICE IMPROVEMENTS WITH CONCRETE COVERED RESERVOIR 50 FEET IN DIAMETER.


Reservoir complete, $20,300 00 6-inch pipe line in Prospect street, from Prospect avenue to Nahatan street, I,838 00


6-inch pipe line in Casey street, 438 00


6-inch pipe line in Nichols street, 348 00


6-inch pipe line connecting Howard and Myrtle streets, 525 00


$23,449 00


Add 15 per cent. for engineering and contin- gencies, 3,517 00


$26,966 00


34TH ANNUAL REPORT OF THE


TOWN OFFICERS


OF THE


TOWN OF NORWOOD


FOR THE


YEAR ENDING JANUARY 31,


1906.


TOGETHER WITH THE


Reports of the School Committee and Water Commissioners.


ALSO Abstracts from Records of Town Meetings.


AMBROSE BROS., PRINTERS, NORWOOD. 1906.


TOWN OFFICERS FOR 1905-1906.


SELECTMEN, ASSESSORS, OVERSEERS OF THE POOR AND SURVEYORS OF HIGHWAYS.


FRED L. FISHER, Chairman. RICHARD E. OLDHAM, Clerk. SAMUAL M. WINSLOW.


TOWN CLERK. JOHN F. KILEY.


TOWN TREASURER. CHARLES T. WHEELOCK.


COLLECTOR OF TAXES. EDGAR F. ROBY.


SCHOOL COMMITTEE.


MRS. MARY J. ALDEN, CLIFFORD B. SANBORN,


GEORGE HARDING SMITH, CORNELIUS M. CALLAHAN, EDWARD W. JEWETT, HARRIETT LANE,


Term expires March, 1906.


1906.


1907.


1907.


66


1908.


66


66


1 908.


4


BOARD OF HEALTH.


FRED E. COLBURN, WILLIAM FISHER, H. LEON STEELE,


Term expires March, 1906.


66


1907.


66 1908.


PARK COMMISSIONERS.


F. S. ELLIS. GEORGE CORBETT. AUSTIN PRATT.


WATER COMMISSIONERS.


WILLIAM F. BAKER, Term expires March, 1906.


JAMES H. BUTLER, 66


1907.


JOHN F. CALLAHAN, 66 66 66 1908.


REGISTRARS OF VOTERS.


AUSTIN E. PRATT. JOHN P. OLDHAM. JOHN P. CURRAN. JOHN F. KILEY.


AUDITORS.


FRANCIS J. SQUIRES.


JAMES E. PENDERGAST.


ELTON O. CLARK.


1


CEMETERY COMMISSIONERS.


W. ALLEN TALBOT. WILLIAM FISHER. EDWARD B. PENDERGAST.


POLICE. WARREN E. RHOADS, Chief. MICHAEL D. CREED, Night Officer.


5


CONSTABLES.


WARREN E. RHOADS.


WALTER A. READEL.


PATRICK CONNOR.


MICHAEL D. CREED. SIMON P. DONNELLY. HARRY J. CORBETT.


TRUSTEES OF PUBLIC LIBRARY.


MARTHA B. PARKER, Term expires March, 1906.


LEWIS H. PLIMPTON,


1906.


WILLIAM T. WHEDON,


1907.


MRS. MARIA E. COLBURN,


1907.


REV. J. B. TROY,


1908.


IRVING S. FOGG,


66


1908.


SURVEYORS OF LUMBER.


H. FRANK WALKER. WALTER S. PHALEN. MILTON H. HOWARD.


MEASURERS OF WOOD AND BARK.


MARCUS M. ALDEN. DANIEL E. CALLAHAN. EUGENE M. MURPHY.


PUBLIC WEIGHERS.


JOHN CONLEY.


GEORGE H. MORRILL, JR.


L. H. BEAVER. L. N. NEWMAN. A. J. ROBERTSON. .


SUPERINTENDENT OF STREETS. FRED H. HARTSHORN.


6


ENGINEERS OF THE FIRE DEPARTMENT. J. FRED BOYDEN, Chief. H. FRANK WALKER, Clerk. FRANK W. TALBOT.


FIELD DRIVER. WALTER HOBSON.


POUND KEEPER. C. C. CRANE.


TREE WARDEN. FRANK H. WINSLOW.


TRUANT OFFICER. MICHAEL D. CREED.


SEALER OF WEIGHTS AND MEASURES. WARREN E. RHOADS.


INSPECTOR OF PROVISIONS AND CATTLE. JAMES J. MULVEHILL.


INSPECTOR OF FRUIT AND PRODUCE. WARREN E. RHOADS.


7


FENCE VIEWERS.


SUMNER BAGLEY. AUSTIN E. PRATT. WILLIAM FISHER.


1


APPROPRIATIONS, 1905.


Morrill Memorial Library, $2,600 00


George K. Bird Post, No. 169, G. A. R., 200 00


Fire Department, 3,350 00


Fire Alarm System, 400 00


Watering streets,


1,200 00


Lighting streets,


4,200 00


Support of schools,


38,100 00


Conveying children from outlying districts,


750 00


Truant school,


50 00


Board of Health,


600 00


Care of shade trees,


300 00


Illegal sale of liquor,


400 00


Sidewalks,


1,000 00


Setting street bounds and laying out street, 300 00


Removing snow,


1,500 00


State aid,


Soo oo


Military aid,


500 00


Soldiers' relief,


500 00


Fees in District Court,


100 00


Care of Old Cemetery,


125 00


Police,


3,500 00


Selectmen and Assessors,


1,500 00


Treasurer, 400 00


Tax Collector,


500 00


Amount carried forward, $62,875 00


9


Amount brought forward, $62,875 00


Town Clerk,


$200 00


Superintendent of Streets,


1,100 00


Water Commissioners,


300 00


Board of Health,


150 00


Auditors,


45 00


Cattle Inspector,


100 00


Town Physician,


100 00


Sealer of Weights and Measures,


100 00


Election Officers,


130 00


Registrars of Voters, 125 00


Repairs of highways (at April meeting)


6,000 00


Repairs of highways (at March meeting) 2,000 00


Repairs of highways (also excise tax)


Building sidewalks and setting edge


stones, 1,000 00


Paving gutters,


500 00


Sanding sidewalks,


300 00


Street signs,


100 00


Town Treasurer and Tax Collector (bonds)


150 00


Band concerts,


500 00


Snow plows,


150 00


Philbrick street, to gravel,


450 00


Wilson street, to gravel,


700 00


Fulton street, sidewalks between Myrtle street and Railroad avenue,


200 00


Drain from George and Washington streets, 900 00


Fire alarm box,


60 00


Land for Fire Department and town purposes, 4,000 00


Drinking fountain, 350 00


19,710 00


Total,


$82,585 00


IO


MONEY VOTED IN 1904 TO BE RAISED BY TAX IN 1905.


Public band concerts, $500 00


Clark street extension, 150 00


Winslow avenue, 500 00


Rock street,


2,700 00


Total,


$3,850 00


TO BE PAID FROM UNEXPENDED BALANCE IN TREASURY.


For cemetery note, due December 1, 1905, $2,000 00


Interest on cemetery loan ($4,000), 132 00


E. J. Shattuck school note, due Decem- ber 15, 1905, 2,600 00


Interest on E. J. Shattuck school loan, 1,008 00


Interest on band concert note, due De- cember 1, 1905, 17 50


Interest on Clark street note, due Decem- ber, 1905, 5 15


Interest on Winslow avenue note, due


December 1, 1905, 17 50


Interest on Rock street note, due Decem- ber 1, 1905, 94 50


Support of poor, 4,800 00


Incidentals, 2,200 00


Printing and stationery, 1,600 00


Abatement of taxes,


1,000 00 .


Total,


$15,474 75


TO BE PAID FROM WATER COMMISSIONERS' TREASURY.


Interest on water bonds,


$3,160 00


Sinking fund, 4,200 00


Amount carried forward,


$7,360 00


II


Amount brought forward, $7,360 00 of pumping plant, $210 00


Interest on notes ($6000) for extention


Note for same due December 1, 1905, 1,000 00


Water mains on Mylod street from end of pipe to house of Daniel Dyer, 375 00


1,585 00


Total,


$8,945 00


APPROPRIATIONS FROM WATER COMMISSIONERS TREASURY.


Water mains on Green street, $700 00


Water mains on Bond street, 1,000 00


Water mains on Fulton street,


300 00


Water mains on Savin avenue,


500 00


Water mains on Everett avenue, 200 00 -


Water mains on Johnson court, 125 00


Testing for water, 1,000 00


Total, $3,825 00


APPROPRIATIONS TO BE RAISED BY TAX IN 1906.


To gravel extension of Savin avenue, $150 00


To grade gravel and pay land damage Mylod street, 600 00


To grade and gravel Lincoln street,


500 00


To grade Morse Common, 200 00


To gravel Everett Avenue,


300 00


Total, $1750 00


Appropriation under Article seventeen of the June meeting, 1905 for the use of committee to in- vestigate town drain, $500 00


12


EXCISE TAX.


Excise tax from street railway companys, to be expended on sidewalks, $


APPROPRIATIONS FROM MONEY IN THE TREASURY.


Morrill Memorial Library, dog tax, $600 77


Appropriation for replacing lead service pipes to be raised by notes of the town payable one thousand in 1906, one thousand in 1907, one thousand in 1908, said notes to be payable from the Water Commissioners' treasury, $3000 00


13


VALUATION AND TAX, MAY 1, 1905.


Total number of Polls,


2,070


Tax on Polls,


$4,140 00


Value of Personal Estate,


$1,167,405 00


Tax on Personal Estate,


20,312 84


Value of Real Estate,


4,254,265 00


Tax on Real Estate,


74,024 21


Total Valuation,


$5,421,670 00


Total Tax,


$98,477 05


Rate of Taxation,


$17.40 per $1,000.


Town Grants, raised by tax,


$86,435 00


State Tax,


6,480 00


County Tax,


5,219 25


State Highway Tax,


96 38


Overlays,


246 42


Total Commitment,


$98,477 05


REPORT OF SELECTMEN.


SCHOOLS.


PAYMENT OF TEACHERS. HIGH SCHOOL.


Paid Nathaniel A. Cutler, for teaching, $1,500 00


Ella A. Newhall,


66


750 00


Elzura A. Chandler,


350 00


Theodora M. Hastings, "


725 00


Leon A. Winslow,


66


450 00


I. Maud Warren,


66


332 50


Lottie M. Draper,


66


276 25


W. B. Truesdale,


66


66


135 00


Irene Van Kleeck,


66


66


450 00


Linda M. Lowell,


66


275 00


Alice G. Smith,


66


300 00


Joseph E. Goodrich,


66


308 75


$5,852 50


EVERETT SCHOOL.


Paid Mary S. Fellows,


for teaching,


$760 00


Julia R. O'Brien,


596 00


Estelle Gilmore,


66


66


548 00


Willa H. Ferguson,


66


275 00


S. Louise Rhodes,


66


600 00


Lillian E. Moore,


66


66


235 50


E. Mabel Cobb,


250 00


Joanna D. Croft,


66


237 50


Mary L. Kimball,


66


242 00


3,744 00


Amount carried forward,


$9,596 50


1


15


Amount brought forward, $9,596 50


GUILD SCHOOL.


Paid Katharine L. Carbee, for teaching,


$798 00


Una E. Howes,


66


482 50


Julia A. Danahy, 66


487 50


Grace L. Newton,


500 00


Georgia E. Hartford, 66


463 75


Helen M. Tilden,


525 00


Kathryn A. Turner,


462 50


Lilla F. Bateman,


66


499 00


M. Agnes Murphy,


66


498 00


Estelle Mahoney,


548 00


Lillian G. Duncan,


66


525 00


E. Louise Ward,


525 00


Marguerita E. Burns,


429 00


6,743 25


SHATTUCK SCHOOL.


Paid Ruphelle Luce,


for teaching,


$744 00


Annie E. Fales,


500 17


Lizzie E. Hadley,


66


66


550 00


Florence Hill,


66


500 00 :


Alma L. Arnold,


66


512 50


Ellen Colbath,


66


66


467 00


Maud A. Woods,


6 6


489 00


Emma F. Niles,


437 50


4,200 17


1


EAST SCHOOL.


Paid Georgietta Bacon, for teaching, $462 50


Martha B. Parker,


6 500 00


962 50


Amount carried forward,


$21,502 42


.


7


16


Amount brought forward,


$21,502 42


WEST SCHOOL.


Paid Emma A. Mansfield, for teaching, $487 50 Elizabeth R. Bishop, 500 00


987 50


BALCH SCHOOL.


Paid Minnie H. Churchill, for teaching, $500 00


A. Agnes Curtin, 66


442 00


942 00


SUBSTITUTE TEACHERS.


Paid Mrs. Edwin Reynolds, for teaching, $5 00


Ellen M. Jensen,


4 00


Gertrude E. Harris, 66


10 00


Millie L. Dunbar,


66


23 00


Grace L. Pomeroy,


4 00


Marie E. Lindenberg,


2 00


Mary G. Felker, 66


36 00


Annabel F. Forbes, 66


6 00


Margaret F. McCarthy, "


66


40 00


Margaret A. Sullivan, "


66


13 50


143.50


$23,575 42


DRAWING TEACHER.


Paid Bessie M. Parker, for teaching,


$525 00


MUSIC TEACHER.


Paid B. Harold Hamblin, for teaching,


$500 00


SEWING TEACHER.


Paid Mary A. McClearn, for teaching, $200 00


I7


SUPERINTENDENT.


Paid William C. Hobbs, as superintendent, $1,883 33


.


JANITORS AND SWEEPERS.


Paid Adna W. Alden, as janitor,


$So0 00


John P. Oldham,


775 00


Hiram Whitney,


500 00


Michael Dyer,


100 00


Enos Lane,


50 00


John G. Readel,


50 00


William Shyne,


100 00


Mrs. Enos Lane,


for cleaning,


60 35


Mary Fitzgerald,


53 00


Mary Ryan,


69 00


Mrs. Joseph Donahue,


66


8 00


Mrs. J. Conroy,


7 00


Mrs. Mary Lamb,


66


14 75


Mrs. T. Hefferan,


8 00


Mrs. D. Hayes,


8 00


Mrs. J. Scott,


8 00


Mrs. M. Drummey,


8 00


Mrs. T. Costello,


8 00


Mrs. C. Readel, 66


6 00


Mrs. Mary Conlon


I 20


$2,634 30


TRUANT OFFICER.


Paid Michael D. Creed, as truant officer,


$100 00


HEATING AND LIGHTING.


Paid Beaver & Cain Co., for coal,


$2,804 94


Norwood Gas Light Co., for gas,


38 36


$2,843 30


18


SCHOOL BOOKS AND SUPPLIES.


Paid Ginn & Co., for books and supplies, $117 49


Jordan Marsh Co., for books and supplies, II 86


Holt & Co., for books and supplies, 26 04


D. C. Heath & Co., for books and supplies, E. E. Babb & Co., for books and supplies,


171 20


Adams, Cushing, & Foster, for supplies,


232 46


L. E. Knott Apparatus Co., for supplies,


134 52


Smith Premier Typewriter Co., for supplies,


7 00


Wadsworth, Howland & Co., for supplies,


54 92


J. L. Hammett Co., for supplies,


3 75


Remington Typewriter Co., for supplies,


60 00


F. J. Barnard & Co., for supplies, 165 25


Kenney Bros. & Wolkins, for supplies, 71 53


Suffolk Ink Co., for supplies, 5 25


American School Furniture Co., for supplies,


14 10


P. B. Thompson, for supplies,


I 00


Hobbs & Warren Co., for supplies,


9 00


B. H. Sanborn & Co., for books and supplies, 429 71 American Book Co., for books and supplies, S5 76


Schænhof Book Co., for books and supplies,


92


Oliver Ditson Co., for books and supplies,


II II


Boston Music Co., for books and supplies, 16 10


Silver, Burdett & Co., for books and supplies, 96 47 Atkinson, Mentzner & Grover, for books and supplies, 106 5S


42


Chas. Scribner's Sons, for books and supplies, Houghton, Mifflin & Co., for books and supplies, 5 61


W. B. Clarke Co., for books and supplies, II 40


Practical Text Book Co., for books and supplies, 4I 53


Amount carried forward, $2,387 22


496 24


19


Amount brought forward, $2,387 22


Paid Mckinley Publishing Co., for books and supplies, 4 50


Rand, McNally & Co., for books and supplies, 182 00


$2,573 72


INCIDENTALS AND REPAIRS.


Paid Smith & Anthony Co., for supplies,


$642 20


Winchester Disinfectant Co., for supplies,


42 15


Spear & Smith, for labor,


102 08


Adams Express Co., for expressage,


10 30


Fred Andrews, for labor,


122 98


Geo. F. Bagley, for labor,


90 92


Ambrose Bros.,


59 00


A. T. Harriott, for labor,


6 00


John Hogan, for labor,


3 00


F. H. Dean, for labor,


131 20


Andrew Abbt, for labor,


360 50


George Taylor, for labor,


2 75


Lucius B. White, for labor,


3 50


John McKinnon, for labor,


172 47


Geo. A. Rafuse, for labor,


212 80


Henry W. Stone, for labor,


17 80


Fred A. Hartshorn, for labor,


7 17


Wm. Foreman, for labor,


26 45


M. D. Creed, for labor,


47 00


M. H. Howard, for labor,


3 17


C. E. Smeltzer, for labor,


5 40


A. L. Ide, for labor,


5 00


John Farquhar's Sons, for labor,


54 OI


Fred E. Colburn, for labor,


3º3 43


Mary B. Smith, for labor,


3 33


E. B. Thorndike, for supplies,


1 00


Amount carried forward,


$2,435 61


20


Amount brought forward,


$2,435 61


Paid H. L. Boyden, for supplies, 10 83


Clark's Grocery, for supplies, 4 33


Macey-Wernicke Co., for supplies,


8 50


Boston Regalia Co., for supplies,


12 50


Boston Bank Note Co., for supplies,


26 50


Kenny Bros. & Wolkins, for supplies, 50 00


Henry Krey Co., for supplies, 5 68


C. H. Carter, for supplies,. 16 93


L: W. Bigelow's Sons, for supplies,


6 93


Geo. E Sanborn, for supplies.


17 61


H. E. Rice & Co., for supplies, 4 05


American School Furniture Co., for supplies,


14 00


Norwood Furniture Co., for supplies, 40 50


Jordan Marsh Co., for supplies,


I 00


Holden Book Cover Co., for supplies,


4 25


Hayden & Co., for supplies,


3 92


J. E. Plimpton, & Co., for supplies,


+ 48


Pendergast & Callahan, for supplies,


IO 41


N. E. Telephone & Telegraph Co., telephone,


48 39


W. D. Huntoon & Co., for labor and supplies,


35 22


H. F. Walker, for labor and supplies,


65 28


Chas. W. Percy, for labor and supplies,


119 04


Grace L. Newton, for expense,


2 15


Wm. C. Hobbs, for expense,


17 35


Agnes Curtin, for expense,


25 00


Minnie H. Churchill, for expense,


25 00


G. E. M. Dickinson, for music,


30 00


Trustees Orient Lodge, for liall rent,


46 00


John H. Kazar, boiler inspection,


35 00


Peterson's express, expressing,


I 50


Highway department, for labor,


56 75


Water department, water rates,


118 75


Richard Walsh, for supplies,


3 23


$3,304 94


1


2I


RECAPITULATION.


Total payment of teachers,


$26,683 75


Janitors and sweepers, 2,634 30


Truant officer,


100 00


Heating and lighting,


2,843 30


School books and supplies, 2$573 72


Incidentals and repairs,


3,304 94


$38,140 01


Appropriation, $38,100 00


SCHOOL TICKETS.


Paid Norwood, Canton and Sharon Street R. R., $67 50


Old Colony Street R. R., 4.00 00


Norfolk & Bristol Street R. R.,


160 00


Waldo C. Hoar, for conveyance,


37 50


$665 00


Appropriation, $750 00.


INSURANCE ACCOUNT.


Paid H. W. Gay, for insurance, Guild school, $20 00


H. W. Gay, for insurance, Everett school, 26 00


H. W. Gay, for insurance, High school, 24 00


F. A. Morrill, for insurance, Everett school, 38 40


F. A. Morrill, for insurance, water plant, 15 47


F. A. Morrill, for insurance, North school, 33 18


F. A. Morrill, for insurance, Guild school, 20 00


F. A. Morrill, for insurance, Engine House No. 1, 35 00


F. A. Morrill, for insurance, for water plant, 6 15


F. A. Morrill, for insurance, East school, 20 00


F. A. Morrill, for insurance, Policy 1049, I 48


$169 68


No appropriation.


-


22


ENGINE HOUSE LAND, MARKET STREET.


Paid Winslow Bros. & Smith, for land, C. M. Callahan, for services,