Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 | Part 18 | Part 19 | Part 20 | Part 21 | Part 22 | Part 23 | Part 24 | Part 25 | Part 26 | Part 27 | Part 28 | Part 29 | Part 30 | Part 31 | Part 32 | Part 33 | Part 34 | Part 35 | Part 36 | Part 37 | Part 38 | Part 39


2


Counter, under 100 lbs.


7


45


1


Beam, 100 to 5,000 lbs.


1


Spring, 100 to 5,000 lbs.


17


Spring, under 100 lbs.


62


127


4


Computing, under 100 lbs.


67


151


2


Person weigher (slot).


30


Prescription


13


14


Weights


Avoirdupois


161


Apothecary


18


161


Metric


11


62


Volumetric Measures


Vehicle Tanks (compartments)


6


Liquid Measures over 1 gal.


10


Liquid Measures


119


Automatic Liquid-Measuring Devices


Gasoline Meter Systems 63 162


4


4


4


Con- justed Sealed Sealed demned


539


SEALER OF WEIGHTS AND MEASURES


Tank Truck Meter Systems · 24


28


Grease-Measuring Devices 21


93


3


1


Linear Measures


Yard Sticks


37


8


Cloth-measuring Devices


2


Totals


322


1,276


3


29


Trial Weighings and Measurements of Commodities Sold or Put up for Sale.


Commodity


Total Number Tested


Number Correct


Incorrect Under Over 6


Beans


6


Bread


92


51


8


33


Butter


234


180


24


30


Coal (in paper bags)


5


3


2


Confectionery


8


8


Dry Commodities


134


96


14


24


Flour


14


6


2


6


Fruits and Vegetables


28


7


21


Lard


9


9


Liquid Commodities


21


20


1


Meats and Provisions


23


21


1


1


Potatoes


129


53


62


14


Wood (kindling)


1


1


Cinders


1


1


Sand and Gravel


14


1


3


10


Hot Top


4


1


3


Totals


723


447


140


136


The above detailed account of re-weighings and pack- age goods inspections proves the value of diligent search along these lines. A re-check of several of the sealed de- vices have been made to insure their accuracy.


Seven prosecutions were necessary during this year,


540


ARLINGTON TOWN REPORT


and in several cases restitution was made satisfactorily to all involved. All seven defendants were found guilty and ninety-five dollars was paid in fines and in three cases, placed on file.


Re-weighing of Coal in transit has been very care- fully followed up in addition to deliveries made to the Arl- ington School Department, all were found to be correct.


One thousand two hundred seventy-six weights and measures were inspected and sealed, three hundred twenty- two adjusted, three not sealed, and twenty-nine condemned. Sealing fees amounting to two hundred sixty-seven dollars and eighty-one cents ($267.81) were received and paid over to the Town Treasurer. The Town Treasurer also received ($275.00) for Hawker and Peddler licenses.


Respectfully submitted, ALLAN E. COWIE,


Sealer of Weights and Measures.


541


REPORT OF THE BOARD OF PUBLIC WORKS


REPORT OF THE BOARD OF PUBLIC WORKS


The Board of Public Works herewith submits its annual report for the year ending December 31, 1940.


At the Town Meeting held on March 4 ,1940, Loren W. Marsh was elected member of the Board for the term of three years. The Board organized on March 11 with the choice of Willard A. Wallace as chairman.


MEETINGS


The meetings are held Monday evenings. During the year the Board held fifty-two regular and three special meet- ings.


The following are the net expenditures made under the direction of the Board:


Highway, Maintenance and General


$82,047.22


Highway, Capital Outlay 525.17


Highway, Reconstruction of Streets


0


1940 Street Construction


54,176.28


1939 Street Construction 8,685.56


Snow and Ice


65,107.53


Special Appropriation, Equipment for Snow


Removal


25,504.02


Storm Drains


7,639.16


Sanitary (including Capital Outlay)


97,002.52


Sewer Extensions


11,381.29


Sewer Maintenance


5,902.50


Water Extensions


23,414.98


Water Maintenance


64,462.26


General Administration 18,921.96


1938 Street Construction


147.99


1937 Street Construction


126.99


1936 Street Construction


0


1935 Street Construction


0


542


ARLINGTON TOWN REPORT


1933 Street Construction 0


1931 Street Construction 0


1930 Street Construction 0


1929 Street Construction


0


Special Appropriation, Arlmont Village Sewer Extension


0


Special Appropriation, Arlmont Village Water Extension 0


Extension of Water Main, Pleasant View Road and Brunswick Road


0


Sale of Town Yard Buildings and Equipment. 0


Special Wages Appropriation 9,000.09


$474,045.52


HIGHWAY DIVISION


In the Maintenance Department of the Highway Divi- sion, Fifteen thousand, six hundred twelve and 66/100 ($15,612.66) Dollars were spent for the Cleaning of Streets ; and Three thousand, nine hundred seventy-nine and 58/100 ($3,979.58) Dollars for the Maintenance and Repair of Pub- lic Ways exclusive of Massachusetts Avenue for which an expenditure of One hundred eighty-four and 36/100 ($184.36) Dollars was made.


For the Care and Repair of the Storm Drain System the sum of Nine thousand, seventy-one and 03/100 ($9,- 071.03) Dollars was expended.


This year there was expended for the Maintenance of Gravel Sidewalks One thousand, six hundred forty-five and 93/100 ($1,645.93) Dollars and for the Maintenance of Permanent or Granolithic Sidewalks, Six thousand, four hundred fifty-one and 98/100 ($6,451.98) Dollars.


The sum of Three thousand, one hundred eighteen and 32/100 ($3,118.32) Dollars was expended for Tar and Sand Protective Treatment on the Tar and Gravel and older Macadam streets.


543


REPORT OF THE BOARD OF PUBLIC WORKS


The Board was fortunate this year in obtaining Chapter 90 Maintenance Assistance, the State and County contribut- ing One thousand and 00/100 ($1,000.00) Dollars each for the maintenance of Chapter 90 streets in Arlington. With this amount, and with funds furnished by the regular High- way Maintenance Appropriation, the following maintenance work was accomplished-


Lake Street, part of street and sidewalk resurfaced, Six hundred and twenty-one and 80/100 ($621.80) Dollars; Park Avenue Shoulder Reconstruction, from Oakland Ave- nue to Prospect Avenue on the easterly side, One thousand eight hundred ninety-six and 87/100 ($1,896.87) Dollars; Appleton Street, general surface maintenance, One hundred twenty and 52/100 ($120.52) Dollars; Mystic Street, near Winchester Line sealed, One hundred seventy-two and 88/100 ($172.88) Dollars; Massachusetts Avenue, street surface repairs, One thousand fifty-six and 80/100 ($1,- 056.80) Dollars.


The Boston Elevated Railway this year did extensive work on Massachusetts Avenue relaying rails and rebuild- ing the roadbed. In addition to this work they also agreed to furnish necessary materials to enable the Town to reset and repair approximately Twelve hundred (ap. 1200) square yards of browstone adjacent to their rails, the Town furnishing the labor, trucking, roller and compressor. Due to the cooperation of the Boston Elevated Railway the Town's cost for this work was only Two thousand eighty and 87/100 ($2,080.87) Dollars.


NEW STREET CONSTRUCTION


This year the following streets were accepted by the Town to be constructed under the direction of the Board of Public Works:


544


ARLINGTON TOWN REPORT


Aberdeen Road, from its present end westerly about fifty feet.


Bates Road, from Massachusetts Avenue to Broadway. Bellington Street, from the Concord Turnpike to East- ern Avenue.


Burton Street, from Massachusetts Avenue to Appleton Place.


Chester Street, from Park Avenue to No. 64.


Fisher Road, from Bellington Street to Eustis Street.


Jason Street, from Brantwood Road to and including Lot 142.


Mary Street, from its present end to Littlejohn Street. Newport Street, from Eastern Avenue to Arlmont Street.


Newport Street, from Eastern Avenue to Longfellow Road.


Sutherland Road, from Lorne Road to Aberdeen Road. Walnut Terrace, from its present end to Walnut Street. White Street, from Margaret Street to Burch Street.


For cost of Town expenditures to date for materials, equipment, etc. see Detail of 1940 Street Construction under "Table I, Highway".


545


REPORT OF THE BOARD OF PUBLIC WORKS


TABLE I


HIGHWAY DIVISION


MAINTENANCE AND


Appropriation for 1940 $81,026.33 Received from State and


GENERAL ACCOUNT


( Maintenance, etc, .$82,693.00


County


2,000.00


Inspector's Salary 333.33)


83,026.33


Expenditure


82,047.22


Balance, Jan. 1, 1941 $ 979.11


Expenditure


Maintenance of Highways


$46,013.60


*General Account


36,033.62


$82,047.22


*Stock, $587.04; Automobile, $1,253.13; Town Yards and Buildings, $8,653.59; Tools and Equipment, $6,078.31; Street Signs, $3,634.88; Miscellaneous, $2,809.59; Saturday Afternoons, Vacations and Holidays, $11,654.95; General Foreman, $2,616.67 ; Inspector's Salary, $333.32; Credit for use of Compressor, $428.43; Credit for use of Tractor, $220.20; Credit for use of Roller, $939.23.


CAPITAL OUTLAY


Appropriation $579.00 Balance carried forward from 1938 147.05


$726.05


Expenditure *525.17


Balance Jan. 1, 1941 $200.88 (Carried forward to 1941)


*1 Ford Sedan


RECONSTRUCTION OF STREETS


Balance carried forward from pre-


vious years $ 10.73


Expenditure


0


Balance, Jan. 1, 1941 $ 10.73 (Carried forward to 1941)


1940 STREET CONSTRUCTION


Appropriation for 1940


$88,198.00


Expenditure


54,176.28


Balance, January 1, 1941


$34,021.72


(Carried forward to 1941)


Expenditure


Aberdeen Road, from its present end westerly about 50 feet


$ 239.02


Bates Road, from Massachusetts Avenue to Broadway


*


13,196.93


Bellington Street, from the Concord Turnpike to Eastern Ave.


10,719.46


Burton Street, from Massachusetts Avenue to Appleton Place * 4,236.97


Chester Street, from Park Avenue to No. 64 *


7,599.14


Fisher Road, from Bellington Street to Eustis Street


2,119.22


Jason Street, from Brantwood Road to and including Lot. No. 142 Mary Street, from its present end to Littlejohn Street


* *


3,815.42


Newport Street, from Eastern Avenue to Arlmont Street


*


2,845.78


Newport Street, from Eastern Avenue to Longfellow Road Sutherland Road, from Lorne Road to Aberdeen Road Walnut Terrace, from its present end to Walnut Street


2,721.39


*


1,627.48


*


2,062.55


White Street, from Margaret Street to Burch Street


$54,176.28


*These streets not completed in 1940. To be completed in 1941. The general labor was furnished by W. P. A.


*


2,925.99


66.93


546


ARLINGTON TOWN REPORT


1939 STREET CONSTRUCTION


Appropriation (Carried forward from 1939)


$14,609.02


Transferred to "Snow and Ice" Appropriation by vote of Town Meeting Oct. 14, 1940


$2,000.00


Expenditure


8,685.56


10,685.56


Balance, January 1, 1941


$ 3,923.46


(Carried forward to 1941)


1940 Expenditure


Final Cost*


Buena Vista Road, from Gray Street to Lot No. 71.


$2,959.57


$ 4,985.57


Dorothy Road, from Margaret Street to present end


8.50


5,299.89


Fayette Street, from Eastern Avenue to 125 feet south of Fisher Road


104.40


5,396.20


Fisher Road, from Bellington Street to Hillcrest St.


97.34


7,270.88


Hillside Ave., from, Prospect Ave. to Wachusett Ave.


105.80


6,076.31


Newland Road, from Blossom Street to Summer St ...


1,731.77


6,270.18


Newland Road, from Summer Street to Forest St.


2,764.03


7,096.05


Wildwood Avenue, from Lockeland Avenue to Highland Avenue


43.55


4,731.37


Winchester Road, from Hutchinson Road to


870.60


15,170.20


$8,685.56


These streets started in 1939, completed in 1940.


*This final cost includes money expended in 1939.


SNOW AND ICE


Appropriation for 1940


$63,212.08


Additional Appropriation


2,000.00


$65,212.08


Expenditure


65,107.53


Balance, January 1, 1941


$ 104.55


Expenditure


Tools and Equipment


$ 4,062.09


Plowing and Widening Out Streets.


7,916.86


Plowing and Shoveling Sidewalks


3,640.35


Opening Gutters and Crosswalks


2,133.64


Hauling Away Snow


38,983.23


Sanding


5,793.32


Miscellaneous


1,092.88


Saturday Afternoons and Holidays


1,485.16


$65,107.53


EQUIPMENT FOR SNOW REMOVAL-SPECIAL APPROPRIATION


Appropriation for 1940


$26,900.00


Balance from 1939


581.28


Expenditure


25,504.02


Balance, January 1, 1941


$ 1,977.26


( Carried Forward to 1941)


*1 Barber-Greene Snow Loader


2 International Tractors with Trailbuilders


1 International Tractor with V Plow


$27,481.28


120 feet south of Bradley Road


547


REPORT OF THE BOARD OF PUBLIC WORKS


TABLE II


STORM DRAINS


Appropriation for 1940


$ 8,000.00


Balance from 1939


5,562.26


$13,562.26


Expenditure


7,639.16


Balance, January 1, 1941


$ 5,923.10 (Carried forward to 1941)


Location


Size of Pipe in Inches


Length in Feet


Net Cost


Amsden Street


*Arlmont Street (outlet, Private Lands to


24"


392.55


Concord Pike)


30"


169.6


** Bates Road (Entire Length)


12"


645.75


** Bellington Street (Entire Length)


15"


271.53


Cemetery Street (Installed in 1939)


24"


204.00


** Chester Street (Park Avenue northerly) ...


12"


535.00


Hutchinson Road (Materials only, W. P. A.


18"


30.6


labor) (includes Hutchinson Rd., old end to


21"


92.25


Lantern Lane, Private Lands, Old Mystic


24"


2,153.38


5,456.62


Street to Mystic Lake, Winchester Road from Old Mystic Road to Hutchinson Road) *** Roanoke Road


30"


194.3


15"


102.9


24"


102.7


12"


762.2


Wright Street (Installed in 1939)


18"


79.4


Edmund Road (Install catch basin)


152.55


Underpinning wall Mill Brook at Schwamb's| Mill


190.32


Total Cost of Mains


$7,800.77


¡General Expense


Cr. 161.61


Totals


6,480.48


$7,639.16


Tools and Equipment, $12.25; Miscellaneous, $10.24; Saturday Afternoons and Holidays, $253.90; Credit for Stock, $438.00.


* Work Projects Administration labor and Federal Government participation.


** Drains installed in connection with 1940 Street Construction (Work Projects Administration labor and Federal Government material participation.)


Drain installed by Owner.


** *Drain installed by State.


1


1


1,979.91


** *Summer Street (Orient Ave. to Arthur Rd) | Teel Street (Between Massachusetts Avenue and Cross Street)


12"


200.9


15"


283.2


12"


260.22


$21.37


548


ARLINGTON TOWN REPORT


TABLE III


SANITARY DIVISION


Appropriation for 1940


$91,577.00


From Reserve Fund


1,400.00


From Reserve Fund


700.00


Total (Appropriation and Reserve Fund Transfers)


$93,677.00


(Wages, Equipment and Materials


$91,805.00


Personal Services


1,872.00)


Expenditure


93,584.52


Balance, January 1, 1941


$ 92.48


Expenditure


Ashes, Paper and Rubbish


$47 930.68


Oftal


39,831.04


Supplies and Sundries


374.92


Miscellaneous


3,598.75


Personal Services


1,849.13


$93,584.52


SANITARY DIVISION-CAPITAL OUTLAY


Appropriation for 1940


$3,420.00


Expenditure


*3,418.00


Balance, January 1, 1941


$2.00


* 1-3-31/2 ton truck, with packer-type body.


SEWER DIVISION


Four thousand, seven hundred forty-two and 49/100 feet of main sewers were laid during the year, two thou- sand, four hundred seventeen and 39/100 by the Public Works Department, and two thousand, three hundred twenty-five and 10/100 by private developers.


One hundred seventy-one particular sewer connections were made with the mains.


Details of regular sewer construction and maintenance will be found in Tables 4 and 5.


-


549


REPORT OF THE BOARD OF PUBLIC WORKS


TABLE IV


SEWER CONSTRUCTION


Appropriation for 1940


$10,300.00


Balance from 1939


4,394.59


(Extension of Sewers


$10,000.00


Tools and Equipment


300.00


$14,694.59


Expenditure


11,381.29


Balance January 1, 1941


$3,313.30


(Carried forward to 1941)


Location


Size of Pipe in Inches


Length in Feet


Net Cost


Cost per Foot


Buena Vista Road (from present end of main in Spring Avenue to No. 66 Buena Vista Road)


8"


324.73


$1,638.39


$5.05 W


Burton Street (sufficient distance to service No. 20)


8"


77.1


291.07


3.78 W


Cedar Ave. (Between Park Ave. and Concord Turnpike-in progress, not completed) College Avenue (To service No. 7)


190.


1,050.05


5.53 W


Eustis Street (To services Nos. 26-46)


8"


260


745.59


2.87 W


** George Street (approximately fifty feet from present end northwesterly-sewer not in use, no outlet)


8"


168.85


478.74


2.84 W


Intervale Road (from Lake Shore Drive to Cheviot Road)


8"


203.16


346.74


1.71 W


Kelwyn Manor (Inspect mains)


108.02


138.73


1.28 W


Mary Street (To service No. 62)


8"


218.47


1,302.90


5.96


Millett Street (From Lansdowne Road easterly)


80.8


457.63


5.66 W


** Montrose Avenue (From old end to Richfield Road-sewer not in use, no outlet) Mott Street (To service No. 9)


8"


67.6


91.47


1.35 W


24.


134.07


5.59 W


'Total Cost of Mains *General Expense Tools and Equipment


$10,450.25


739.83


191.21


Totals


1,593.88


$11,381.29


550


ARLINGTON TOWN REPORT


W


35.4


308.88


8.73 W


Orchard Place (from main in Massachusetts Ave. to Street Line of Orchard Place) Park Avenue (W. P. A. Project-Relay main from Wollaston Avenue to present end-materials only) ** Summit Street (From present end to service No. 39-sewer not in use-no outlet)


40.62


Mary Street (To service No. 95)


40.


130.84


3.27


Monadnock Road (From old end to Circle)


247.36


791.67


3.20 W


2,081.01


$10,300.00)


421.85


*Stock, Credit $334.26; Miscellaneous, $260.93; Saturday Afternoons and Holidays $813.16. ** These distances not included in total number of feet.


NOTES :


Sewer Mains installed in connection with 1940 Street Construction : Bellington Street-348.14 feet of 8 inch Burton Street-112.75 feet of 8 inch W Newport Street-159.75 feet of 8 inch Sutherland Road-137.87 feet of 8 inch


Sewer Main installed in connection with 1939 Street Construction : Buena Vista Road-65.0 feet of 8 inch W


Sewer Mains installed by Developers : Bay State Road-288.26 feet of 8 inch W Bay State Road-262.3 feet of 12 inch W Cheswick Road-229.65 feet of 12 inch W Orchard Place-385.13 feet of 8 inch W Pioneer Road-240.14 feet of 12 inch W


Putnam Road-157.5 feet of 8 inch W Ridge Street-762.12 feet of 8 inch W


"W" indicates Water Main in same trench.


REPORT OF THE BOARD OF PUBLIC WORKS


551


552


ARLINGTON TOWN REPORT


TABLE V


SEWER MAINTENANCE DIVISION


Appropriation for 1940


$6,565.00


Expenditure


5,902.50


Balance, January 1, 1941


$662.50


Expenditure


Resurfacing


$128.11


Repairing, Flushing and Cleaning Mains


2,946.87


Care and Repair of Particular Sewers


1,324.12


Care and Repair of Sewer Pumps


531.94


Tools and Equipment


511.82


Saturday Afternoons and Holidays


437.23


Miscellaneous


22.41


$5,902.50


SUMMARY OF SEWERAGE STATISTICS


General


Population by census of 1940, 40,013.


Total area of Town, 5.5 square miles.


Area served by sewerage system, 3.70 square miles.


Collection System


For sewerage only, 84.868 miles, includes 5.64 miles Metropolitan sewer.


For sewerage and surface water, 0 miles.


For surface water only, 45.86 miles.


Method of disposal, sewerage into Metropolitan sewer, surface water into brooks.


553


REPORT OF THE BOARD OF PUBLIC WORKS


Collection


Mains. (Everything but house and catch basin connec- tion.)


For sewerage only


For surface only


1. Lineal feet pipe .. .


448,103.52


242,142.50


2. Lineal feet extended dur- ing year


4,742.49


6,480.48


3. Number of inverted syphons, 2.


4. Number of manholes, 2,064, and 86 combination sewer and storm drain manholes.


5. Method of flushing: Water service at manhole ends of lateral lines.


6. Method of cleaning: By a special brush drawn from manhole to manhole.


7. Number of automatic flushing tanks, 0.


8. Number of direct connections with water mains for flushing, 44.


9. The system was flushed only partially this year, ap- proximately 60%.


10. Cost of flushing per mile. $ $27.98


11. Cost of cleaning per mile.


12. Number of stoppages, 7.


13. Method of ventilation, manhole covers.


14. Electric pump chambers, 5.


House Connections


1. By whom made: All connections made under the di- rection of the Sewer Division, Board of Public Works.


554


ARLINGTON TOWN REPORT


2. Sizes, 5, 6, 8, 10, 12 and 15 inches.


3. Number made during year, 171.


4. Lineal feet laid during year (drain layers), 8,236.25.


5. Lineal feet discontinued during year, 0.


6. Total miles in use, 66.51.


7. Number of stoppages coming to attention of Depart- ment, 122.


Discharge of Sewer


1. Estimated population using sewer system, 36,533.


2. Number of buildings connected, 7,259.


3. Daily discharge for year .*


4. Daily discharge for each user .*


5. Daily quantity of factory waste .*


6. Daily leaking into sewers .*


7. Daily leaking per miles of sewers .*


8. Are quantities given under 3 to 7 estimated or meas- ured ?*


*See Metropolitan Sewerage Board Report.


General


Total cost of collecting mains, $1,196,046.01.


Serial Notes, none.


Average rate of interest on bonds outstanding, none.


Proportion of cost of extensions assessed on abutters this year, 46.9%.


Yearly assessment for maintenance, none.


Method of assessing abutters and rate of assessment, as specified by the Acts of 1931, Chapter 140.


555


REPORT OF THE BOARD OF PUBLIC WORKS


WATER DIVISION


Eight thousand, three hundred and fifty-six feet of new water mains were laid during the year and connected with the Metropolitan system. Five hundred and seventy- five feet of mains were renewed during the year. Details of regular water main construction will be found in Table 6.


SERVICES


One hundred and seventy-three new services have been added during the year and eight services were abandoned. There are for all purposes, 3,466 on the low, 4,820 on the high, and 4 on the old reservoir system. On the Metropoli- tan water supply there are 61 services for municipal pur- poses, 34 sprinkler services, and 44 for sewer flushing pur- poses included in the above. On January 1, 1941, 252 services were temporarily out of use.


METERS


One hundred and eighty-four meters were set during 1940 on services installed in 1938, 1939 and 1940. The total number of meters in use January 1, 1941 is 8,198.


A


WATER MAINS NOW IN SERVICE


LOW SERVICE SYSTEM


HIGH SERVICE SYSTEM


RESERVOIR SYSTEM


Size


Cast Iron Pipe


Transite Pipe


Cast Iron Pipe


Transite Pipe


Cement and Cast Iron Pipe


Inches


Length in Feet


Hyd- rants


Gates


Length in Feet


Hyd- rants


Gates


Length in Feet


Hyd- rants


Gates


Length in Feet


Hyd- rants


Gates


Length in Feet


Hyd- rants


Gates


16


2,388


12


7,274


34,633


1,719


7,172


10


16,337


1,228


22,957


2,070


270


8


39,905


8,327


86,535


8,146


2,156


6


102,949


148,793


555


4,175


4


160


220


Totals


166,465


352


622


9,555


295,466


621


1,359


12,490


13,993


6


23


556


ARLINGTON TOWN REPORT


TABLE VI


WATER EXTENSIONS


Balance, January 1, 1940


$1,597.36


Appropriation 1940


24,000.00


Tools and Equipment


600.00


$26,197.36


Expenditure 1940


23,414.98


Balance January 1, 1941


$2,782.38


EXTENSION OF HIGH SERVICE SYSTEM


Description


Size of Pipe ill Inches


Length in Feet


Number of Hydrants


Number ot Gates


Total Cost


Cost per Foot


Totals


1Appleton Place, old end to Burton Street Burton Street, old end to No. 20


67


61


1


S


1Burton Street, old end to Appleton Place


82


1


Buena Vista Road, old end southwesterly


00


83


168


1


3


1,325.45


7.89


199


1


1


1,315.52


6.61


321


2


1,299.68


4.05


175


11


1


1


1


1


744.83


4.18


Intervale Road, Lake Shore Drive to Cheviot Road


322


2


916.48


2.85


Monadnock Road, old end to Circle


84


1


1


718.17


8.55


Montrose Avenue, old end to Richfield Road


8"


330


1


2


1,263.03


3.83


1Newport Street, old end to Eastern Avenue 5Orchard Place, entire length


6"


407


1


2


355.84


3Park Avenue, Wollaston Avenue to Appleton Street Renfrew Street, old end westerly


00


318


1


1


1,256.57


4Ridge Street, Stowecroft Road to Cutter Hill Road


12"


803


2


6


2,418.15


00


32


379.59


6''


271


2


16.47


265


988.57


3.73


13


8


5,173


11


40


$15,481.16


$15,481.16


REPORT OF THE BOARD OF PUBLIC WORKS


557


Total


3Winchester Road, old end to Hutchinson Road Wollaston Avenue, Appleton Street to Piedmont St. Hydrants and Gates Installed by Water Maintenance


67


75


S


Buena Vista Road, Spring Avenue to No. 62 College Avenue, Mystic Street to No. 7


Eustis Street, old end to No. 46


Florence Avenue, old end to No. 263


784.76


4.48


Forest Street connection at Beck Road


336.86


627.74


4.55


Forest Street Place, Forest Street northwesterly George Street, old end to No. 91


138


178


736


2


5


122.64


3.95


11.86


Summit Street, old end to No. 39


101


327.21


3.94


$283.60


$3.78


EXTENSION OF LOW SERVICE SYSTEM


1


3.03


Broadway, northerly side, No. Union St. westerly 1 Kelwyn Manor


8''


1,997


5


19


Mary Street, old end to No. 95


104


1


2.89


S


Mass Avenue, Lafayette Street to Fairmont Street


251


1


3


Michael Street, old end to No. 44


877


169


676.43


4.00


Mott Street, old end to No. 9


68


178.25


2.62


S


Pleasant Street, insulate main at underpass


12"


167.58


Prentiss Road, Mass. Avenue northerly


207


2


13


Total


Total Extensions


RENEWALS-HIGH SERVICE SYSTEM


2Burton Street, Mass. Avenue southerly



49


Schwamb's Mill, at Mill Brook


6''


61


Hydrants and Gates Renewed by Water Maintenance


6-12"


53


6


9


Total


RENEWALS-LOW SERVICE SYSTEM


Park Street Place, entire length Ramsdell Court, entire length


150 171


603.79


3.53


Hydrants and Gates Renewed by Water Maintenance


6-8"


91


8


4


Total


1 ..


1


1


4


603.791


..


1


1 575


14


13


603.79|


1 603.79


Total Extensions and Renewals


8,931


33


90


$22,304.65


$22,304.65


6General Expense


.... ... ...


-


..


1Extended under 1940 Street Construction.


2Renewed under 1940 Street Construction.


3W. P. A. project-Supervision and pipe laying by Public Works Department.


$312.38; Stock Credit, $2,124.43; Valve In. 4Labor by private contractor. 5Pipe and labor by private contractor. Hydrants and Gates and installation by Public Works Department.


"Tools and Equipment, $528.64 ; Miscellaneous, $95.43 ; Lost Time, $829.26; Holidays, sertions, $1,469.05.


"Labor by private contractor-Bay State Road 684 ft. Cheswick Road 224 ft., Putnam Road 197 ft., Pioneer Road 243 ft., Sheraton Park 421 ft., Spy Pond Parkway 228 ft.


"S" indicates sewer in same trench.


ARLINGTON TOWN REPORT


558


1


8


1


37


1 6,018.46


1 ......


1 $6,018.46


...


1 8,356 - 19


1 77


/ 21,700.86 1.


- $21,700.86


-


163 1 6


1


9


1,110.33


1,110.33


Expenditure


$23,414.98 | ..


... $23,414.98


-


412


8


Total Renewals


--


-


-


300


908.23 3,384.82 300.69


603.70


2.92


Hydrants and Gates Installed by Water Maintenance


87


3,183


..


559


REPORT OF THE BOARD OF PUBLIC WORKS


TABLE VII


WATER MAINTENANCE DIVISION


Appropriation 1940


$64,034.00


Reserve Fund


1,000.00