** Plowing Streets and Sidewalks, including Accounts Payable, $39,717.89; Removal of Snow and Ice, including Accounts Payable, $37,913.86; Sand and Salt Streets and Walks, including Accounts Payable, $75,291.78; Holi- days and Miscellaneous, $6,613.08; Maintenance of Snow Equipment and Supplies, including Accounts Payable, $33,435.15.


Notes:


Labor


Expenses


Accounts Payable


Totals


Highway


$252,652.27


$ 29,492.10


$ 8,849.65


$290,994.02


Snow and Ice Removal


83,203.09


68,988.59


7,344.93


159,536.61


Maintenance of Snow


Removal Equipment and Supplies


14,835.41


16,991.53


1,608.21


33,435.15


$350,690.77


$115,472.22


$17,802.79


$483,965.78


CAPITAL OUTLAY


Appropriation


$ 59,220.00


Balance brought forward .


738.08


Transfer from Finance Committee


9,600.00


$ 69,558.08


251


DEPARTMENT OF PUBLIC WORKS


Expenditure.


Balance, December 31, 1963. (Carried forward to 1964)


$ 66,948.92 $ 2,609.16


Expenditure


3 - 30,000 lb. Trucks with Contractor's Bodies


$ 23,158.00


1 - 1/2 ton Pickup Truck


1,604.21


1 - 4 door Sedan. .


2,629.00


- Station Wagon


2,294.10


1 - Flexible Truck Loader Power Bucket


2,181.21


1 - Flexible Seweroder


4,059.50


1


- Hydraulic Shop Press.


671.30


1 - Portable Skid-mounted Compressor


1,300.00


1 - 3/4 yd. Clamshell Bucket


1,475.00


2 - Sidewalk Tractors with V blades


10,500.00


4 - Plow Blades and Frames


2,704.00


2 - Sanding Bodies


4,772.60


3 - Used Walters Snow Fighters and Parts


9,600.00


$ 66,948.92


MAINTENANCE OF PUBLIC SIDEWALKS (Reconstruction and Maintenance of Permanent Sidewalks and Resetting of Edgestones upon the Public Ways of the Town) Article 33-1963


Appropriation


$ 20,000.00


Balance brought forward


3,349.77


Credit from Article 6


723.00


$ 24,072.77


Expenditure.


24,072.77


December 31, 1963


.00


CONSTRUCTION OF WAYS (1963) (Article 47)


Appropriation


$130,298.00


Expenditure. .


109,851.55


Balance, December 31, 1963.


$ 20,446.45


(Carried forward to 1964)


Expenditure


** Acton Street, from present end to Appleton Place


$ 13,140.95


*Day Street, from Rhinecliff Street to Property Line .


12,942.31


*Dothan Street, from Thesda Street to the Winchester Line.


21,706.07


*Hillside Avenue, from George Street to Rhinecliff Street. . .


5,530.72


*Lehigh Street, from Quincy Street to Park Property.


7,475.24


*Lorne Road, from Sutherland Road to its end . 11,020.20


** Pheasant Avenue, from present end to Dickson Avenue . . 27,605.83


*Thesda Street, from Wright Street to Dothan Street


10,430.23


$109,851.55


*Constructed by Department of Public Works


** Constructed by Contract


'Constructed by Contract - Final payment not made on this street.


252


ARLINGTON TOWN REPORT


CONSTRUCTION OF WAYS (1963)


(Article 59)


Appropriation


$ 7,650.00


Expenditure.


5,550.28


Balance, December 31, 1963. (Carried forward to 1964)


$ 2,099.72


Expenditure


Baker Road, from Stowecroft Road to its end. . Greenwood Road, from Ridge Street to Winchester Road .


56.07


Hancock Street, from Forest Street to Hancock Street. . Hemlock Street, from Dickson Avenue to Fabyan Street. . Mountain Avenue, from Overlook Road to Washington Street. Ridge Street, from Morningside Drive to Stone Road. Stone Road, from No. 32 to No. 55.


72.43


51.99


751.57


65.58


734.32


Wilbur Avenue, from Wollaston Avenue northwesterly to Private Way.


56.02


Winchester Road, from Ridge Street to Greenwood Road Wollaston Avenue, from north of Nicod Street to Wilbur Avenue


56.02


$ 5,550.28


These streets were constructed by Developers and accepted by the Town with the above expenditures.


CONSTRUCTION OF WAYS (1962)


(Article 42)


$ 30,129.95


Returned to Treasury


14,698.33


Expenditure. .


5,575.86


Balance, December 31, 1963.


$ 9,855.76


CONSTRUCTION OF WAYS (1962)


(Article 61)


Balance brought forward


$ 2,620.68


Expenditure. .


32.36


Balance, December 31, 1963.


$ 2,588.32


(Carried forward to 1964)


CONSTRUCTION OF WAYS (1961)


(Article 41)


Balance brought forward


4,742.22


Expenditure.


318.44


Balance, December 31, 1963.


(Carried forward to 1964) $ 4,681.56


$ 9,742.22


Returned to Treasury


5,000.00


Balance brought forward


15,431.62


(Carried forward to 1964)


$ 502.65


3,203.63


253


DEPARTMENT OF PUBLIC WORKS


CONSTRUCTION OF WAYS (1961) (Article 54)


Balance brought forward $ 6,661.58


Returned to Treasury 1,661.58


5,000.00


Expenditure. .


299.52


Balance, December 31, 1963. (Carried forward to 1964)


$ 4,700.48


RECONSTRUCTION OF CERTAIN STREETS CHAPTER 90 - 1963 (Article 35 - 1963)


(RELOCATION, ALTERATION, AND WIDENING, CONSTRUCTION OF, SPECIFIC REPAIRS UPON AND IMPROVEMENTS OF ALL OR ANY PARTS OF CHESTNUT STREET, GROVE STREET, MYSTIC STREET AND SUMMER STREET)


Appropriation


Expenditure.


$ 56,200.00 0


Balance, December 31, 1963.


$ 56,200.00


(Carried forward to 1964)


RECONSTRUCTION OF CERTAIN STREETS CHAPTER 782 - 1963 (Article 36 - 1963)


(RECONSTRUCTION OF ANY OR ALL PARTS OF THE FOLLOWING STREETS OR WAYS: BROOKS AVE., CLAREMONT AVENUE, HERBERT ROAD, HILLSIDE AVENUE, MILL STREET, PARK AVENUE EXT., THORNDIKE STREET, AND VARNUM STREET)


Appropriation Expenditure.


$ 55,000.00 38,105.12


Balance, December 31, 1963.


$ 16,894.88


(Carried forward to 1964)


RECONSTRUCTION OF CERTAIN STREETS CHAPTER 90 - 1962 (Article 40 - 1962)


(RELOCATION, ALTERATION, AND WIDENING, CONSTRUCTION OF, SPECIFIC REPAIRS UPON AND IMPROVEMENTS OF ALL OR ANY PARTS OF MASSACHUSETTS AVENUE AND SPRING STREET)


Balance brought forward . $ 26,975.00


Received from State and County 48,502.54


75,477.54


Expenditure.


62,821.21


Balance, December 31, 1963. (Carried forward to 1964)


$ 12,656.33


254


ARLINGTON TOWN REPORT


RECONSTRUCTION OF CERTAIN STREETS CHAPTER 90 - 1961 (Article 29 - 1961)


(RELOCATION, ALTERATION, AND WIDENING, CONSTRUCTION OF, SPECIFIC REPAIRS UPON AND IMPROVEMENTS OF ALL OR ANY PARTS OF MASSACHUSETTS AVENUE, MYSTIC STREET, PARK AVENUE AND WARREN STREET)


Balance brought forward .


$ 212.55


Received from State and County


7,641.43


7,853.98


Expenditure.


7,853.98


December 31, 1963 .


.00


SERVICE ROADWAY SPY POND FIELD (Article 29 - 1960)


(CONSTRUCT A PERMANENT SERVICE ROAD BETWEEN WELLINGTON STREET AND POND LANE ON TOWN PROPERTY KNOWN AS SPY POND FIELD)


Balance brought forward . $ 10,778.53


Returned to Town Treasury 5,778.53


5,000.00


Expenditure.


2,054.05


Balance, December 31, 1963. (Carried forward to 1964)


$ 2,945.95


TABLE III


Appropriation


$20,000.00


Balance brought forward 3,402.25


Credit from Article 6 . . 531.00


23,933.25


Expenditure


21,314.72


Balance, December 31, 1963. (Carried forward to 1964)


2,618.53


Size of Pipe in Inches


Length in Feet


Net Cost


* Acton Street, from Appleton Place southerly. . Appleton Street, Construct dry well. .


Cemetery Street, install manhole at culvert . Churchill Avenue, install box inlet from inlet to Hill's Pond Dallin School, install catch basin .


12


139.1


286.07


8


45.


1,144.96


10


120.


709.28


Day Street, through Private Lands from Day Street northerly and northeasterly to rear of #10 Day Street and #74 Valentine Road (started in 1962)


617.26


*Dothan Street, from Thesda Street northerly.


12


507.


Florence Avenue, across Florence Avenue through easement . to Concord Turnpike


15


135.


1,829.44


Forest Street, at Mill Brook install overflow pipe - install grate near #35


5


80


843.64


Forest Street, between Railroad Bridge and Bow Street - raise manhole ·


147.65


Hutchinson Road, at Winchester Road, repair catch basins and replace grates . .


333.70


. ** Lorne Road, incomplete


12


253.


*** Mill Street, from Mill Brook northerly (Chapter 782)


10


221.


36


25. 270.6


7' x 5' corr


·


steel


12


256.4


.


·


·


·


*Pheasant Avenue, including Outlet Drain, from Dickson Avenue westerly. .


255


DEPARTMENT OF PUBLIC WORKS


STORM DRAINS


##Mill Brook Culvert, extension of Mill Brook Culvert rear of High School Addition .


159.48


TABLE III (Continued)


STORM DRAINS


Size of Pipe in Inches


Length in Feet


Net Cost


Private Lands, from Tower Road to Pheasant Avenue,


relay certain sections of main ..


15


124.


$ 2,022.23


Ridge Street, #115 Ridge Street install Irving Decker frame & grate . Ridge Street, opposite #69 install grate curb to curb . .


530.06


Spring Street, renewal of main between Highland Avenue and High Haith Road


18


351.9


1,862.28


Summer Street, vicinity of Landfill area - install basin and connection . .


12


56.4


1,005.08


and extend storm drain from that point to side line of Rockaway Lane and Summer Street . .


12 C.I.


32.


772.43


Summer Street, relay storm drain between Harold Street and Arthur Street - started in 1962


47.01


Symmes Hospital - raise manhole.


218.81


** Thesda Street, from Dothan Street easterly to Outlet


15


125.9


3


24


44.6


Tomahawk Road, install drain from dead end of Tomahawk Road, ap. #19, northerly Walnut Street - started in 1962.


12


268.


2,837.96


864.41


** Winchester Road, from Stone Road to Greenwood Road . #General Expense .


12


266.2


4,724.21


$21,314.72


*Installed by Contractors in connection with Street Construction


** Installed by Town in connection with Street Construction


*** Installed by Contractor in connection with Reconstruction of Streets #Stock, $2,274.16; Miscellaneous and Tools and Equipment, $2,112.20; Holidays, $337.85 ##Paid for under High School Additions and Reconstruction Committee appropriation.


ARLINGTON TOWN REPORT


256


·


·


.


Summer Street, construct manhole over State storm drain ·


12 R.C.


12.5)


358.76


IMPROVEMENT OF DRAINAGE SYSTEM (Articles 27 - 1961; 37 - 1962; 34 - 1963)


Appropriation . Balance brought forward


$30,000.00 10,360.66


40,360.66


Expenditure. . .


40,360.66


December 31, 1963 .


00


The following storm drains were installed under Contract -


Waldo Road Outlet Main, from Alewife Brook to west of Teel Street . - 496.3 - 30" pipe Warren Street Outlet Main, from Warren St. to Mt. Pleasant Cemetery - 220.3 - 27" pipe


DEPARTMENT OF PUBLIC WORKS


257


258


ARLINGTON TOWN REPORT


TABLE IV SANITATION DIVISION


Appropriation


Credit from Articles 6 and 7


$215,185.00 8,300.09


$223,485.09


(Labor


$171,063.09 Expenses 52,422.00)


Expenditure, including Accounts Payable 217,000.77 $ 6,484.32


Balance, December 31, 1963.


Expenditure


Garbage Collection .


$ 5,451.86


Ashes, Paper and Rubbish


145,774.08


Maintenance of Sanitary Landfill Areas


47,125.55


Accounts Payable .


220.00


Sick Leave


4,869.29


Vacations and Holidays


13,559.99


$217,000.77*


* Labor


$156,471.73 60,529.04


GARBAGE DISPOSAL


Appropriation


$115,000.00


Expenditure.


115,000.00


December 31, 1963.


.00


Expenses


SEWER EXTENSIONS


TABLE V


Appropriation


$25,000.00


Balance brought forward .


2,645.36


Credit from Article 6 .


574.00


28,219.36


Expenditure ..


21,068.89


Balance, December 31, 1963. .


(Carried forward to 1964)


$ 7,150.47


Size of Pipe in Inches


Length in Feet


Net Cost


Bay State Road, from present end northerly to easement .


8


65.


$ 358.02


Day Street, easterly and westerly of easement. .


8


281.


2,438.45 W


Elwern Road, from existing manhole at easement northerly to Winchester Line . .


8


171.3


1,150.57 W


Gould Road, relay force main at sewer chamber


4


200.


806.92


Lennon Road, from Summer Street southerly - incomplete.


8


81.8


8


436.17


8


194.7


1,425.55 W


8


342.


6,761.24


#17 Reed Street, Construct Chamber - started in 1962 Ridge Street, from #78 southerly to easement .


8


49.


495.55


** Rockaway Lane from Summer Street to its end Rublee Street, from its present end westerly. .


8


379.5


W


8


116.


888.37 W


*** Rublee Street, from Wollaston Avenue towards Williams Street


8


377.


1,279.03 W


*** Spy Pond Parkway, northeasterly from present end to owner's property line .


8


78.


292.33 W


** Spy Pond Parkway, from its present end to near Spy Pond Lane Standish Road, install pedestal for electric equipment for pump


8


182.


W


chamber .


63.27


·


·


·


·


·


·


DEPARTMENT OF PUBLIC WORKS


259


.


1,796.60


**** Pheasant Avenue, including Outlet Sewer - from Dickson Ave. westerly . Private Lands, from Dow Avenue to Day Street, including Day St. Outlet Reed Street and Thesda Street, from present end on Reed Street to Thesda Street . .


286.38 W


*Lorne Road, from present end easterly .


TABLE V (Continued)


SEWER EXTENTIONS


Size of Pipe In Inches


Length in Feet


Net Cost


Summer Street, from main in Summer Street northerly side of Harold Street westerly - started in 1962.


#General Expense . .


. . ·


$ 204.11 W 2,822.50


$21,068.89


*Installed by Town in connection with Street Construction ** Installed by Developer *** Installed by Town and Developer


**** Installed by Contractor in connection with Street Construction #Stock, $947.19; Tools and Equipment, $420.48; Miscellaneous, $984.06; Holidays, $470.77


"W" indicates Water in same trench


SANITARY SEWER - MADISON AVENUE


(Article 58 - 1961)


Balance brought forward .


$484.78 Returned to Treasury . .


484.78


December 31, 1963. .


.


.00


260


ARLINGTON TOWN REPORT


261


DEPARTMENT OF PUBLIC WORKS


TABLE VI SEWER MAINTENANCE DIVISION


Appropriation


$ 38,125.00


Credit from Article 6 and 7 1,354.09


$ 39,479.09


(Labor $24,879.09


Expenses 14,600.00)


Expenditure, including Accounts Payable


39,342.30


Balance, December 31, 1963.


$ 136.79


Expenditure


Resurfacing.


$ 703.54


Care and Repair of Particular Sewers


5,094.25


Care and Repair of Mains


20,988.19


Care and Repair of Sewer Pumps


10,713.92


Accounts Payable .


698.40


Holiday.


942.72


Stock


Cr. 745.55


Tools and Equipment.


946.83


$ 39,342.30


ARLINGTON WATER WORKS Arlington, Middlesex County, Massachusetts


Population by census of 1960, 49,953.


Date of Construction Low Service System, 1872; High Service, 1894.


By whom owned, Town of Arlington.


Source of Supply - Metropolitan Water System.


Consumption


1. Estimated total population at date, 50,500.


2. Estimated population on lines of pipe, 50,500.


3. Estimated population supplied, 50,500.


4. Total consumption for the year 1,762,913,500.


5. Percentage of consumption metered, 100%.


6. Average Daily Consumption 4,829,900.


7. Gallons Per Day Per Capita, 94.


Distribution


(Including Auxiliary Supply from Old Reservoir)


Mains


Four thousand, four hundred twenty-six (4,426) feet of new water mains were laid during the year and connected with the Metropolitan System. De- tails of regular water main installation will be found in Table VIII.


1. Kind of pipe; cast-iron, cement and transite.


2. Sizes, from 4 inch to 16 inch.


3. Extended feet during year, 4,426.


4. Number of feet renewed during year, 0.


5. Discontinued during year, 0.


6. Total now in use, 124.13 miles.


262


ARLINGTON TOWN REPORT


7. Cost of repairs per mile, $237.70.


8. Length of pipe less than 4 inches in diameter, 0.


9. Number of hydrants added during year, 8.


10. Number of hydrants now in use, 1,334.


11. Number of stop gates added during year, 17.


12. Number of stop gates now in use, 3,122.


13. Average pressure on mains at center of Town, 110 high system, 80 low, system.


Services


Eighty-nine (89) services have been added during the year and 4 aband- oned. There are for all purposes, except fire, 4,352 on the low, 7,826 on the high and 5 on the Old Reservoir system. On the Metropolitan water supply there are 98 for municipal purposes, 48 sprinkler services, and 50 for sewer flushing purposes included in the above. On January 1, 1964 there were 181 services temporarily out of use.


1. Kind of pipe: copper, cement-lined, black wrought iron, lead and 3" to 6" cast iron and transite.


2. Sizes, 1 inch to 6 inch.


3. Number of service taps added during year, 89.


4. Number of services abandoned during year, 4.


5. Number of services now in use, 12,183.


6. Percentage of services metered, 100%.


Meters


Eighty-nine (89) meters were set during 1963 on services installed in 1962-1963. The total number of meters in use January 1, 1964 was 12,183.


TABLE VII WATER MAINTENANCE DIVISION


Appropriation 1963


Labor. .


$122,000.00


Expenses


50,000.00


$172,000.00


Article #6


6,087.00


Article #7


360.18


$178,447.18


Expenditures 1963


Labor.


$123,137.97


Expenses


52,693.35


175,831.32


Accounts Payable .


1,254.44


Balance, December 31, 1963.


1,361.42


DISTRIBUTION OF EXPENDITURES


Maintenance


Expenditures


Services - Care, Repair and Renewals .


$ 63,588.33


Meters - Care, Repair and Reading .


31,604.98


Shop. .


6,059.10


Tools and Equipment.


5,680.56


Hydrants and Gates - Care and Repair


12,743.36


Mains - Care and Repair


16,762.13


Calgon Chambers .


1,106.95


Reservoir and Great Meadows


953.91


*General Expense


37,332.00


$175,831.32


*Stock, $15,838.59; Holidays, $5,183.10; Vacations, $6,828.76; Sick Leave $6,016.47; Miscellaneous, $3,465.08.


263


DEPARTMENT OF PUBLIC WORKS


CAPITAL OUTLAY


Balance 1/1/63


$ 1,376.34 228.25


Returned to Treasury


$ 1,148.09


Appropriation


16,115.00


Total


$ 17,263.09


Expenditure.


16,412.99


Balance 12/31/63


$ 850.10


EXTENSION OF SERVICES - HOUSE CONNECTIONS


Appropriation 1963


Labor.


$ 3,175.00


Article 6.


159.00 $ 3,334.00


Expenses


9,025.00


$ 12,359.00


Expenditures 1963


*Bills


$ 4,522.24


Extension of Services


5,126.02


Holidays


45.59


Total


$ 9,693.85


Accounts Payable


$ 156.57


Balance 12/31/63


$ 2,508.58


*Installation on Private Property - Reverts to Town Treasury


ARTICLE #38


Improvement of Volumes and Pressures


Balance 1/1/63


$ 245.40


Expenditures 1963


000.00


Balance 12/31/63


$ 245.40


TABLE VIII


Balance 1/1/63


$15,534.25


Appropriation Article #6


1,334.00


Labor


$14,608.07


$36,868.25


Expenses


17,963.82


32,571.89


Balance 12/31/63


$ 4,296.36


EXTENSION OF HIGH SERVICE SYSTEM


Description


Size of Pipe In Inches


Length In Feet


Hydrants


Gates


Total Cost


Day St. - Rhinecliff St. Wly.


8


428


1


1


$ 3,390.58 S


Elwern Rd. - Old end to Winchester Line


8


174


1


1


1,253.46 S


Grove St. - Relocate 2 hydrants


939.59


Lennon Rd. - Summer St. Sly.


286.38 S


Lennon Rd. - Blossom St. Nly ..


789.44


5 Perth Rd. - Old end to Third St.


8


437


S


2 Pheasant Ave. - Fabyan St. to Dickson Ave. Plymouth St. - Relocate hydrant .


8


381


1


2


393.50 S


3 Rockaway Lane - Entire length. Rublee St. - Wollaston Ave. Nly. Summer St. - At Rockaway Lane. Summer St. - At King St. - Relocate hydrant.


6


41


1,377.14


5 Summer St. - Harold St. Wly.


6


166


1


6


123


1


313.53


Symmes Hospital - Relocate hydrant. Symmes Hospital - Woodside Lane to Hospital Yerxa Rd. - Ridge St. Swly.


8


655


2


2


6,082.32


8


97


2,572.08


1 General Expense .


Cr. 2,428.66


TOTAL HIGH SERVICE SYSTEM.


2998


6


11


$19,844.12


EXTENSION OF LOW SERVICE SYSTEM


Decatur St. - Decatur St. to M.V.P. Pkwy. .


6


101


1


Lakehill Ave. - Old End Nly. . . .


·


6


40


1


$ 948.32 436.44 S


264


ARLINGTON TOWN REPORT


162.40


451.61 S


216.93


4 Symmes Hospital - Relocate main.


8


496


1


1


3,048.91 S


2


482.61 S


512.30


.


·


20,000.00


EXTENSION OF LOW SERVICE SYSTEM (Continued)


Description


Size of Pipe in Inches


Length In Feet


Hydrants


Gates


Total Cost


Mystic Valley Pkwy. - Davis Ave. to Mt. Pleasant Cemetery . . .


8


396


1


2


$ 6,495.02


Mystic Valley Pkwy. - Medford St. to Maynard St. . . ·


8


302


1


1


3,024.12


Spy Pond Pkwy. - Easement to Bay State Rd. .


8


348


1


1,476.58 S


3 Spy Pond Pkwy. - Old end Nely. .


8


241


347.29 S


TOTAL LOW SERVICE SYSTEM.


1428


2


6


TOTAL EXTENSIONS .


4426


8


17


$12,727.77 32,571.89


1 Miscellaneous $136.78; Tools & Equipment $324.50; Holidays $273.27; Stock Credit $3,163.21.


2 Installed under Street Construction Appropriation.


3 By Developer.


4 By Contractor.


5 To complete 1962 Installation.


DEPARTMENT OF PUBLIC WORKS


265


·


.


TABLE IX


WATER MAINS IN SERVICE


LOW SERVICE SYSTEM


HIGH SERVICE SYSTEM


RESERVOIR SYSTEM


SIZE


CAST IRON PIPE*


TRANSITE PIPE


CAST IRON PIPE


TRANSITE PIPE


CAST IRON PIPE


TRANSITE PIPE


Inches


Hyds


Gate


Hyds


Gate


Hyds


Gates


Hyds


Gates


Length in Feet


Hyds


Gates


Hyds


Gates


16


2,388


12


7,339


42,279


7,919


1,796


10


16,497


2,737


23,554


2,190


270


8


41,374


39,383


108,634


95,248


2,156


6


102,080


1,947


144,039


3,112


4,175


5,196


4


160


578


220


167,290


447


948


44,067


321,054


877


2,149


109,047


8,797


5,196


Total Length of Mains in Service January 1, 1964 - 655,451 ft. or 124.13 miles Total Number of Gates in Service January 1, 1964 - 3,122 Total Number of Hydrants in Service January 1, 1964 - 1,334.


266


ARLINGTON TOWN REPORT


Length in Feet


Length in Feet


Length in Feet


Length in Feet


Length in Feet


267


DEPARTMENT OF PUBLIC WORKS


WATER DIVISION Receipts for Water Consumed


Year


1954


$244,397.67


1955


305,112.53


1956


296,800.60


1957


327,058.39


1958


310,085.52


1959


310,928.47


1960


320,593.35


1961


337,850.07


1962


338,599.00


1963


442,394.23


Percentage of receipts from metered water 85.7%


WATER RATES COMMITTED DURING 1963


January 1


$ 31,257.15


February 1


23,709.02


March 1


24,565.21


April 1.


44,237.11


May 1.


35,948.75


June 1


40,356.82


July 1.


50,332.69


August 1.


44,714.40


September 1


51,438.07


October 1 .


65,134.99


November 1.


42,377.63


December 1.


43,111.68


Total


$497,168.52


VALUE OF WATER FURNISHED FREE TO TOWN DEPARTMENTS


School


$ 6,335.92


Selectmen .


4,175.32


Cemetery


3,494.35


Library


305.44


Park


4,006.07


Public Works.


3,349.37


Total


$ 21,666.47


1963 EXPENDITURES


Water Maintenance


$177,085.76


House Connections


9,850.42


Capital Outlay .


16,412.99


Water Extensions .


32,571.89


*Metropolitan Assessment.


207,990.00


Total


$443,911.06


.


*Payment in 1963 for consumption of 1,733,239,000 gallons in 1962 at $120.00 per one million gallons.


Payment in 1964 will be $211,549.62 for consumption of 1,762,913,500 gal- lons in 1963 @ $120.00 per one million gallons.


268


ARLINGTON TOWN REPORT


* 1963 RECEIPTS


Rates .


$442,394.23


Liens added to Taxes


11,538.99


House Connections


6,832.74


Construction


691.85


Miscellaneous


420.00


Total


$461,877.81


UNPAID DECEMBER 31, 1963


Rates


$ 74,102.54


Liens added to Taxes


1,118.11


Tax Title


251.72


Total


$ 75,472.37


*Includes rates committed in 1962.


TABLE X


SIDEWALK AND EDGESTONES (Article 32 - 1963)


$ 20,000.00


Balance brought forward


3,901.55


Credit from Article 6 .


760.00


Expenditure.


23,534.10


Balance, December 31, 1963.


$ 1,127.45


(Carried forward to 1964)


ALTERATION, IMPROVEMENTS, ETC. OF BUILDINGS IN NEW YARD (Article 38 - 1962)


Balance brought forward $ 10,545.49


Expenditure. .


4,733.49


Balance, December 31, 1963.


$ 5,812.00


(Carried forward to 1964)


HEADQUARTERS FOR ARLINGTON POST 1775 - VETERANS OF FOREIGN WARS INC. OF THE UNITED STATES (Article 93 - 1960)


Balance brought forward $ 422.04


Expenditure. .


47.89


Balance, December 31, 1963 $ 374.15


(Carried forward to 1964)


ROBBINS MEMORIAL TOWN HALL


Appropriation


$ 42,723.00


Balance brought forward 5,957.16*


Credit from Articles 6 and 13. 1,102.25


$ 49,782.41


(Personal Services $27,952.25


Expenses . 15,873.00


*Capital Outlay.


5,957.16)


Appropriation


$ 24,661.55


DEPARTMENT OF PUBLIC WORKS


269


Expenditure, including Accounts Payable $ 42,938.88 Balance, December 31, 1963.


$ 6,843.53 **


( ** Capital Outlay, $5,701.30 carried forward to 1964)


MAINTENANCE OF HOUSES OWNED BY THE TOWN


Appropriation


$ 9,950.00


Credit from Article 6


160.50


$ 10,110.50


(Personal Services $6,169.50


Expenses 3,941.00)


Expenditure, including Accounts Payable


9,439.65


Balance, December 31, 1963. $ 670.85


IDA ROBBINS TRUST FUND


Balance brought forward


$ 6,952.38


Credit Interest for 1963.


1,057.62


Expenditures


194.58


Balance, December 31, 1963.


$ 7,815.42


PAVE MUNICIPAL PARKING AREA (Article 27 - 1963)


Appropriation


$ 18,060.00


Expenditure. .


11,910.24


Balance, December 31, 1963.


$ 6,149.76


(Carried forward to 1964)


PARKING AREA REAR OF RAILROAD AVENUE (Article 64 - 1963)


Appropriation


$ 7,900.00


Expenditure.


4,902.20


Balance, December 31, 1963.


$ 2,997.80


(Carried forward to 1964)


CONSTRUCTION OF WAYS (1960) (Article 52 - 1960)


Balance brought forward $ 5,506.01


Returned to Treasury 506.01


$ 5,000.00


Expenditure.


0


Balance, December 31, 1963.


(Carried forward to 1964) $ 5,000.00


8,010.00


(Carried forward to 1964)


270


ARLINGTON TOWN REPORT


CONSTRUCTION OF WAYS (1960) (Article 63 - 1960)


Balance brought forward $ 15,613.84


Returned to Treasury . 10,613.84


Expenditure.


$ 5,000.00 0


Balance, December 31, 1963.


$ 5,000.00


CONSTRUCTION OF WAYS (1959)


Balance brought forward


$ 1,146.30


Returned to Treasury .


146.30


$ 1,000.00


Expenditure.


896.51


Balance, December 31, 1963.


$ 103.49


(Carried forward to 1964)


CONSTRUCTION OF WAYS (1958)


Balance brought forward


$


1,000.00


Expenditure.


0


Balance, December 31, 1963. $ 1,000.00


(Carried forward to 1964)


EASEMENTS IN LAND - 1963


Appropriation


$ 500.00


Expenditure.


0


Balance, December 31, 1963.


$ 500.00


(Carried forward to 1964)


EASEMENTS IN LAND - 1962


Balance brought forward $ 700.00


Expenditure.


0


Balance, December 31, 1963.


$ 700.00


(Carried forward to 1964)


EASEMENTS IN LAND - 1961


Balance brought forward


$ 800.00


Returned to Treasury


800.00


December 31, 1963


.00


I wish to thank all Personnel of the Department of Public Worksfor their co-operation.


I also wishto express my sincere appreciation to the Town Manager, the Board of Selectmen, the various Boards, Trustees, Commissioners and De- partment Heads.


Respectfully submitted,


Francis N. O'Hara Superintendent of Public Works


(Carried forward to 1964)


LIST OF JURORS


REVISED AND APPROVED BY THE BOARD OF SELECTMEN JANUARY 6, 1964


NAME


RESIDENCE


PRESENT (LAST) OCCUPATION AND NAME AND ADDRESS OF PRESENT (LAST) EMPLOYER. IF MARRIED WOMAN, HUS- BAND'S BUSINESS OR OCCUPATION AND NAME AND ADDRESS OF HIS EMPLOYER.


Abel, James


14 Field Road


Carpenter, Harvard University, Cambridge


*Accetta, Frank C.


17 Newport Street


Printer, Acme Print, 2010 Riverbeach Parkway, Everett Accountant, John H. Pray & Sons Co., Boston


*Ahern, Philip D.


17 Beacon Street


Aiken, John J.


88 Melrose Street